Skip to main content
TeamingIndex
Unclaimed profileSeeded from SAM.gov and USAspending public records

OZARK INTEGRATED CIRCUITS INC

UEIC3JNF19C7DK8CAGE6BQS1NAICS541715
  • SAM active
  • No verified credentials yet
  • CMMCNot on file
  • SPRSNone
  • FCLVisible to paid members
  • Small Business

Registration and small-business types: SAM.gov, synced Nov 11, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works

36-mo obligations
$11.9M
Awards on record
5
Contract vehicles
0
Verified credentials
0

Compliance posture: unverified (SAM.gov baseline only)

OZARK INTEGRATED CIRCUITS INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0

Claim this profile

About OZARK INTEGRATED CIRCUITS INC

OZARK INTEGRATED CIRCUITS INC is a SAM.gov-registered entity based in FAYETTEVILLE, AR 72701-7174. UEI C3JNF19C7DK8; CAGE 6BQS1; primary NAICS 541715. Compliance posture not provided. Active SAM registration.
Headquarters
FAYETTEVILLE, AR 72701-7174

Identifiers

UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.

  • UEIC3JNF19C7DK8
  • CAGE6BQS1

Capabilities & differentiators

No capability narrative yet

The company has not published a capability narrative. Its SAM.gov registration, NAICS codes and award history are below.

Compliance posture

Every credential shows who vouches for it: verified by TeamingIndex, or self-attested by the contractor.

No compliance posture published yet

Compliance facts appear once the company claims this profile and publishes them.

Facility clearance

Facility clearance: visible to paid members

Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans

Prime awards from USAspending.gov (FPDS), synced nightly. Recompete windows use the potential end date (base plus all options).
36-month obligations
$11.9M
Awards on record
5
Top funding agencies
Defense Advanced Research Projects Agency · Department of the Air Force · Missile Defense Agency

Awards

  • FA239424CB022

    Recompete 12–18 mo: Potential end Apr 3, 2028 (16 months away)

    SYSTEM INTEGRATION OF NON-VOLATILE FERROELECTRIC MEMORY FOR HIGH TEMPERATURE APPLICATIONS

    Department of Defense · Department of the Air Force

    Obligated
    $3.4M
    Period of performance
    Apr 3, 2024 – Apr 3, 2028
  • HQ086024C7111

    Completed: Period of performance ended Oct 5, 2026

    SBIR/STTR PHASE II R&D

    Department of Defense · Missile Defense Agency

    Obligated
    $1.5M
    Period of performance
    Oct 3, 2023 – Oct 5, 2026
  • HR001124C0373

    Completed: Period of performance ended Dec 29, 2025

    THE HIGH OPERATIONAL TEMPERATURE SENSORS (HOTS)PROGRAM WILL DEVELOP A TECHNOLOGY FOR HIGH-BANDWIDTH, HIGH-DYNAMIC-RANGE SENSING AT HIGH…

    Department of Defense · Defense Advanced Research Projects Agency

    Obligated
    $5.6M
    Period of performance
    Mar 1, 2024 – Dec 29, 2025
  • W912CG22C0024

    Completed: Period of performance ended Apr 30, 2025

    NEW DARPA SBIR II TITLED "HIGH FIDELITY ANALOG INTEGRATION TECHNIQUES FOR HIGH TEMPERATURE APPLICATIONS"

    Department of Defense · Department of the Army

    Obligated
    $1.5M
    Period of performance
    Jun 2, 2022 – Apr 30, 2025
  • HQ086022C7830

    Completed: Period of performance ended Mar 24, 2023

    SBIR/STTR PHASE I RESEARCH & DEVELOPMENT PACKAGING METHODS FOR RELIABLE AND SCALABLE HIGH TEMPERATURE ELECTRONICS

    Department of Defense · Defense Contract Management Agency

    Obligated
    $154.9K
    Period of performance
    Jul 22, 2022 – Mar 24, 2023

No contract vehicles on file

This company has not listed GWAC, IDIQ, GSA Schedule or OTA consortium holdings.
Who OZARK INTEGRATED CIRCUITS INC has actually worked with, from sub-awards that prime contractors report to the government. Use it to see which primes already trust this company.

