M & F CONCRETE, INC.
Doing business as M & F CONCRETE INC
- MANASSAS, VA 20109-2716
- mfbuild.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM expiring
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Small Disadvantaged Business
Registration and small-business types: SAM.gov, synced Nov 12, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $17.4M
- Awards on record
- 71
- Contract vehicles
- 0
- Verified credentials
- 0
SAM.gov registration expires in 53 days
M & F CONCRETE, INC.’s registration expires on Jan 6, 2027. Renewal can take weeks; confirm it stays active through proposal submission and award.
View on SAM.gov (opens in a new tab)Learn more about SAM registration and the UEI
About M & F CONCRETE, INC.
- Headquarters
- MANASSAS, VA 20109-2716
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIC7MJJ9QNGDD5
- CAGE5C8C8
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $17.4M
- Awards on record
- 71
- Top funding agencies
- Department of the Army
25 most recent of 71 awards
W91QV125FA153
Completed: Period of performance ended Sep 25, 2026BLDG 329 CONCRETE REPAIR OF SINK HOLE AND CONSTRUCT CONCRETE PADS.
Department of Defense · Department of the Army
- Obligated
- $198K
- Period of performance
- Sep 26, 2025 – Sep 25, 2026
W91QV125FA125
Completed: Period of performance ended Sep 23, 2026THE CONTRACTOR SHALL REMOVE THE EXISTING CULVERT AND CONSTRUCT THE REPLACEMENT CULVERT CROSSING IN ACCORDANCE WITH THE ATTACHED DESIGN,…
Department of Defense · Department of the Army
- Obligated
- $667.1K
- Period of performance
- Sep 24, 2025 – Sep 23, 2026
W91QV125FA056
Completed: Period of performance ended Sep 15, 2026REPAIR BUZZARDS ROOST DAM AS DEFINED IN SOW.
Department of Defense · Department of the Army
- Obligated
- $690.7K
- Period of performance
- Sep 15, 2025 – Sep 15, 2026
W91QV125F0164
Completed: Period of performance ended Apr 27, 2026REPAIR BY REPLACEMENT RANGE 24 NORTH FIREBREAK LOW WATER CROSSING AT FORT WALKER
Department of Defense · Department of the Army
- Obligated
- $577.3K
- Period of performance
- Mar 28, 2025 – Apr 27, 2026
W91QV125F0110
Completed: Period of performance ended Apr 25, 2026CVWF PM AND REPAIRS
Department of Defense · Department of the Army
- Obligated
- $75K
- Period of performance
- Apr 26, 2025 – Apr 25, 2026
W91QV125F0098
Completed: Period of performance ended Feb 10, 2026REPAIR BY REPLACEMENT LOW WATER CROSSING LIBERTY POND FORT WALKER, VA. F4018AA - NEW DROP INLET
Department of Defense · Department of the Army
- Obligated
- $589K
- Period of performance
- Feb 19, 2025 – Feb 10, 2026
W91QV125F0152
Completed: Period of performance ended Jan 26, 2026REPAIR CULVERT 1870 RG24 - 4026 - NEW CONCRETE STRUCTURES
Department of Defense · Department of the Army
- Obligated
- $220.4K
- Period of performance
- Feb 26, 2025 – Jan 26, 2026
W91QV125FA145
Completed: Period of performance ended Dec 24, 2025GRAVITY SANITARY SEWER SERVICE FAILED AT QTRS 4. QTRS 4 IS SERVED WITH INDIVIDUAL SANITARY SEWER MAIN, GENERALLY LOCATED IN THE FRONT YARD…
Department of Defense · Department of the Army
- Obligated
- $177.1K
- Period of performance
- Sep 24, 2025 – Dec 24, 2025
W91QV125F0111
Completed: Period of performance ended Dec 23, 20254026 - NEW CONCRETE STRUCTURES
Department of Defense · Department of the Army
- Obligated
- $483.1K
- Period of performance
- Jan 23, 2025 – Dec 23, 2025
W91QV125FA110
Completed: Period of performance ended Dec 16, 2025THE REMOVAL OF THE EXISTING BRIDGE DECK WHILE MAINTAINING THE EXISTING SUPPORT COLUMNS, REPLACEMENT WITH AN IN-KIND REINFORCED CONCRETE…
Department of Defense · Department of the Army
- Obligated
- $108.2K
- Period of performance
- Sep 15, 2025 – Dec 16, 2025
W91QV126FA006
Completed: Period of performance ended Nov 27, 2025THE PURPOSE OF THIS ORDER IS TO REPAIR A 3 INCH PIPE REPAIR AT JBMHH ON SOUTHEAST SIDE OF BUILDING B480.
