SES CONSTRUCTION AND FUEL SERVICES LLC
- Knoxville, TN 37932-3422
- bbch-llc.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Small Disadvantaged Business
- Alaska Native Corporation
Registration and small-business types: SAM.gov, synced Nov 11, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $211.4M
- Awards on record
- 28
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
SES CONSTRUCTION AND FUEL SERVICES LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About SES CONSTRUCTION AND FUEL SERVICES LLC
- Headquarters
- Knoxville, TN 37932-3422
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIC1CCESCMJUY1
- CAGE5XX45
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $211.4M
- Awards on record
- 28
- Top funding agencies
- Department of the Army · National Aeronautics and Space Administration · Department of the Air Force
25 most recent of 28 awards
W912QR21F0296
Recompete 18+ mo: Potential end Jul 25, 2031 (56 months away)NORTHEAST MATOC - MINIMUM GUARANTEE
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- Jul 27, 2021 – Jul 25, 2031
W9127S23F6037
Recompete 18+ mo: Potential end Feb 8, 2029 (26 months away)GUARANTEED MINIMUM
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- Feb 10, 2023 – Feb 8, 2029
W9123826CA005
Recompete 18+ mo: Potential end Nov 8, 2028 (23 months away)DESIGN AND CONSTRUCT A ONE-STORY EGRESS FACILITY (APPROX. 12,000 SF) FOR DEPOT-LEVEL REPAIRS FOR THE NEW T-7A ADVANCED PILOT TRAINER CAMPUS.
Department of Defense · Department of the Army
- Obligated
- $17.7M
- Period of performance
- Jun 15, 2026 – Nov 8, 2028
W9127S25FA055
Recompete 18+ mo: Potential end Aug 7, 2028 (20 months away)DESIGN/CONSTRUCTION SERVICES TO REPLACE EXISTING FIRE ALARM AND MASS NOTIFICATION SYSTEM AT BLDG. 1300, 99TH MEDICAL GROUP, NELLIS AFB, NV.
Department of Defense · Department of the Army
- Obligated
- $12.1M
- Period of performance
- Sep 15, 2025 – Aug 7, 2028
W9127S25FA066
Recompete 6–12 mo: Potential end Nov 4, 2027 (11 months away)REPLACE COOLING TOWERS AND STEAM BOILERS AT SCOTT AFB, IL, IN ACCORDANCE WITH PROJECT OBJECTIVES.
Department of Defense · Department of the Army
- Obligated
- $4.9M
- Period of performance
- Sep 19, 2025 – Nov 4, 2027
W9127S25FA082
Recompete 6–12 mo: Potential end Oct 8, 2027 (10 months away)REPLACE CHILLER 5 AND BOILERS 1, 2, AND 3 AT THE WOMACK CENTRAL ENERGY PLANT. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS,…
Department of Defense · Department of the Army
- Obligated
- $14.7M
- Period of performance
- Sep 24, 2025 – Oct 8, 2027
W9127S24F6021
Recompete 6–12 mo: Potential end Aug 9, 2027 (8 months away)BASE - DESIGN BUILD CONSTRUCTION FY24 DB EMERGENCY POWER UPGRADE NELLIS AFB, NV
Department of Defense · Department of the Army
- Obligated
- $10.6M
- Period of performance
- Oct 31, 2024 – Aug 9, 2027
W912DY23F0314
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)JBER ELEVATOR REPLACEMENT
Department of Defense · Department of the Army
- Obligated
- $8.7M
- Period of performance
- Sep 30, 2023 – Apr 30, 2027
W912DY25F2929
Recompete < 6 mo: Potential end Apr 9, 2027 (4 months away)CLIN 0002 (BASE) _ (RP2200063) REPLACE
Department of Defense · Department of the Army
- Obligated
- $18.7M
- Period of performance
- Oct 16, 2024 – Apr 9, 2027
FA446022F0028
Recompete < 6 mo: Potential end Dec 7, 2026 (under a month away)CONVERT MISSION PLANNING CELL B-380
Department of Defense · Department of the Air Force
- Obligated
- $7.3M
- Period of performance
- Jun 9, 2022 – Dec 7, 2026
80KSC021F0019
Completed: Period of performance ended Sep 26, 2026REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX…
National Aeronautics and Space Administration
- Obligated
- $13.3M
- Period of performance
- Jan 4, 2021 – Sep 26, 2026
W9127S25FA062
Completed: Period of performance ended Sep 24, 2026THE INTENT OF THIS PROJECT IS TO REPAIR/REPLACE ROOF ON BUILDING 1380 AND ROOF REPLACEMENT AND BUILDING ENVELOPE REPAIR ON BUILDING 1371…
Department of Defense · Department of the Army
- Obligated
- $1.8M
- Period of performance
- Oct 20, 2025 – Sep 24, 2026
W912DY24F0562
Completed: Period of performance ended Apr 18, 20260003 (OPTION)-REPLACE AHU E-15 AND E-16
Department of Defense · Department of the Army
- Obligated
- $19.1M
- Period of performance
- Sep 30, 2024 – Apr 18, 2026
W9127S23F6054
Completed: Period of performance ended Apr 17, 2026DESIGN BUILD MULTIPLE AWARD TASK ORDER CONTRACT FOR NAVBASE VENTURA COUNTY PORT HUENEME MEDICAL CENTER CLINIC TO REPAIR BUILDING EXTERIOR.
