URBAN ELECTRIC, INC
Doing business as URBAN ENGINEERING & CONSTRUCTION
- ALTAMONTE SPRINGS, FL 32701
- urbanelectric.net (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Small Disadvantaged Business
Registration and small-business types: SAM.gov, synced Nov 11, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $30.7M
- Awards on record
- 103
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
URBAN ELECTRIC, INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About URBAN ELECTRIC, INC
- Headquarters
- ALTAMONTE SPRINGS, FL 32701
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIC4DSLZNYMPV3
- CAGE3G7L5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $30.7M
- Awards on record
- 103
- Top funding agencies
- Federal Aviation Administration
25 most recent of 103 awards
6973GH26F01287
Recompete 6–12 mo: Potential end Aug 17, 2027 (9 months away)CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) DESIGN FOR MINNEAPOLIS MN ATCT (MSP)JCN: 1800006
Department of Transportation · Federal Aviation Administration
- Obligated
- $291.7K
- Period of performance
- Aug 18, 2026 – Aug 17, 2027
697DCK26C00144
Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM
Department of Transportation · Federal Aviation Administration
- Obligated
- $5.1M
- Period of performance
- Jun 25, 2026 – Jul 26, 2027
6973GH26F01098
Recompete 6–12 mo: Potential end Jun 24, 2027 (7 months away)IIJA FUNDS. 2025 PROPANE BASELINE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS AT FRESNO, CA (FATA) ATCT JCN:1501845
Department of Transportation · Federal Aviation Administration
- Obligated
- $125.1K
- Period of performance
- Jul 20, 2026 – Jun 24, 2027
697DCK26C00154
Recompete 6–12 mo: Potential end Jun 16, 2027 (7 months away)INTERNET PROTOCOL VOICE COMMUNICATION SYSTEMS
Department of Transportation · Federal Aviation Administration
- Obligated
- $1.7M
- Period of performance
- Jun 17, 2026 – Jun 16, 2027
6973GH26F00723
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)(IIJA) FUNDED DESIGN AND MODERNIZATION INSTALL PROJECT(S) MULTIPLE SITES: (MXF)ASR, MAXWELL AFB, AL, JCN:23000763 (ATL)ASR, ATLANTA, GA,…
Department of Transportation · Federal Aviation Administration
- Obligated
- $463.1K
- Period of performance
- Apr 29, 2026 – Apr 30, 2027
6973GH24F01234
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT NEWARK, NJ (EZA) ALS, JCN: 1503146
Department of Transportation · Federal Aviation Administration
- Obligated
- $359.6K
- Period of performance
- Aug 5, 2024 – Dec 31, 2026
6973GH24F00934
Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF DIESEL FST AT MONROE, LA (MLUA) ATCT, JCN: 18026575
Department of Transportation · Federal Aviation Administration
- Obligated
- $240.9K
- Period of performance
- May 23, 2024 – Dec 30, 2026
6973GH24F00941
Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT WILMINGTON, NC (ILMA) ASR, JCN: 24012304
Department of Transportation · Federal Aviation Administration
- Obligated
- $259.9K
- Period of performance
- May 23, 2024 – Dec 30, 2026
6973GH23F01656
Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT MEMPHIS, TN (MEMA) ASR JCN: 23000546
Department of Transportation · Federal Aviation Administration
- Obligated
- $389.3K
- Period of performance
- Aug 10, 2023 – Dec 30, 2026
6973GH24F01387
Recompete < 6 mo: Potential end Nov 30, 2026 (under a month away)ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT LINCOLNTON, GA (QNK) ARSR, JCN: 22007812
Department of Transportation · Federal Aviation Administration
- Obligated
- $338.9K
- Period of performance
- Aug 29, 2024 – Nov 30, 2026
6973GH25F00288
Recompete < 6 mo: Potential end Nov 20, 2026 (under a month away)ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT DOUGLASTON, NY (QDG) RCLR, JCN: 1503559
Department of Transportation · Federal Aviation Administration
- Obligated
- $302.5K
- Period of performance
- Dec 19, 2024 – Nov 20, 2026
6973GH26F00378
Completed: Period of performance ended Oct 31, 2026SITE SURVEY, REPORT AND DESIGN FUNDING FOR POWER SYSTEM REPLACEMENT PROJECTS AT WEST MESA, NM (QSA) ARSR JCN: 19007421
Department of Transportation · Federal Aviation Administration
- Obligated
- $33.3K
- Period of performance
- Feb 9, 2026 – Oct 31, 2026
6973GH24F01457
Completed: Period of performance ended Oct 31, 2026ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT FORT YUKON, AK (FYU) BLDG, JCN: 1501870
Department of Transportation · Federal Aviation Administration
- Obligated
- $456.3K
- Period of performance
- Sep 6, 2024 – Oct 31, 2026
6973GH24F01393