Department of Defense · Department of the Army
- Obligated
- $44.9K
- Period of performance
- Nov 25, 2025 – Nov 27, 2025
W91QV126F0001
Completed: Period of performance ended Nov 6, 2025THIS CONTRACTUAL ACTION IS ENTERED TO OBLIGATE THE GOVERNMENT IN ADVANCE OF APPROPRIATIONS. APPROPRIATED FUNDS ARE NOT CURRENTLY AVAILABLE…
Department of Defense · Department of the Army
- Obligated
- $44.9K
- Period of performance
- Nov 4, 2025 – Nov 6, 2025
W91QV125FA105
Completed: Period of performance ended Oct 31, 2025BUILDING 214 RETAINING WALL LOCATED WITHIN THE PATTON HALL POOL COMPLEX BEHIND B214 ON BUFFALO SOLIDER AVE AND CUSTER RD
Department of Defense · Department of the Army
- Obligated
- $150.6K
- Period of performance
- Jul 21, 2025 – Oct 31, 2025
W91QV125F0165
Completed: Period of performance ended Oct 24, 2025UPPER DELOS DAM REPAIR FT WALKER
Department of Defense · Department of the Army
- Obligated
- $534.4K
- Period of performance
- Apr 1, 2025 – Oct 24, 2025
W91QV125FA107
Completed: Period of performance ended Oct 14, 2025EXISTING SECTION OF SCREEN WALL FOR LARGE ELECTRIC GENERATOR LOCATED ON WEST SIDE OF US MILITARY ROAD AT INTERSECTION WITH SOUTHGATE ROAD…
Department of Defense · Department of the Army
- Obligated
- $22.7K
- Period of performance
- Jul 14, 2025 – Oct 14, 2025
W91QV125FA159
Completed: Period of performance ended Oct 7, 2025JBMHH EMERGENCY WATER MAIN REPAIR SHERIDAN AVENUE - ABRAMS LANE
Department of Defense · Department of the Army
- Obligated
- $241.5K
- Period of performance
- Sep 28, 2025 – Oct 7, 2025
W91QV125F0159
Completed: Period of performance ended Sep 26, 2025CONCRETE REPAIR
Department of Defense · Department of the Army
- Obligated
- $1.9M
- Period of performance
- Mar 13, 2025 – Sep 26, 2025
W91QV125FA078
Completed: Period of performance ended Sep 23, 2025JBMHH MC BRICK WALL PARKING LOT REPAIR B39 AND B47
Department of Defense · Department of the Army
- Obligated
- $112K
- Period of performance
- Jun 25, 2025 – Sep 23, 2025
W91QV125FA098
Completed: Period of performance ended Sep 18, 2025THE PURPOSE OF THIS REPAIR AND CLEANUP OF IMPROVEMENTS FOR MY BARRACKS B248 SOLDIERS IS AN EMERGENCY CONDITION, WHICH REQUIRES EXPEDITED…
Department of Defense · Department of the Army
- Obligated
- $196.1K
- Period of performance
- Jul 8, 2025 – Sep 18, 2025
W91QV124F0346
Completed: Period of performance ended Aug 25, 2025PREVENTATIVE MAINTENANCE AND REPAIRS OF THE CENTRAL VEHICLE WASH FACILITY. CVWF 3018AA - NEW DROP INLET
Department of Defense · Department of the Army
- Obligated
- $47.8K
- Period of performance
- Jul 25, 2024 – Aug 25, 2025
W91QV125FA050
Completed: Period of performance ended Aug 15, 2025GORGAS ROAD CROSSWALK BETWEEN MY B417 AND B419 TO FLAGPOLE REPAIR THROUGH CURRENT CONCRETE IDIQ CONTRACT.
