
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
How TeamingIndex verifies data, protects it and connects to your tools.
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
ALPHACORE INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
25 most recent of 52 awards
HQ085926FG182
Recompete 18+ mo: Potential end Dec 28, 2035 (109 months away)SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER.
Department of Defense · Missile Defense Agency
N0002426C3035
Recompete 18+ mo: Potential end Apr 7, 2029 (28 months away)BASE
Department of Defense · Department of the Navy
FA254125CB083
Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)SBIR PHASE II: F2-19001 - SF241-0021 HIGH SPEED OPTICAL INTERCONNECTS FOR EFFICIENT INTRA-SATELLITE DATA TRANSFER IN THE SPACE ENVIRONMENT.
Department of Defense · Department of the Air Force
80NSSC24CA064
Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)FY24 SBIR PHASE II - RADIATION-HARDENED WIDE-TEMPERATURE MIXED-SIGNAL LIBRARY IN A 22NM FDSOI CMOS PROCESS
National Aeronautics and Space Administration
80NSSC24CA065
Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)FY24 PHASE II - RADIATION HARDENED, PROGRAMMABLE BATTERY ANALOG FRONT-END ASIC
National Aeronautics and Space Administration
80NSSC24CA069
Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)FY24 SBIR PHASE II - RADIATION-TOLERANT, HIGH-VOLTAGE BIDIRECTIONAL DC-DC CONVERTER PMIC
National Aeronautics and Space Administration
N0002426C3111
Recompete 6–12 mo: Potential end Jun 17, 2027 (7 months away)SBIR PHASE I TOPIC #N254-P02
Department of Defense · Department of the Navy
N6833524C0221
Recompete < 6 mo: Potential end Apr 15, 2027 (5 months away)RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
80NSSC26C0198
Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)SBIR PHASE I VIPER-S (VERSATILE IMAGER PLATFORM WITH ENHANCED RADIATION HARDNESS - STACKED)
National Aeronautics and Space Administration
FA864923P1211
Recompete < 6 mo: Potential end Feb 1, 2027 (2 months away)FAST-RESPONSE EVENT-BASED IMAGE SENSOR AND CAMERA
Department of Defense · Department of the Air Force
FA864923P0473
Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)UNITED STATES-BASED HIGH-SPEED INPUT/OUTPUT FOR SPACE-BASED DEFENSE APPLICATIONS
Department of Defense · Department of the Air Force
80NSSC25C0131
Completed: Period of performance ended Oct 28, 2026STTR PHASE I NOVEL IMAGING TECHNOLOGIES FOR OPTIMIZED LUNAR SURFACE NAVIGATION
National Aeronautics and Space Administration
FA864926P0370
Completed: Period of performance ended Oct 26, 2026PHOTON COUNTING ENABLED IMAGER FOR EXTRATERRESTRIAL OBJECT OBSERVATION (PHOENIX
Department of Defense · Department of the Air Force
N0002425CS211
Completed: Period of performance ended Oct 9, 2026KICKOFF BRIEFING
Department of Defense · Department of the Navy
N6426724C0080
Completed: Period of performance ended Oct 2, 2026873AUTHORITY
Department of Defense · Department of the Navy
N6833523C0314
Completed: Period of performance ended Oct 1, 2026RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
N6426725C7091
Completed: Period of performance ended Sep 22, 2026873AUTHORITY
Department of Defense · Department of the Navy
FA237726PB001
Completed: Period of performance ended Sep 13, 2026MULTI-KILOVOLT, RAD HARD GALLIUM OXIDE DEVICES AND CONTROL IC
Department of Defense · Department of the Air Force
80NSSC24CA062
Completed: Period of performance ended Jul 26, 2026FY24 SBIR PHASE II - SCALABLE DATA ACQUISITION SYSTEM FOR MKID DETECTORS
National Aeronautics and Space Administration
N6833526C0121
Completed: Period of performance ended May 4, 2026RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
80NSSC25C0130
Completed: Period of performance ended Apr 28, 2026SBIR I ASYNCHRONOUS STAR-TRACKER FOR REAL-TIME HIGH-SPIN ATTITUDE CONTROL
National Aeronautics and Space Administration
FA864922P1133