Completed: Period of performance ended Oct 31, 2026ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT ROMULUS, MI (DTWD) RTR, JCN: 1500597
Department of Transportation · Federal Aviation Administration
- Obligated
- $288.2K
- Period of performance
- Aug 29, 2024 – Oct 31, 2026
6973GH22F01733
Completed: Period of performance ended Oct 31, 2026BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR ERIE, PA (ERI) ASR JCN:22001753
Department of Transportation · Federal Aviation Administration
- Obligated
- $511K
- Period of performance
- Sep 13, 2022 – Oct 31, 2026
6973GH25F00306
Completed: Period of performance ended Oct 23, 2026BIL FUNDS SITE SPECIFIC LPGBS UPGRADE INSTALLATION AT DAYTONA BEACH, FL (DAB) ATCT JCN:24017065 (OLD JCN 18064951)
Department of Transportation · Federal Aviation Administration
- Obligated
- $59.4K
- Period of performance
- Jan 2, 2025 – Oct 23, 2026
697DCK26C00086
Completed: Period of performance ended Oct 20, 2026TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM
Department of Transportation · Federal Aviation Administration
- Obligated
- $1.2M
- Period of performance
- Mar 23, 2026 – Oct 20, 2026
6973GH25F00337
Completed: Period of performance ended Sep 30, 2026BIL FUNDS, 2024 OUTDOOR EG WITH SUBBASE TANK SITE SURVEY/DESIGN/INSTALL FOR WICHITA, KS (TWIA) ALS JCN:19005988
Department of Transportation · Federal Aviation Administration
- Obligated
- $360.8K
- Period of performance
- Jan 8, 2025 – Sep 30, 2026
6973GH24F01242
Completed: Period of performance ended Sep 30, 2026BIL FUNDS. 2024 INDOOR EG/ERMS/FST BASELINE FUNDING SITE SURVEY, DESIGN, INSTALL FOR POWER SYSTEM REPLACEMENT PROJECT MAIDEN, NC (QRM)…
Department of Transportation · Federal Aviation Administration
- Obligated
- $503.5K
- Period of performance
- Aug 6, 2024 – Sep 30, 2026
6973GH26F01107
Completed: Period of performance ended Aug 19, 2026EG FUNDED. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT NASHVILLE, TN (BNAE) ATCT JCN:235969
Department of Transportation · Federal Aviation Administration
- Obligated
- $35K
- Period of performance
- Jul 20, 2026 – Aug 19, 2026
6973GH25F01310
Completed: Period of performance ended Aug 15, 2026SITE SURVEY AND DESIGN FOR EG LED POWER SYSTEM REPLACEMENT OAHU WAIMANALO, HI (QQI) ASDE JCN:235985
Department of Transportation · Federal Aviation Administration
- Obligated
- $35.2K
- Period of performance
- Sep 5, 2025 – Aug 15, 2026
6973GH23F01726
Completed: Period of performance ended Aug 7, 2026BIL FUNDING FOR SITE SURVEY, DESIGN AND INSTALLATION REPLACEMENT FOR RALEIGH, NC (RDUC) ATCT JCN:1400778
Department of Transportation · Federal Aviation Administration
- Obligated
- $794.6K
- Period of performance
- Aug 23, 2023 – Aug 7, 2026
6973GH25F01306
Completed: Period of performance ended Jun 30, 2026SITE SURVEY AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT AGANA, GU (GUMC) RTR JCN:22002410
Department of Transportation · Federal Aviation Administration
- Obligated
- $0
- Period of performance
- Sep 5, 2025 – Jun 30, 2026
6973GH26F00594
Completed: Period of performance ended Jun 18, 2026IIJA AND F&E FUNDED MODERNIZATION INSTALLATION PROJECT(S) AT MULTIPLE LOCATIONS IN SANFORD, FL (LOCAL IMPLEMENTATION) SANFORD, FL (FNU)GS…
Department of Transportation · Federal Aviation Administration
- Obligated
- $209K
- Period of performance
- Apr 2, 2026 – Jun 18, 2026
6973GH25F00270
Completed: Period of performance ended Jun 1, 2026(BIL) AND (IIJA) FUNDS SITE SPECIFIC: SARASOTA, FL, (SRQ) ASR-9 UPGRADE INSTALLATION JCN:23000770
Department of Transportation · Federal Aviation Administration
- Obligated
- $70.7K
- Period of performance
- Dec 27, 2024 – Jun 1, 2026
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
6973GH26F01287 under 6973GH22D00016 CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) DESIGN FOR MINNEAPOLIS MN ATCT (MSP)JCN: 1800006 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $291.7K | Aug 18, 2026 – Aug 17, 2027 | Recompete 6–12 mo: Potential end Aug 17, 2027 (9 months away)AI brief for award 6973GH26F01287Bid team for the recompete of award 6973GH26F01287 |
697DCK26C00144 TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM | Department of Transportation · Federal Aviation Administration | 236220 · Y1BBCONSTRUCTION OF AIR TRAFFIC CONTROL TRAINING FACILITIES | $5.1M | Jun 25, 2026 – Jul 26, 2027 | Recompete 6–12 mo: Potential end Jul 26, 2027 (8 months away)AI brief for award 697DCK26C00144Bid team for the recompete of award 697DCK26C00144 |