Department of Defense · Department of the Army
- Obligated
- $38.9K
- Period of performance
- Jun 13, 2025 – Aug 15, 2025
W91QV125FA048
Completed: Period of performance ended Aug 1, 2025THIS PROJECT INVOLVES ADDRESSING STRUCTURAL DAMAGE IN BUILDING 52 MCNAIR, FOCUSING ON TWO SIGNIFICANT CRACKS IN THE CONCRETE SLABS AT THE…
Department of Defense · Department of the Army
- Obligated
- $119.4K
- Period of performance
- May 21, 2025 – Aug 1, 2025
W91QV125F0042
Completed: Period of performance ended Jul 30, 2025REPAIR WHITES LAKES DAM, ARMOR EMBANKMENT. REPAIR S4026 - NEW CONCRETE STRUCTURES
Department of Defense · Department of the Army
- Obligated
- $944.3K
- Period of performance
- Jan 31, 2025 – Jul 30, 2025
W91QV125F0161
Completed: Period of performance ended Jul 7, 20254008 - CONCRETE WORK REMOVAL
Department of Defense · Department of the Army
- Obligated
- $5.7K
- Period of performance
- Jul 7, 2025 – Jul 7, 2025
W91QV125F0157
Completed: Period of performance ended Jun 2, 2025SINK HOLE REPAIR - 4036 - PROVIDE SURVEYING, ENGINEERING, A
Department of Defense · Department of the Army
- Obligated
- $70.2K
- Period of performance
- Feb 25, 2025 – Jun 2, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W91QV125FA153 under W9124J20D0011 BLDG 329 CONCRETE REPAIR OF SINK HOLE AND CONSTRUCT CONCRETE PADS. | Department of Defense · Department of the Army | 237310 · M1AZOPERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $198K | Sep 26, 2025 – Sep 25, 2026 | Completed: Period of performance ended Sep 25, 2026 |
W91QV125FA125 under W9124J20D0011 THE CONTRACTOR SHALL REMOVE THE EXISTING CULVERT AND CONSTRUCT THE REPLACEMENT CULVERT CROSSING IN ACCORDANCE WITH THE ATTACHED DESIGN,… | Department of Defense · Department of the Army | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $667.1K | Sep 24, 2025 – Sep 23, 2026 | Completed: Period of performance ended Sep 23, 2026 |
W91QV125FA056 under W9124J20D0011 REPAIR BUZZARDS ROOST DAM AS DEFINED IN SOW. | Department of Defense · Department of the Army | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $690.7K | Sep 15, 2025 – Sep 15, 2026 | Completed: Period of performance ended Sep 15, 2026 |
W91QV125F0164 under W9124J20D0011 REPAIR BY REPLACEMENT RANGE 24 NORTH FIREBREAK LOW WATER CROSSING AT FORT WALKER | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $577.3K | Mar 28, 2025 – Apr 27, 2026 | Completed: Period of performance ended Apr 27, 2026 |
W91QV125F0110 under W9124J20D0011 CVWF PM AND REPAIRS | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $75K | Apr 26, 2025 – Apr 25, 2026 | Completed: Period of performance ended Apr 25, 2026 |
W91QV125F0098 under W9124J20D0011 REPAIR BY REPLACEMENT LOW WATER CROSSING LIBERTY POND FORT WALKER, VA. F4018AA - NEW DROP INLET | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $589K | Feb 19, 2025 – Feb 10, 2026 | Completed: Period of performance ended Feb 10, 2026 |
W91QV125F0152 under W9124J20D0011 REPAIR CULVERT 1870 RG24 - 4026 - NEW CONCRETE STRUCTURES | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $220.4K | Feb 26, 2025 – Jan 26, 2026 | Completed: Period of performance ended Jan 26, 2026 |
