FSB - POND JOINT VENTURE
- OKLAHOMA CITY, OK 73118
- Other
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 11, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $0
- Awards on record
- 12
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
FSB - POND JOINT VENTURE has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About FSB - POND JOINT VENTURE
- Headquarters
- OKLAHOMA CITY, OK 73118
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIC15WHSFZZKU4
- CAGE7MAC5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $0
- Awards on record
- 12
- Top funding agencies
- n/a
Awards
W912BV25F0037
Recompete 18+ mo: Potential end Jan 30, 2030 (38 months away)MINIMUM GUARANTEE FOR THE INDEFINITE DELIVERY CONTRACT (IDC) FOR ARCHITECT ENGINEERING SERVICES FOR USE WITHIN SOUTHWESTERN DIVISION…
Department of Defense · Department of the Army
- Obligated
- $2.5K
- Period of performance
- Jan 31, 2025 – Jan 30, 2030
W9128F26FA086
Recompete 18+ mo: Potential end Dec 4, 2028 (24 months away)CPS AE SERVICES FOR THE B-21 ADAL OPS/AMU 1 AT ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA
Department of Defense · Department of the Army
- Obligated
- $1.1M
- Period of performance
- May 26, 2026 – Dec 4, 2028
N4008017C0007
Recompete < 6 mo: Potential end Jan 31, 2027 (2 months away)IGF::OT::IGF A-E DESIGN SERVICES FOR PRESIDENTIAL AIRCRAFT RECAPITALIZATION (PAR) COMPLEX AT JOINT BASE ANDREWS IN CAMP SPRINGS, MD
Department of Defense · Department of the Navy
- Obligated
- $21.7M
- Period of performance
- Nov 14, 2016 – Jan 31, 2027
W9128F21F0271
Recompete < 6 mo: Potential end Jan 21, 2027 (2 months away)B-21 FUELS SYSTEM MAINTENANCE DOCK
Department of Defense · Department of the Army
- Obligated
- $4.7M
- Period of performance
- Sep 16, 2021 – Jan 21, 2027
W9128F23F0106
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)B-21: RENOVATE DOCK 81 DESIGN
Department of Defense · Department of the Army
- Obligated
- $2.5M
- Period of performance
- Apr 21, 2023 – Dec 31, 2026
W9128F22F0262
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)B-21: WEAPONS RELEASE SYSTEM SHOP AE DESIGN
Department of Defense · Department of the Army
- Obligated
- $838.5K
- Period of performance
- Sep 27, 2022 – Dec 31, 2026
W912BV25FA059
Completed: Period of performance ended Sep 30, 2026STATEMENT OF WORK DAFB PHASE DOCK_032625
Department of Defense · Department of the Army
- Obligated
- $360.6K
- Period of performance
- Sep 19, 2025 – Sep 30, 2026
W9128F23F0068
Completed: Period of performance ended Sep 30, 2026B-21: 80 ROW EPS PCR
Department of Defense · Department of the Army
- Obligated
- $5.2M
- Period of performance
- Mar 17, 2023 – Sep 30, 2026
W912BV25F0130
Completed: Period of performance ended Jul 10, 2026FY30 B-21 FUEL CELL WASH RACK AT DYESS AIR FORCE BASE, PLANNING CHARRETTE REPORT
Department of Defense · Department of the Army
- Obligated
- $376.7K
- Period of performance
- Sep 29, 2025 – Jul 10, 2026
W9128F22F0121
Recompete 6–12 mo: Potential end Jun 9, 2027 (6 months away)B-21 ADAL OPS 1 PCR
Department of Defense · Department of the Army
- Obligated
- $3M
- Period of performance
- Jun 10, 2022 – Mar 31, 2026
W912DQ24F4038
Completed: Period of performance ended Aug 1, 2025B-21 RENOVATE FUEL CELL HANGAR, BUILDING 1
Department of Defense · Department of the Army
- Obligated
- $250.4K
- Period of performance
- Aug 29, 2024 – Aug 1, 2025
W912DQ24F4037
Completed: Period of performance ended May 30, 2025B-21 FLIGHT SIMULATOR PLANNING CHARRETTE
Department of Defense · Department of the Army
- Obligated
- $292.3K
- Period of performance
- Aug 30, 2024 – May 30, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W912BV25F0037 under W912BV25D0009 MINIMUM GUARANTEE FOR THE INDEFINITE DELIVERY CONTRACT (IDC) FOR ARCHITECT ENGINEERING SERVICES FOR USE WITHIN SOUTHWESTERN DIVISION… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2.5Kof $2.5K potential | Jan 31, 2025 – Jan 30, 2030Potential end Jan 30, 2030 | Recompete 18+ mo: Potential end Jan 30, 2030 (38 months away) |