6973GH26F01098 under 6973GH22D00016 IIJA FUNDS. 2025 PROPANE BASELINE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS AT FRESNO, CA (FATA) ATCT JCN:1501845 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $125.1K | Jul 20, 2026 – Jun 24, 2027 | Recompete 6–12 mo: Potential end Jun 24, 2027 (7 months away)AI brief for award 6973GH26F01098Bid team for the recompete of award 6973GH26F01098 |
697DCK26C00154 INTERNET PROTOCOL VOICE COMMUNICATION SYSTEMS | Department of Transportation · Federal Aviation Administration | 238210 · Y1BGCONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES | $1.7M | Jun 17, 2026 – Jun 16, 2027 | Recompete 6–12 mo: Potential end Jun 16, 2027 (7 months away)AI brief for award 697DCK26C00154Bid team for the recompete of award 697DCK26C00154 |
6973GH26F00723 under 6973GH22D00016 (IIJA) FUNDED DESIGN AND MODERNIZATION INSTALL PROJECT(S) MULTIPLE SITES: (MXF)ASR, MAXWELL AFB, AL, JCN:23000763 (ATL)ASR, ATLANTA, GA,… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $463.1K | Apr 29, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH26F00723Bid team for the recompete of award 6973GH26F00723 |
6973GH24F01234 under 6973GH22D00016 BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT NEWARK, NJ (EZA) ALS, JCN: 1503146 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $359.6K | Aug 5, 2024 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH24F01234Bid team for the recompete of award 6973GH24F01234 |
6973GH24F00934 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF DIESEL FST AT MONROE, LA (MLUA) ATCT, JCN: 18026575 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $240.9K | May 23, 2024 – Dec 30, 2026 | Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)AI brief for award 6973GH24F00934Bid team for the recompete of award 6973GH24F00934 |
6973GH24F00941 under 6973GH22D00016 BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT WILMINGTON, NC (ILMA) ASR, JCN: 24012304 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $259.9K | May 23, 2024 – Dec 30, 2026 | Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)AI brief for award 6973GH24F00941Bid team for the recompete of award 6973GH24F00941 |
6973GH23F01656 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT MEMPHIS, TN (MEMA) ASR JCN: 23000546 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $389.3K | Aug 10, 2023 – Dec 30, 2026 | Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)AI brief for award 6973GH23F01656Bid team for the recompete of award 6973GH23F01656 |
6973GH24F01387 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT LINCOLNTON, GA (QNK) ARSR, JCN: 22007812 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $338.9K | Aug 29, 2024 – Nov 30, 2026 | Recompete < 6 mo: Potential end Nov 30, 2026 (under a month away)AI brief for award 6973GH24F01387Bid team for the recompete of award 6973GH24F01387 |
6973GH25F00288 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT DOUGLASTON, NY (QDG) RCLR, JCN: 1503559 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $302.5K | Dec 19, 2024 – Nov 20, 2026 | Recompete < 6 mo: Potential end Nov 20, 2026 (under a month away)AI brief for award 6973GH25F00288Bid team for the recompete of award 6973GH25F00288 |
6973GH26F00378 under 6973GH22D00016 SITE SURVEY, REPORT AND DESIGN FUNDING FOR POWER SYSTEM REPLACEMENT PROJECTS AT WEST MESA, NM (QSA) ARSR JCN: 19007421 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $33.3K | Feb 9, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH24F01457 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT FORT YUKON, AK (FYU) BLDG, JCN: 1501870 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $456.3K | Sep 6, 2024 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH24F01393 under 6973GH22D00016 ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT ROMULUS, MI (DTWD) RTR, JCN: 1500597 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $288.2K | Aug 29, 2024 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH22F01733 under 6973GH22D00016 BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR ERIE, PA (ERI) ASR JCN:22001753 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $511K | Sep 13, 2022 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH25F00306 under 6973GH22D00016 BIL FUNDS SITE SPECIFIC LPGBS UPGRADE INSTALLATION AT DAYTONA BEACH, FL (DAB) ATCT JCN:24017065 (OLD JCN 18064951) | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $59.4K | Jan 2, 2025 – Oct 23, 2026 | Completed: Period of performance ended Oct 23, 2026 |
697DCK26C00086 TOWER SIMULATOR SYSTEM (TSS) STANDALONE SIMULATION SYSTEM | Department of Transportation · Federal Aviation Administration | 236220 · Y1BBCONSTRUCTION OF AIR TRAFFIC CONTROL TRAINING FACILITIES | $1.2M | Mar 23, 2026 – Oct 20, 2026 | Completed: Period of performance ended Oct 20, 2026 |