W91QV125FA145 under W9124J20D0011 GRAVITY SANITARY SEWER SERVICE FAILED AT QTRS 4. QTRS 4 IS SERVED WITH INDIVIDUAL SANITARY SEWER MAIN, GENERALLY LOCATED IN THE FRONT YARD… | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $177.1K | Sep 24, 2025 – Dec 24, 2025 | Completed: Period of performance ended Dec 24, 2025 |
W91QV125F0111 under W9124J20D0011 4026 - NEW CONCRETE STRUCTURES | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $483.1K | Jan 23, 2025 – Dec 23, 2025 | Completed: Period of performance ended Dec 23, 2025 |
W91QV125FA110 under W9124J20D0011 THE REMOVAL OF THE EXISTING BRIDGE DECK WHILE MAINTAINING THE EXISTING SUPPORT COLUMNS, REPLACEMENT WITH AN IN-KIND REINFORCED CONCRETE… | Department of Defense · Department of the Army | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $108.2K | Sep 15, 2025 – Dec 16, 2025 | Completed: Period of performance ended Dec 16, 2025 |
W91QV126FA006 under W9124J20D0011 THE PURPOSE OF THIS ORDER IS TO REPAIR A 3 INCH PIPE REPAIR AT JBMHH ON SOUTHEAST SIDE OF BUILDING B480. | Department of Defense · Department of the Army | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $44.9K | Nov 25, 2025 – Nov 27, 2025 | Completed: Period of performance ended Nov 27, 2025 |
W91QV126F0001 under W9124J20D0011 THIS CONTRACTUAL ACTION IS ENTERED TO OBLIGATE THE GOVERNMENT IN ADVANCE OF APPROPRIATIONS. APPROPRIATED FUNDS ARE NOT CURRENTLY AVAILABLE… | Department of Defense · Department of the Army | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $44.9K | Nov 4, 2025 – Nov 6, 2025 | Completed: Period of performance ended Nov 6, 2025 |
W91QV125FA105 under W9124J20D0011 BUILDING 214 RETAINING WALL LOCATED WITHIN THE PATTON HALL POOL COMPLEX BEHIND B214 ON BUFFALO SOLIDER AVE AND CUSTER RD | Department of Defense · Department of the Army | 237310 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $150.6K | Jul 21, 2025 – Oct 31, 2025 | Completed: Period of performance ended Oct 31, 2025 |
W91QV125F0165 under W9124J20D0011 UPPER DELOS DAM REPAIR FT WALKER | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $534.4K | Apr 1, 2025 – Oct 24, 2025 | Completed: Period of performance ended Oct 24, 2025 |
W91QV125FA107 under W9124J20D0011 EXISTING SECTION OF SCREEN WALL FOR LARGE ELECTRIC GENERATOR LOCATED ON WEST SIDE OF US MILITARY ROAD AT INTERSECTION WITH SOUTHGATE ROAD… | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $22.7K | Jul 14, 2025 – Oct 14, 2025 | Completed: Period of performance ended Oct 14, 2025 |
W91QV125FA159 under W9124J20D0011 JBMHH EMERGENCY WATER MAIN REPAIR SHERIDAN AVENUE - ABRAMS LANE | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $241.5K | Sep 28, 2025 – Oct 7, 2025 | Completed: Period of performance ended Oct 7, 2025 |
W91QV125F0159 under W9124J20D0011 CONCRETE REPAIR | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.9M | Mar 13, 2025 – Sep 26, 2025 | Completed: Period of performance ended Sep 26, 2025 |
W91QV125FA078 under W9124J20D0011 JBMHH MC BRICK WALL PARKING LOT REPAIR B39 AND B47 | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $112K | Jun 25, 2025 – Sep 23, 2025 | Completed: Period of performance ended Sep 23, 2025 |
W91QV125FA098 under W9124J20D0011 THE PURPOSE OF THIS REPAIR AND CLEANUP OF IMPROVEMENTS FOR MY BARRACKS B248 SOLDIERS IS AN EMERGENCY CONDITION, WHICH REQUIRES EXPEDITED… | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $196.1K | Jul 8, 2025 – Sep 18, 2025 | Completed: Period of performance ended Sep 18, 2025 |
