MOWA-BARLOVENTO JOINT VENTURE A
Doing business as MOWA-BARLOVENTO JV-A
- GAUTIER, MS 39553-6066
- Partnership or Limited Liability Partnership
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Small Disadvantaged Business
Registration and small-business types: SAM.gov, synced Nov 12, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $233.9M
- Awards on record
- 26
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
MOWA-BARLOVENTO JOINT VENTURE A has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About MOWA-BARLOVENTO JOINT VENTURE A
- Headquarters
- GAUTIER, MS 39553-6066
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIC8TLJHGBMJM8
- CAGE6TX36
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $233.9M
- Awards on record
- 26
- Top funding agencies
- Department of the Air Force
25 most recent of 26 awards
FA890319F0153
Recompete < 6 mo: Potential end May 12, 2027 (5 months away)DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER…
Department of Defense · Department of the Air Force
- Obligated
- $49.2M
- Period of performance
- Jun 18, 2019 – May 12, 2027
FA301622F0214
Recompete < 6 mo: Potential end Jan 15, 2027 (2 months away)REPAIR BY RENOVATION B1375
Department of Defense · Department of the Air Force
- Obligated
- $19M
- Period of performance
- Jun 17, 2022 – Jan 15, 2027
FA460023F0073
Completed: Period of performance ended Sep 28, 2026REPAIR ELECTRICAL SUBSTATION B565 AT OFFUTT AFB, NE
Department of Defense · Department of the Air Force
- Obligated
- $6.9M
- Period of performance
- Jul 27, 2023 – Sep 28, 2026
FA805124F0045
Completed: Period of performance ended Aug 24, 2026ARNOLD AFB TN AMRS PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $3.9M
- Period of performance
- Jul 15, 2024 – Aug 24, 2026
FA805124F0049
Completed: Period of performance ended Jul 30, 2026MACDILL AFB FL AMRS PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $2.6M
- Period of performance
- Aug 15, 2024 – Jul 30, 2026
FA805124F0044
Completed: Period of performance ended Jul 30, 2026BARKSDALE AFB AMRS PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $3.2M
- Period of performance
- Aug 1, 2024 – Jul 30, 2026
FA890324F0023
Completed: Period of performance ended Jun 1, 2026DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL
Department of Defense · Department of the Air Force
- Obligated
- $50.9M
- Period of performance
- Dec 13, 2023 – Jun 1, 2026
FA252124F0413
Completed: Period of performance ended May 13, 2026PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES.
Department of Defense · Department of the Air Force
- Obligated
- $6.9M
- Period of performance
- Sep 26, 2024 – May 13, 2026
FA890324F0068
Completed: Period of performance ended May 7, 2026DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT…
Department of Defense · Department of the Air Force
- Obligated
- $14.7M
- Period of performance
- May 31, 2024 – May 7, 2026
FA487724F0195
Completed: Period of performance ended Jan 31, 2026CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE…
Department of Defense · Department of the Air Force
- Obligated
- $4.7M
- Period of performance
- Sep 1, 2024 – Jan 31, 2026
FA301621F0585
Completed: Period of performance ended Jan 30, 2026THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND…
Department of Defense · Department of the Air Force
- Obligated
- $21.5M
- Period of performance
- Sep 29, 2021 – Jan 30, 2026
FA460024F0213
Completed: Period of performance ended Jan 28, 2026REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE
Department of Defense · Department of the Air Force
- Obligated
- $1.2M
- Period of performance
- Sep 26, 2024 – Jan 28, 2026
FA805123F0026
Completed: Period of performance ended Oct 15, 2025HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS)
Department of Defense · Department of the Air Force
- Obligated
- $3.4M
- Period of performance
- Aug 7, 2023 – Oct 15, 2025
FA301624F0315
Completed: Period of performance ended Oct 9, 2025RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR…
Department of Defense · Department of the Air Force
- Obligated
- $971.7K
- Period of performance
- Sep 16, 2024 – Oct 9, 2025
FA303024F0043
Completed: Period of performance ended Aug 22, 2025REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY…
Department of Defense · Department of the Air Force
- Obligated
- $1M
- Period of performance
- Sep 20, 2024 – Aug 22, 2025
FA301623F0358
Completed: Period of performance ended May 30, 2025REPLACE AIRFIELD LIGHTING (ALSF-1) AND (ALCMS-1) RANDOLPH, TX.
Department of Defense · Department of the Air Force
- Obligated
- $3.3M
- Period of performance
- Jul 28, 2023 – May 30, 2025
FA460024F0212
Completed: Period of performance ended May 27, 2025REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE
Department of Defense · Department of the Air Force
- Obligated
- $703.5K
- Period of performance
- Sep 26, 2024 – May 27, 2025
FA301622F0437
Completed: Period of performance ended Apr 16, 2025REPAIR OF CONFINEMENT FACILITY - CHAPMAN ANNEX, JBSA TX
Department of Defense · Department of the Air Force
- Obligated
- $3.5M
- Period of performance
- Aug 9, 2022 – Apr 16, 2025
FA890322F0127
Completed: Period of performance ended Apr 2, 2025CONSTRUCTION OF APRON A AT KIRTLAND AFB
Department of Defense · Department of the Air Force
- Obligated
- $15.5M
- Period of performance
- Sep 16, 2022 – Apr 2, 2025
FA301622F0401
Completed: Period of performance ended Feb 22, 2025REPAIR HVAC B.5450 AND B.5460
Department of Defense · Department of the Air Force
- Obligated
- $3.7M
- Period of performance
- Jul 26, 2022 – Feb 22, 2025
FA890322F0045
Completed: Period of performance ended Dec 18, 2024RECONSTRUCT MAIN OPERATION APRON, CANNON AFB, NM. PROJECT #CZQZ1067057
Department of Defense · Department of the Air Force
- Obligated
- $9.7M
- Period of performance
- Apr 7, 2022 – Dec 18, 2024
FA805122F0053
Completed: Period of performance ended Oct 15, 2024MCCONNELL AFB AMRS
Department of Defense · Department of the Air Force
- Obligated
- $2.8M
- Period of performance
- Sep 29, 2022 – Oct 15, 2024
FA890323F0140
Completed: Period of performance ended Aug 12, 2024DESIGN AND CONSTRUCTION FOR SECURITY FENCE AROUND MAIN RAMP AT EBBING FIELD, FT SMITH, AR.