Primes it has worked under

No reported sub-awards as a subcontractor.

Subcontractors it has used

  • GENERAL ELECTRIC COMPANY

    UEI M2FYKG7HP723

    $1M

    Subcontracted by this company · 2 sub-awards · latest Sep 24, 2024

    • Defense Advanced Research Projects Agency
    • “PROVIDE INCREMENTAL FUNDS FOR THE PHASE I STATEMENT OF WORK.”
    • “DEVELOPMENT OF SIC JFETS AND GAN HEMTS IN TWO PHASES”
  • $520.5K

    Subcontracted by this company · 1 sub-award · latest Apr 9, 2024

    • Defense Advanced Research Projects Agency
    • “COMPLETION OF WORK RELATED TO THE DEVELOPMENT OF A HIGH-TEMPERATURE, MHZ-BANDWIDTH DYNAMIC PRESSURE SENSOR.”

Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.

Small Business Innovation Research and Technology Transfer awards: early-stage federal R&D money this company has won.

SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects

Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.

Awards on record
37 awards
Total awarded
$19,866,110
By phase
  • SBIR Phase I: 22
  • SBIR Phase II: 13
  • STTR Phase I: 1
  • STTR Phase II: 1
By agency
  • Department of Energy: 13
  • National Aeronautics and Space Administration: 12
  • Department of Defense: 11
  • National Science Foundation: 1
Active projects
0 projects
Projects whose contract end date is today or later.
Phase II ending within 12 months
0 projects
Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
By year
  • 2024: 3
  • 2023: 4
  • 2022: 5
  • 2021: 2
  • 2020: 6
  • 2019: 3
  • 2018: 4
  • 2017: 3
  • 2016: 3
  • 2015: 2
  • 2013: 1
  • 2012: 1

Awards (most recent first)

  • High-Temperature Flow Rate Instrument for Geothermal Reservoir Monitoring

    SBIR Phase II · Department of Energy · 2024 · $1,149,447

    Sep 10, 2024 – Sep 9, 2026

    Solicitation DE-FOA-0003279 (2024) · Topic C56-21a

  • System Integration of Non-Volatile Ferroelectric Memory for High Temperature Applications

    SBIR Phase II · Department of Defense (Air Force) · 2024 · $1,759,884

    Apr 3, 2024 – Jul 3, 2026

    • Direct to Phase II

    Solicitation 23.3 (2024) · Topic AF233-D012

  • Packaging Methods for Reliable and Scalable High Temperature Electronics

    SBIR Phase II · Department of Defense (Missile Defense Agency) · 2024 · $1,494,380

    Oct 6, 2023 – Oct 5, 2025

    Solicitation 22.1 (2022) · Topic MDA22-008

  • High-Temperature Electronics for Low-Cost, In-Line Impurity Monitoring of Salt-Cooled Reactors

    SBIR Phase II · Department of Energy · 2023 · $1,149,946

    Aug 21, 2023 – Aug 20, 2025

    Solicitation year 2023 · Topic C54-36f

  • A 4H-SiC Thin-Film Process for the Manufacture of UV-Detecting VISIR-Blind Integrated Circuits

    SBIR Phase I · Department of Defense (Navy) · 2023 · $139,982

    Jul 17, 2023 – Jan 16, 2024

    Solicitation 23.1 (2023) · Topic N231-070

  • High-Temperature Flow Rate Instrument for Geothermal Reservoir Monitoring

    SBIR Phase I · Department of Energy · 2023 · $206,483

    Jul 10, 2023 – Jul 9, 2024

    Solicitation DE-FOA-0002903 (2023) · Topic C56-21a

  • High-Temperature Electronics for Real-Time, In-Line Monitoring of Molten Salt Reduction and Oxidation (RedOx)