W91QV124F0346 under W9124J20D0011 PREVENTATIVE MAINTENANCE AND REPAIRS OF THE CENTRAL VEHICLE WASH FACILITY. CVWF 3018AA - NEW DROP INLET | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $47.8K | Jul 25, 2024 – Aug 25, 2025 | Completed: Period of performance ended Aug 25, 2025 |
W91QV125FA050 under W9124J20D0011 GORGAS ROAD CROSSWALK BETWEEN MY B417 AND B419 TO FLAGPOLE REPAIR THROUGH CURRENT CONCRETE IDIQ CONTRACT. | Department of Defense · Department of the Army | 237310 · Z2QAREPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $38.9K | Jun 13, 2025 – Aug 15, 2025 | Completed: Period of performance ended Aug 15, 2025 |
W91QV125FA048 under W9124J20D0011 THIS PROJECT INVOLVES ADDRESSING STRUCTURAL DAMAGE IN BUILDING 52 MCNAIR, FOCUSING ON TWO SIGNIFICANT CRACKS IN THE CONCRETE SLABS AT THE… | Department of Defense · Department of the Army | 237310 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $119.4K | May 21, 2025 – Aug 1, 2025 | Completed: Period of performance ended Aug 1, 2025 |
W91QV125F0042 under W9124J20D0011 REPAIR WHITES LAKES DAM, ARMOR EMBANKMENT. REPAIR S4026 - NEW CONCRETE STRUCTURES | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $944.3K | Jan 31, 2025 – Jul 30, 2025 | Completed: Period of performance ended Jul 30, 2025 |
W91QV125F0161 under W9124J20D0011 4008 - CONCRETE WORK REMOVAL | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $5.7K | Jul 7, 2025 – Jul 7, 2025 | Completed: Period of performance ended Jul 7, 2025 |
W91QV125F0157 under W9124J20D0011 SINK HOLE REPAIR - 4036 - PROVIDE SURVEYING, ENGINEERING, A | Department of Defense · Department of the Army | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $70.2K | Feb 25, 2025 – Jun 2, 2025 | Completed: Period of performance ended Jun 2, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237310Highway, Street, and Bridge ConstructionPrimarySmall business under this code’s size standard
- 236118Residential RemodelersSmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238130Title not in the curated list
- 238140Title not in the curated list
- 238150Title not in the curated list
- 238160Roofing Contractors
- 238170Title not in the curated list
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 238210Electrical Contractors and Other Wiring Installation Contractors
- 238220Plumbing, Heating, and Air-Conditioning Contractors
- 238310Drywall and Insulation Contractors
- 238320Painting and Wall Covering Contractors
- 238330Flooring Contractors
- 238350Finish Carpentry Contractors
- 238390Other Building Finishing Contractors
- 238910Site Preparation Contractors
- 238990All Other Specialty Trade Contractors
- 327390Title not in the curated listSmall business under this code’s size standard
- 484110General Freight Trucking, LocalSmall business under this code’s size standard
- 484210Title not in the curated listSmall business under this code’s size standard
- 561730Landscaping Services
- 562910Remediation Services
SAM.gov reports this entity as small under 8 of 28 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 12, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with M & F CONCRETE, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