W9128F26FA086 under W912DQ21D4016 CPS AE SERVICES FOR THE B-21 ADAL OPS/AMU 1 AT ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $1.1Mof $1.1M potential | May 26, 2026 – Dec 4, 2028Potential end Dec 4, 2028 | Recompete 18+ mo: Potential end Dec 4, 2028 (24 months away) |
N4008017C0007 IGF::OT::IGF A-E DESIGN SERVICES FOR PRESIDENTIAL AIRCRAFT RECAPITALIZATION (PAR) COMPLEX AT JOINT BASE ANDREWS IN CAMP SPRINGS, MD | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $21.7Mof $22.1M potential | Nov 14, 2016 – Jan 31, 2027Potential end Jan 31, 2027 | Recompete < 6 mo: Potential end Jan 31, 2027 (2 months away)AI brief for award N4008017C0007Bid team for the recompete of award N4008017C0007 |
W9128F21F0271 under W912DQ21D4016 B-21 FUELS SYSTEM MAINTENANCE DOCK | Department of Defense · Department of the Army | 541330 · C1BZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES | $4.7Mof $4.7M potential | Sep 16, 2021 – Jan 21, 2027Potential end Jan 21, 2027 | Recompete < 6 mo: Potential end Jan 21, 2027 (2 months away)AI brief for award W9128F21F0271Bid team for the recompete of award W9128F21F0271 |
W9128F23F0106 under W912DQ21D4016 B-21: RENOVATE DOCK 81 DESIGN | Department of Defense · Department of the Army | 541330 · C216ARCHITECT AND ENGINEERING- GENERAL: MARINE ENGINEERING | $2.5Mof $2.5M potential | Apr 21, 2023 – Dec 31, 2026Potential end Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award W9128F23F0106Bid team for the recompete of award W9128F23F0106 |
W9128F22F0262 under W912DQ21D4016 B-21: WEAPONS RELEASE SYSTEM SHOP AE DESIGN | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $838.5Kof $838.5K potential | Sep 27, 2022 – Dec 31, 2026Potential end Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award W9128F22F0262Bid team for the recompete of award W9128F22F0262 |
W912BV25FA059 under W912DQ21D4016 STATEMENT OF WORK DAFB PHASE DOCK_032625 | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $360.6Kof $360.6K potential | Sep 19, 2025 – Sep 30, 2026Potential end Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
W9128F23F0068 under W912DQ21D4016 B-21: 80 ROW EPS PCR | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $5.2Mof $5.2M potential | Mar 17, 2023 – Sep 30, 2026Potential end Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
W912BV25F0130 under W912DQ21D4016 FY30 B-21 FUEL CELL WASH RACK AT DYESS AIR FORCE BASE, PLANNING CHARRETTE REPORT | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $376.7Kof $376.7K potential | Sep 29, 2025 – Jul 10, 2026Potential end Jul 10, 2026 | Completed: Period of performance ended Jul 10, 2026 |
W9128F22F0121 under W912DQ21D4016 B-21 ADAL OPS 1 PCR | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $3Mof $3.6M potential | Jun 10, 2022 – Mar 31, 2026Potential end Jun 9, 2027 | Recompete 6–12 mo: Potential end Jun 9, 2027 (6 months away)AI brief for award W9128F22F0121Bid team for the recompete of award W9128F22F0121 |
W912DQ24F4038 under W912DQ21D4016 B-21 RENOVATE FUEL CELL HANGAR, BUILDING 1 | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $250.4Kof $250.4K potential | Aug 29, 2024 – Aug 1, 2025Potential end Aug 1, 2025 | Completed: Period of performance ended Aug 1, 2025 |
W912DQ24F4037 under W912DQ21D4016 B-21 FLIGHT SIMULATOR PLANNING CHARRETTE | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $292.3Kof $292.3K potential | Aug 30, 2024 – May 30, 2025Potential end May 30, 2025 | Completed: Period of performance ended May 30, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 11, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with FSB - POND JOINT VENTURE?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