    SBIR Phase II · Department of Energy · 2023 · $1,149,939

    Apr 3, 2023 – Apr 2, 2025

    Solicitation year 2023 · Topic C53-20b

  • Packaging Methods for Reliable and Scalable High Temperature Electronics

    SBIR Phase I · Department of Defense (Missile Defense Agency) · 2022 · $154,949

    Jul 25, 2022 – Jan 24, 2023

    Solicitation 22.1 (2022) · Topic MDA22-008

  • High Temperature Additively Manufactured ROM for Venus Surface Operation

    SBIR Phase I · National Aeronautics and Space Administration · 2022 · $156,442

    Jul 6, 2022 – Jan 25, 2023

    Solicitation SBIR_22_P1 (2022) · Topic S13

  • High-Temperature Electronics for Low-Cost, In-Line Impurity Monitoring for Salt-Cooled Reactors

    SBIR Phase I · Department of Energy · 2022 · $206,433

    Jun 27, 2022 – Jun 26, 2023

    Solicitation year 2022 · Topic C54-36f

  • High Fidelity Analog Integration Techniques for High Temperature Applications

    SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2022 · $1,492,065

    Jun 2, 2022 – Jul 1, 2024

    Solicitation 20.1 (2020) · Topic NASA S4.04

  • High-Temperature Electronics for Real-Time, In-Line Monitoring of Molten Salt Reduction and Oxidation (RedOx)

    SBIR Phase I · Department of Energy · 2022 · $199,935

    Feb 14, 2022 – Feb 13, 2023

    Solicitation year 2021 · Topic C53-20b

  • High-Temperature Instrumentation for the Advancement of Hypersonic Engine Development

    SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2021 · $1,740,422

    May 7, 2021 – Aug 31, 2024

    Solicitation 19.101 (2019) · Topic HR001119S0035-01

  • Supersonic Capable Signal Conditioning Electronics for Turbine Engines

    SBIR Phase I · Department of Defense (Air Force) · 2021 · $49,943

    Feb 19, 2021 – May 20, 2021

    Solicitation X20.3 (2020) · Topic AF203-CSO1

  • High Fidelity Analog Integration Techniques for Venus Surface Data Acquisition

    SBIR Phase I · National Aeronautics and Space Administration · 2020 · $124,998

    Aug 30, 2020 – Mar 1, 2021

    Solicitation SBIR_20_P1 (2020) · Topic S4

  • Ruggedized Communication Technology for Enabling High-Temperature Directional Drilling (Phase 2)

    SBIR Phase II · Department of Energy · 2020 · $1,149,992

    Aug 24, 2020 – Aug 23, 2022

    Solicitation DE-FOA-0002156 (2020) · Topic 11a

  • High Temperature By Design (HTBD) Techniques for a Reliable, High Performance Microcontroller

    SBIR Phase II · Department of Defense (Air Force) · 2020 · $749,903

    Jul 15, 2020 – Jul 15, 2022

    Solicitation 18.2 (2018) · Topic AF182-061

  • Extreme Environment System Integration Techniques for Venus In-Situ Processing

    SBIR Phase II · National Aeronautics and Space Administration · 2020 · $759,939

    Jul 10, 2020 – Jul 9, 2022

    Solicitation SBIR_19_P2 (2019) · Topic S4

  • High-Temperature Electronics for Real-Time, In-Line Impurity Monitoring for FLIBE-Cooled Reactors

    SBIR Phase I · Department of Energy · 2020 · $206,494

    Jun 29, 2020 – Jun 28, 2021

    Solicitation DEFOA0002146 (2020) · Topic 37j

  • High-Temperature Instrumentation for the Advancement of Hypersonic Engine Development

    SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2020 · $224,525

    Dec 12, 2019 – Sep 2, 2020

    Solicitation DARPA SBIR HR001119S0035-01 (2019) · Topic HR001119S0035-01

  • Extreme Environment System Integration Techniques for Venus In-Situ Processing

    SBIR Phase I · National Aeronautics and Space Administration · 2019 · $124,844

    Aug 19, 2019 – Feb 18, 2020

    Solicitation SBIR_19_P1 (2019) · Topic S4

  • Integrated Silicon Carbide Electronics for Venus Surface Actuation

    SBIR Phase II · National Aeronautics and Space Administration · 2019 · $754,517

    Jul 29, 2019 – Jul 28, 2021

    Solicitation SBIR_18_P2 (2018) · Topic S4

  • Ruggedized Communication Technology for Enabling High-Temperature Directional Drilling