Completed: Period of performance ended Mar 31, 2026PHASE-LOCKED LOOP INTERNET PROTOCOL BLOCK FOR INTEL 16 COMPLEMENTARY METAL OXIDE SEMICONDUCTOR MIXED SIGNAL CIRCUIT LIBRARY CAPABILITY FOR…
Department of Defense · Department of the Air Force
80NSSC25C0129
Completed: Period of performance ended Mar 27, 2026SBIR I RAD-HARD ELECTRONIC CONTROL AND POWER INTEGRATED CIRCUIT FOR STIRLING-BASED RADIOISOTOPE POWER SYSTEM
National Aeronautics and Space Administration
80NSSC21C0512
Completed: Period of performance ended Feb 28, 202620 GSPS ADC FOR SPECTROMETER BACKENDS IN MICROWAVE RADIOMETERS
National Aeronautics and Space Administration
80NSSC21C0516
Completed: Period of performance ended Feb 28, 2026RADIATION TOLERANT STANDARD CELL LIBRARY IN A 22NM FDSOI CMOS PROCESS
National Aeronautics and Space Administration
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
HQ085926FG182 under HQ085926DF967 SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | Department of Defense · Missile Defense Agency | 541715 · AC13 | $500 | Jan 21, 2026 – Dec 28, 2035 | Recompete 18+ mo: Potential end Dec 28, 2035 (109 months away) |
N0002426C3035 BASE | Department of Defense · Department of the Navy |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
No SBIR/STTR awards on record
Source: SBIR.gov award records · sync date not recorded
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov reports this entity as small under 1 of 3 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
| 541713 · AC32 |
| $1.8M |
| Apr 7, 2026 – Apr 7, 2029 |
Recompete 18+ mo: Potential end Apr 7, 2029 (28 months away) |
FA254125CB083 SBIR PHASE II: F2-19001 - SF241-0021 HIGH SPEED OPTICAL INTERCONNECTS FOR EFFICIENT INTRA-SATELLITE DATA TRANSFER IN THE SPACE ENVIRONMENT. | Department of Defense · Department of the Air Force | 541715 · AC32 | $1.8M | Aug 1, 2025 – Jul 31, 2027 | Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)AI brief for award FA254125CB083Bid team for the recompete of award FA254125CB083 |
80NSSC24CA064 FY24 SBIR PHASE II - RADIATION-HARDENED WIDE-TEMPERATURE MIXED-SIGNAL LIBRARY IN A 22NM FDSOI CMOS PROCESS | National Aeronautics and Space Administration | 541715 · AJ14 | $900K | Jul 27, 2024 – Jul 26, 2027 | Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)AI brief for award 80NSSC24CA064Bid team for the recompete of award 80NSSC24CA064 |
80NSSC24CA065 FY24 PHASE II - RADIATION HARDENED, PROGRAMMABLE BATTERY ANALOG FRONT-END ASIC | National Aeronautics and Space Administration | 541715 · AJ14 | $900K | Jul 27, 2024 – Jul 26, 2027 | Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)AI brief for award 80NSSC24CA065Bid team for the recompete of award 80NSSC24CA065 |
80NSSC24CA069 FY24 SBIR PHASE II - RADIATION-TOLERANT, HIGH-VOLTAGE BIDIRECTIONAL DC-DC CONVERTER PMIC | National Aeronautics and Space Administration | 541715 · AJ14 | $900K | Jul 27, 2024 – Jul 26, 2027 | Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)AI brief for award 80NSSC24CA069Bid team for the recompete of award 80NSSC24CA069 |
N0002426C3111 SBIR PHASE I TOPIC #N254-P02 | Department of Defense · Department of the Navy | 541713 · AC32 | $146.5K | Jun 22, 2026 – Jun 17, 2027 | Recompete 6–12 mo: Potential end Jun 17, 2027 (7 months away)AI brief for award N0002426C3111Bid team for the recompete of award N0002426C3111 |
N6833524C0221 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC12 | $999.9K | Apr 9, 2024 – Apr 15, 2027 | Recompete < 6 mo: Potential end Apr 15, 2027 (5 months away)AI brief for award N6833524C0221Bid team for the recompete of award N6833524C0221 |
80NSSC26C0198 SBIR PHASE I VIPER-S (VERSATILE IMAGER PLATFORM WITH ENHANCED RADIATION HARDNESS - STACKED) | National Aeronautics and Space Administration | 541715 · AJ11 | $224.9K | Sep 30, 2026 – Mar 30, 2027 | Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)AI brief for award 80NSSC26C0198Bid team for the recompete of award 80NSSC26C0198 |