Department of Defense · Department of the Army
- Obligated
- $15.6M
- Period of performance
- Sep 19, 2023 – Apr 17, 2026
W912DQ25FA058
Completed: Period of performance ended Feb 20, 2026W58XUW52729692 NGA PARKING LOT EXTENSION IN ST. LOUIS, MO
Department of Defense · Department of the Army
- Obligated
- $423.3K
- Period of performance
- Sep 30, 2025 – Feb 20, 2026
W912DY23F0474
Completed: Period of performance ended Feb 5, 2026BASE INSTALLATION OF SYSTEMS
Department of Defense · Department of the Army
- Obligated
- $1.9M
- Period of performance
- Sep 30, 2023 – Feb 5, 2026
W912DY23F0473
Completed: Period of performance ended Dec 1, 2025REPAIR/RENEWAL- CONSTRUCTION
Department of Defense · Department of the Army
- Obligated
- $2.2M
- Period of performance
- Sep 30, 2023 – Dec 1, 2025
W912QR23F0438
Completed: Period of performance ended Oct 4, 2025DESIGN-BID-BUILD CONSTRUCTION OF A NEW SINGLE STORY ADMINISTRATION OFFICE FOR THE AIR FORCE RESERVE CENTER INTELLIGENCE GROUP AND THREE…
Department of Defense · Department of the Army
- Obligated
- $14.2M
- Period of performance
- Oct 25, 2023 – Oct 4, 2025
W9127824F0387
Completed: Period of performance ended Sep 9, 2025REPLACE CHILLER FOR MCCONNELL AFB, KS
Department of Defense · Department of the Army
- Obligated
- $2.7M
- Period of performance
- Sep 27, 2024 – Sep 9, 2025
W912DY23F0542
Completed: Period of performance ended Aug 20, 2025TRAVIS AFB - NTO PA SYSTEM
Department of Defense · Department of the Army
- Obligated
- $6.7M
- Period of performance
- Sep 30, 2023 – Aug 20, 2025
W912DY23F0388
Completed: Period of performance ended Aug 18, 2025JBER PA SYSTEM REPLACEMENT
Department of Defense · Department of the Army
- Obligated
- $4.7M
- Period of performance
- Sep 30, 2023 – Aug 18, 2025
W9127S23F6043
Completed: Period of performance ended Apr 22, 2025CONSTRUCTION PROJECT AT FT BRAGG RECORDS ROOM CONVERSION - TASK ORDER
Department of Defense · Department of the Army
- Obligated
- $5M
- Period of performance
- Oct 31, 2023 – Apr 22, 2025
W9127S22F6028
Completed: Period of performance ended Mar 15, 2025ROOF
Department of Defense · Department of the Army
- Obligated
- $3.3M
- Period of performance
- Oct 31, 2022 – Mar 15, 2025
W9127820C0038
Completed: Period of performance ended Jan 19, 2025AWARD CONSTRUCTION CONTRACT - AMU HANGER B290, TYNDALL AFB, FL
Department of Defense · Department of the Army
- Obligated
- $23.4M
- Period of performance
- Sep 30, 2020 – Jan 19, 2025
80JSC023F0122
Completed: Period of performance ended Jan 15, 2025DEMOLITION OF BUILDING 37 & ANCILLARY BUILDINGS/STRUCTURES
National Aeronautics and Space Administration
- Obligated
- $2.4M
- Period of performance
- Dec 14, 2023 – Jan 15, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W912QR21F0296 under W912QR21D0060 NORTHEAST MATOC - MINIMUM GUARANTEE | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $0 | Jul 27, 2021 – Jul 25, 2031 | Recompete 18+ mo: Potential end Jul 25, 2031 (56 months away) |
W9127S23F6037 under W9127S23D6028 GUARANTEED MINIMUM | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $0 | Feb 10, 2023 – Feb 8, 2029 | Recompete 18+ mo: Potential end Feb 8, 2029 (26 months away) |
W9123826CA005 DESIGN AND CONSTRUCT A ONE-STORY EGRESS FACILITY (APPROX. 12,000 SF) FOR DEPOT-LEVEL REPAIRS FOR THE NEW T-7A ADVANCED PILOT TRAINER CAMPUS. | Department of Defense · Department of the Army | 236210 · Y1EBCONSTRUCTION OF MAINTENANCE BUILDINGS | $17.7M | Jun 15, 2026 – Nov 8, 2028 | Recompete 18+ mo: Potential end Nov 8, 2028 (23 months away) |
W9127S25FA055 under W9127S20D6010 DESIGN/CONSTRUCTION SERVICES TO REPLACE EXISTING FIRE ALARM AND MASS NOTIFICATION SYSTEM AT BLDG. 1300, 99TH MEDICAL GROUP, NELLIS AFB, NV. | Department of Defense · Department of the Army | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $12.1M | Sep 15, 2025 – Aug 7, 2028 | Recompete 18+ mo: Potential end Aug 7, 2028 (20 months away) |