    SBIR Phase I · Department of Energy · 2019 · $204,902

    Jul 1, 2019 – Jun 30, 2020

    Solicitation DE-FOA-0001941 (2019) · Topic 11a

  • Rugged, Long-Life Flow Monitoring for Enhanced Geothermal Systems

    SBIR Phase II · Department of Energy · 2018 · $1,009,584

    Aug 27, 2018 – Aug 26, 2020

    Solicitation DE-FOA-0001795 (2018) · Topic 12a

  • Integrated Silicon Carbide Electronics for Venus Surface Actuation

    SBIR Phase I · National Aeronautics and Space Administration · 2018 · $123,839

    Jul 27, 2018 – Feb 15, 2019

    Solicitation SBIR_18_P1 (2018) · Topic S4

Showing the 25 most recent of 37 awards.

Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026

Cloud services this company lists on the FedRAMP Marketplace, the government's record of cloud authorizations.

No FedRAMP Marketplace listing

No FedRAMP Marketplace listing is linked to this company. Cloud providers appear here automatically once FedRAMP lists their offering.

Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded

Checks a prime runs before teaming: SAM.gov exclusions (debarment and suspension) and the government's Consolidated Screening List for export and sanctions lists.

SAM.gov exclusions

Not yet checked against SAM.gov exclusions.

Search exclusions on SAM.gov (opens in a new tab)

Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.

Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded

Consolidated Screening List

No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).

The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.

Hourly ceiling rates this company was awarded on GSA contracts, compared with the market for similar labor categories. Ceiling rates are the most an agency can be charged, not prices paid.

No GSA CALC+ rates on record

Companies with a GSA Multiple Award Schedule contract appear here after CALC+ publishes their awarded labor rates.

NAICS, PSC & socio-economic status

Industry codes and small-business programs reported in SAM.gov.

NAICS codes

  • 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
  • 334413Semiconductor and Related Device ManufacturingSmall business under this code’s size standard
  • 541330Engineering Services
  • 541380Testing Laboratories and ServicesSmall business under this code’s size standard

SAM.gov reports this entity as small under 2 of 4 NAICS codes. Size is determined per code (SBA size standards).

Product & service codes (PSC)

  • 5961SEMICONDUCTOR DEVICES AND ASSOCIATED HARDWARE
  • 5962MICROCIRCUITS, ELECTRONIC
  • 5963ELECTRONIC MODULES
  • 5998ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE
  • AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH
  • AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
  • AC13NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; EXPERIMENTAL DEVELOPMENT
  • AC31NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; BASIC RESEARCH
  • AC32NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; APPLIED RESEARCH
  • AC33NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; EXPERIMENTAL DEVELOPMENT
  • AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH
  • AJ12GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; APPLIED RESEARCH
  • AJ13GENERAL SCIENCE & TECHNOLOGY R&D SVCS; GENERAL SCIENCE & TECHNOLOGY; EXPERIMENTAL DEVELOPMENT
  • AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
  • AR12SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; APPLIED RESEARCH
  • AR13SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT

PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.

This company has not published teaming preferences.

SAM.gov teaming eligibility: Eligible to be proposed as a team member: active SAM.gov registration and no exclusion.

Business development contact

No BD contact published

Contact details appear once the company claims this profile.
Immediate parent and highest-level owner as reported in SAM.gov.

No parent entity reported in SAM.gov.

SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.

Data sources & provenance

Who stands behind each fact on this page, and how to correct it.
  • SAM.gov

    Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 11, 2026.

  • USAspending.gov

    Prime award history and obligations (FPDS), synced nightly.

  • The contractor

    Nothing yet: this profile has not been claimed by the company.

  • TeamingIndex verification

    Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.

Corrections

Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)

Machine-readable: capability.md schema.org JSON-LD embedded in this page.

Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.

Teaming

Ready to team with OZARK INTEGRATED CIRCUITS INC?

Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.