6973GH25F00337 under 6973GH22D00016 BIL FUNDS, 2024 OUTDOOR EG WITH SUBBASE TANK SITE SURVEY/DESIGN/INSTALL FOR WICHITA, KS (TWIA) ALS JCN:19005988 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $360.8K | Jan 8, 2025 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
6973GH24F01242 under 6973GH22D00016 BIL FUNDS. 2024 INDOOR EG/ERMS/FST BASELINE FUNDING SITE SURVEY, DESIGN, INSTALL FOR POWER SYSTEM REPLACEMENT PROJECT MAIDEN, NC (QRM)… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $503.5K | Aug 6, 2024 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
6973GH26F01107 under 6973GH22D00016 EG FUNDED. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT NASHVILLE, TN (BNAE) ATCT JCN:235969 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $35K | Jul 20, 2026 – Aug 19, 2026 | Completed: Period of performance ended Aug 19, 2026 |
6973GH25F01310 under 6973GH22D00016 SITE SURVEY AND DESIGN FOR EG LED POWER SYSTEM REPLACEMENT OAHU WAIMANALO, HI (QQI) ASDE JCN:235985 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $35.2K | Sep 5, 2025 – Aug 15, 2026 | Completed: Period of performance ended Aug 15, 2026 |
6973GH23F01726 under 6973GH22D00016 BIL FUNDING FOR SITE SURVEY, DESIGN AND INSTALLATION REPLACEMENT FOR RALEIGH, NC (RDUC) ATCT JCN:1400778 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $794.6K | Aug 23, 2023 – Aug 7, 2026 | Completed: Period of performance ended Aug 7, 2026 |
6973GH25F01306 under 6973GH22D00016 SITE SURVEY AND DESIGN FOR THE 2025 OUTDOOR EG BASELINE AT AGANA, GU (GUMC) RTR JCN:22002410 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $0 | Sep 5, 2025 – Jun 30, 2026 | Completed: Period of performance ended Jun 30, 2026 |
6973GH26F00594 under 6973GH22D00016 IIJA AND F&E FUNDED MODERNIZATION INSTALLATION PROJECT(S) AT MULTIPLE LOCATIONS IN SANFORD, FL (LOCAL IMPLEMENTATION) SANFORD, FL (FNU)GS… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $209K | Apr 2, 2026 – Jun 18, 2026 | Completed: Period of performance ended Jun 18, 2026 |
6973GH25F00270 under 6973GH22D00016 (BIL) AND (IIJA) FUNDS SITE SPECIFIC: SARASOTA, FL, (SRQ) ASR-9 UPGRADE INSTALLATION JCN:23000770 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $70.7K | Dec 27, 2024 – Jun 1, 2026 | Completed: Period of performance ended Jun 1, 2026 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 238210Electrical Contractors and Other Wiring Installation ContractorsPrimarySmall business under this code’s size standard
- 238170Title not in the curated listSmall business under this code’s size standard
- 238990All Other Specialty Trade ContractorsSmall business under this code’s size standard
- 238350Finish Carpentry ContractorsSmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 238120Structural Steel and Precast Concrete ContractorsSmall business under this code’s size standard
- 238330Flooring ContractorsSmall business under this code’s size standard
- 238320Painting and Wall Covering ContractorsSmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 238160Roofing ContractorsSmall business under this code’s size standard
- 238110Poured Concrete Foundation and Structure ContractorsSmall business under this code’s size standard
- 238220Plumbing, Heating, and Air-Conditioning ContractorsSmall business under this code’s size standard
- 238150Title not in the curated listSmall business under this code’s size standard
- 238140Title not in the curated listSmall business under this code’s size standard
- 238190Other Foundation, Structure, and Building Exterior ContractorsSmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering ConstructionSmall business under this code’s size standard
- 561621Security Systems Services (except Locksmiths)Small business under this code’s size standard
- 488119Other Airport OperationsSmall business under this code’s size standard
- 238310Drywall and Insulation ContractorsSmall business under this code’s size standard
SAM.gov reports this entity as small under 20 of 20 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
- Y1GCCONSTRUCTION OF FUEL STORAGE BUILDINGS
- Y1GACONSTRUCTION OF AMMUNITION STORAGE BUILDINGS
- Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES
- Y1NACONSTRUCTION OF FUEL SUPPLY FACILITIES
- Y1PCCONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)
- Y1PACONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 11, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with URBAN ELECTRIC, INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