W9127S25FA066 under W9127S20D6010 REPLACE COOLING TOWERS AND STEAM BOILERS AT SCOTT AFB, IL, IN ACCORDANCE WITH PROJECT OBJECTIVES. | Department of Defense · Department of the Army | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $4.9M | Sep 19, 2025 – Nov 4, 2027 | Recompete 6–12 mo: Potential end Nov 4, 2027 (11 months away)AI brief for award W9127S25FA066Bid team for the recompete of award W9127S25FA066 |
W9127S25FA082 under W9127S20D6010 REPLACE CHILLER 5 AND BOILERS 1, 2, AND 3 AT THE WOMACK CENTRAL ENERGY PLANT. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS,… | Department of Defense · Department of the Army | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $14.7M | Sep 24, 2025 – Oct 8, 2027 | Recompete 6–12 mo: Potential end Oct 8, 2027 (10 months away)AI brief for award W9127S25FA082Bid team for the recompete of award W9127S25FA082 |
W9127S24F6021 under W9127S20D6010 BASE - DESIGN BUILD CONSTRUCTION FY24 DB EMERGENCY POWER UPGRADE NELLIS AFB, NV | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $10.6M | Oct 31, 2024 – Aug 9, 2027 | Recompete 6–12 mo: Potential end Aug 9, 2027 (8 months away)AI brief for award W9127S24F6021Bid team for the recompete of award W9127S24F6021 |
W912DY23F0314 under W9127S23D6028 JBER ELEVATOR REPLACEMENT | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $8.7M | Sep 30, 2023 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award W912DY23F0314Bid team for the recompete of award W912DY23F0314 |
W912DY25F2929 under W9127S20D6010 CLIN 0002 (BASE) _ (RP2200063) REPLACE | Department of Defense · Department of the Army | 236220 · Z1JZMAINTENANCE OF MISCELLANEOUS BUILDINGS | $18.7M | Oct 16, 2024 – Apr 9, 2027 | Recompete < 6 mo: Potential end Apr 9, 2027 (4 months away)AI brief for award W912DY25F2929Bid team for the recompete of award W912DY25F2929 |
FA446022F0028 under FA446022D0007 CONVERT MISSION PLANNING CELL B-380 | Department of Defense · Department of the Air Force | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $7.3M | Jun 9, 2022 – Dec 7, 2026 | Recompete < 6 mo: Potential end Dec 7, 2026 (under a month away)AI brief for award FA446022F0028Bid team for the recompete of award FA446022F0028 |
80KSC021F0019 under 80SSC018D0020 REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX… | National Aeronautics and Space Administration | 236210 · Z2EZREPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS | $13.3M | Jan 4, 2021 – Sep 26, 2026 | Completed: Period of performance ended Sep 26, 2026 |
W9127S25FA062 under W9127S20D6010 THE INTENT OF THIS PROJECT IS TO REPAIR/REPLACE ROOF ON BUILDING 1380 AND ROOF REPLACEMENT AND BUILDING ENVELOPE REPAIR ON BUILDING 1371… | Department of Defense · Department of the Army | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $1.8M | Oct 20, 2025 – Sep 24, 2026 | Completed: Period of performance ended Sep 24, 2026 |
W912DY24F0562 under W9127S23D6028 0003 (OPTION)-REPLACE AHU E-15 AND E-16 | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $19.1M | Sep 30, 2024 – Apr 18, 2026 | Completed: Period of performance ended Apr 18, 2026 |
W9127S23F6054 under W9127S20D6010 DESIGN BUILD MULTIPLE AWARD TASK ORDER CONTRACT FOR NAVBASE VENTURA COUNTY PORT HUENEME MEDICAL CENTER CLINIC TO REPAIR BUILDING EXTERIOR. | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $15.6M | Sep 19, 2023 – Apr 17, 2026 | Completed: Period of performance ended Apr 17, 2026 |
W912DQ25FA058 under W912DQ22D4005 W58XUW52729692 NGA PARKING LOT EXTENSION IN ST. LOUIS, MO | Department of Defense · Department of the Army | 236220 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $423.3K | Sep 30, 2025 – Feb 20, 2026 | Completed: Period of performance ended Feb 20, 2026 |