FA864923P1211 FAST-RESPONSE EVENT-BASED IMAGE SENSOR AND CAMERA | Department of Defense · Department of the Air Force | 541715 · AC32 | $1.2M | Jul 25, 2023 – Feb 1, 2027 | Recompete < 6 mo: Potential end Feb 1, 2027 (2 months away)AI brief for award FA864923P1211Bid team for the recompete of award FA864923P1211 |
FA864923P0473 UNITED STATES-BASED HIGH-SPEED INPUT/OUTPUT FOR SPACE-BASED DEFENSE APPLICATIONS | Department of Defense · Department of the Air Force | 541715 · AC32 | $1.2M | Feb 22, 2023 – Dec 30, 2026 | Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)AI brief for award FA864923P0473Bid team for the recompete of award FA864923P0473 |
80NSSC25C0131 STTR PHASE I NOVEL IMAGING TECHNOLOGIES FOR OPTIMIZED LUNAR SURFACE NAVIGATION | National Aeronautics and Space Administration | 541715 · AJ14 | $156.4K | Sep 29, 2025 – Oct 28, 2026 | Completed: Period of performance ended Oct 28, 2026 |
FA864926P0370 PHOTON COUNTING ENABLED IMAGER FOR EXTRATERRESTRIAL OBJECT OBSERVATION (PHOENIX | Department of Defense · Department of the Air Force | 541715 · AC32 | $0 | Jul 24, 2026 – Oct 26, 2026 | Completed: Period of performance ended Oct 26, 2026 |
N0002425CS211 KICKOFF BRIEFING | Department of Defense · Department of the Navy | 541713 · AC32 | $239.9K | Jun 18, 2025 – Oct 9, 2026 | Completed: Period of performance ended Oct 9, 2026 |
N6426724C0080 873AUTHORITY | Department of Defense · Department of the Navy | 541715 · AC12 | $1.2M | Feb 13, 2024 – Oct 2, 2026 | Completed: Period of performance ended Oct 2, 2026 |
N6833523C0314 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC12 | $2M | Jul 10, 2023 – Oct 1, 2026 | Completed: Period of performance ended Oct 1, 2026 |
N6426725C7091 873AUTHORITY | Department of Defense · Department of the Navy | 541715 · AC11 | $239.8K | Aug 1, 2025 – Sep 22, 2026 | Completed: Period of performance ended Sep 22, 2026 |
FA237726PB001 MULTI-KILOVOLT, RAD HARD GALLIUM OXIDE DEVICES AND CONTROL IC | Department of Defense · Department of the Air Force | 541715 · AC11 | $139.9K | Mar 13, 2026 – Sep 13, 2026 | Completed: Period of performance ended Sep 13, 2026 |
80NSSC24CA062 FY24 SBIR PHASE II - SCALABLE DATA ACQUISITION SYSTEM FOR MKID DETECTORS | National Aeronautics and Space Administration | 541715 · AJ14 | $896.2K | Jul 27, 2024 – Jul 26, 2026 | Completed: Period of performance ended Jul 26, 2026 |
N6833526C0121 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC11 | $146.5K | Nov 3, 2025 – May 4, 2026 | Completed: Period of performance ended May 4, 2026 |
80NSSC25C0130 SBIR I ASYNCHRONOUS STAR-TRACKER FOR REAL-TIME HIGH-SPIN ATTITUDE CONTROL | National Aeronautics and Space Administration | 541715 · AJ14 | $156.4K | Sep 29, 2025 – Apr 28, 2026 | Completed: Period of performance ended Apr 28, 2026 |
FA864922P1133 PHASE-LOCKED LOOP INTERNET PROTOCOL BLOCK FOR INTEL 16 COMPLEMENTARY METAL OXIDE SEMICONDUCTOR MIXED SIGNAL CIRCUIT LIBRARY CAPABILITY FOR… | Department of Defense · Department of the Air Force | 541715 · AC32 | $749.8K | Sep 15, 2022 – Mar 31, 2026 | Completed: Period of performance ended Mar 31, 2026 |
80NSSC25C0129 SBIR I RAD-HARD ELECTRONIC CONTROL AND POWER INTEGRATED CIRCUIT FOR STIRLING-BASED RADIOISOTOPE POWER SYSTEM | National Aeronautics and Space Administration | 541715 · AJ14 | $156.3K | Sep 29, 2025 – Mar 27, 2026 | Completed: Period of performance ended Mar 27, 2026 |
80NSSC21C0512 20 GSPS ADC FOR SPECTROMETER BACKENDS IN MICROWAVE RADIOMETERS | National Aeronautics and Space Administration | 541715 · AJ14 | $760K | Jul 27, 2021 – Feb 28, 2026 | Completed: Period of performance ended Feb 28, 2026 |
80NSSC21C0516 RADIATION TOLERANT STANDARD CELL LIBRARY IN A 22NM FDSOI CMOS PROCESS | National Aeronautics and Space Administration | 541715 · AJ14 | $760K | Jul 27, 2021 – Feb 28, 2026 | Completed: Period of performance ended Feb 28, 2026 |
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 9, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 9, 2026