W912DY23F0474 under W9127S23D6028 BASE INSTALLATION OF SYSTEMS | Department of Defense · Department of the Army | 236220 · Z2DBREPAIR OR ALTERATION OF LABORATORIES AND CLINICS | $1.9M | Sep 30, 2023 – Feb 5, 2026 | Completed: Period of performance ended Feb 5, 2026 |
W912DY23F0473 under W9127S23D6028 REPAIR/RENEWAL- CONSTRUCTION | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $2.2M | Sep 30, 2023 – Dec 1, 2025 | Completed: Period of performance ended Dec 1, 2025 |
W912QR23F0438 under W912QR21D0060 DESIGN-BID-BUILD CONSTRUCTION OF A NEW SINGLE STORY ADMINISTRATION OFFICE FOR THE AIR FORCE RESERVE CENTER INTELLIGENCE GROUP AND THREE… | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $14.2M | Oct 25, 2023 – Oct 4, 2025 | Completed: Period of performance ended Oct 4, 2025 |
W9127824F0387 under W9127S20D6010 REPLACE CHILLER FOR MCCONNELL AFB, KS | Department of Defense · Department of the Army | 236220 · Z1DAMAINTENANCE OF HOSPITALS AND INFIRMARIES | $2.7M | Sep 27, 2024 – Sep 9, 2025 | Completed: Period of performance ended Sep 9, 2025 |
W912DY23F0542 under W9127S23D6028 TRAVIS AFB - NTO PA SYSTEM | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $6.7M | Sep 30, 2023 – Aug 20, 2025 | Completed: Period of performance ended Aug 20, 2025 |
W912DY23F0388 under W9127S23D6028 JBER PA SYSTEM REPLACEMENT | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $4.7M | Sep 30, 2023 – Aug 18, 2025 | Completed: Period of performance ended Aug 18, 2025 |
W9127S23F6043 under W9127S23D6028 CONSTRUCTION PROJECT AT FT BRAGG RECORDS ROOM CONVERSION - TASK ORDER | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $5M | Oct 31, 2023 – Apr 22, 2025 | Completed: Period of performance ended Apr 22, 2025 |
W9127S22F6028 under W9127S20D6010 ROOF | Department of Defense · Department of the Army | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $3.3M | Oct 31, 2022 – Mar 15, 2025 | Completed: Period of performance ended Mar 15, 2025 |
W9127820C0038 AWARD CONSTRUCTION CONTRACT - AMU HANGER B290, TYNDALL AFB, FL | Department of Defense · Department of the Army | 236220 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $23.4M | Sep 30, 2020 – Jan 19, 2025 | Completed: Period of performance ended Jan 19, 2025 |
80JSC023F0122 under 80SSC018D0020 DEMOLITION OF BUILDING 37 & ANCILLARY BUILDINGS/STRUCTURES | National Aeronautics and Space Administration | 236210 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $2.4M | Dec 14, 2023 – Jan 15, 2025 | Completed: Period of performance ended Jan 15, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237120Oil and Gas Pipeline and Related Structures ConstructionPrimarySmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 238220Plumbing, Heating, and Air-Conditioning Contractors
- 541330Engineering ServicesSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering ConstructionSmall business under this code’s size standard
- 541690Other Scientific and Technical Consulting Services
- 541620Environmental Consulting Services
- 486910Title not in the curated listSmall business under this code’s size standard
- 238210Electrical Contractors and Other Wiring Installation Contractors
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 562998All Other Miscellaneous Waste Management Services
- 238120Structural Steel and Precast Concrete Contractors
- 541490Other Specialized Design Services
- 237310Highway, Street, and Bridge ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 562910Remediation ServicesSmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 238110Poured Concrete Foundation and Structure Contractors
- 561210Facilities Support ServicesSmall business under this code’s size standard
- 238910Site Preparation Contractors
SAM.gov reports this entity as small under 11 of 20 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 11, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with SES CONSTRUCTION AND FUEL SERVICES LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