Department of Defense · Department of the Air Force
- Obligated
- $700.9K
- Period of performance
- Oct 3, 2023 – Aug 12, 2024
FA805121F0043
Completed: Period of performance ended Aug 2, 2024SHAW AFB ADVANCED METER READING SYSTEM (AMRS)
Department of Defense · Department of the Air Force
- Obligated
- $1.6M
- Period of performance
- Jul 30, 2021 – Aug 2, 2024
FA303023F0081
Completed: Period of performance ended Jun 3, 2024REPAIR APACHE TRAIL - GOODFELLOW AFB
Department of Defense · Department of the Air Force
- Obligated
- $727.8K
- Period of performance
- Sep 29, 2023 – Jun 3, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
FA890319F0153 under FA890317D0020 DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR AIRBORNE WARNING AND CONTROL SYSTEM APRON PHASE II, REPAIR WEST AIR LOGISTICS CENTER… | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $49.2M | Jun 18, 2019 – May 12, 2027 | Recompete < 6 mo: Potential end May 12, 2027 (5 months away)AI brief for award FA890319F0153Bid team for the recompete of award FA890319F0153 |
FA301622F0214 under FA890317D0020 REPAIR BY RENOVATION B1375 | Department of Defense · Department of the Air Force | 236220 · Z2CZREPAIR OR ALTERATION OF OTHER EDUCATIONAL BUILDINGS | $19M | Jun 17, 2022 – Jan 15, 2027 | Recompete < 6 mo: Potential end Jan 15, 2027 (2 months away)AI brief for award FA301622F0214Bid team for the recompete of award FA301622F0214 |
FA460023F0073 under FA890317D0020 REPAIR ELECTRICAL SUBSTATION B565 AT OFFUTT AFB, NE | Department of Defense · Department of the Air Force | 236220 · Y1BGCONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES | $6.9M | Jul 27, 2023 – Sep 28, 2026 | Completed: Period of performance ended Sep 28, 2026 |
FA805124F0045 under FA890317D0020 ARNOLD AFB TN AMRS PROJECT | Department of Defense · Department of the Air Force | 236220 · R499SUPPORT- PROFESSIONAL: OTHER | $3.9M | Jul 15, 2024 – Aug 24, 2026 | Completed: Period of performance ended Aug 24, 2026 |
FA805124F0049 under FA890317D0032 MACDILL AFB FL AMRS PROJECT | Department of Defense · Department of the Air Force | 236220 · R499SUPPORT- PROFESSIONAL: OTHER | $2.6M | Aug 15, 2024 – Jul 30, 2026 | Completed: Period of performance ended Jul 30, 2026 |
FA805124F0044 under FA890317D0020 BARKSDALE AFB AMRS PROJECT | Department of Defense · Department of the Air Force | 236220 · R499SUPPORT- PROFESSIONAL: OTHER | $3.2M | Aug 1, 2024 – Jul 30, 2026 | Completed: Period of performance ended Jul 30, 2026 |
FA890324F0023 under FA890317D0032 DESIGN BID BUILD CONSTRUCTION SERVICES TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS AT CAPE CANAVERAL SFS, FL | Department of Defense · Department of the Air Force | 236220 · Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS | $50.9M | Dec 13, 2023 – Jun 1, 2026 | Completed: Period of performance ended Jun 1, 2026 |
FA252124F0413 under FA890317D0032 PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES. | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $6.9M | Sep 26, 2024 – May 13, 2026 | Completed: Period of performance ended May 13, 2026 |
FA890324F0068 under FA890317D0020 DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT… | Department of Defense · Department of the Air Force | 236220 · Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS | $14.7M | May 31, 2024 – May 7, 2026 | Completed: Period of performance ended May 7, 2026 |
FA487724F0195 under FA890317D0010 CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE… | Department of Defense · Department of the Air Force | 236220 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $4.7M | Sep 1, 2024 – Jan 31, 2026 | Completed: Period of performance ended Jan 31, 2026 |
FA301621F0585 under FA890317D0020 THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH A GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND… | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $21.5M | Sep 29, 2021 – Jan 30, 2026 | Completed: Period of performance ended Jan 30, 2026 |
FA460024F0213 under FA890317D0020 REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $1.2M | Sep 26, 2024 – Jan 28, 2026 | Completed: Period of performance ended Jan 28, 2026 |
FA805123F0026 under FA890317D0020 HOLLOMAN AIR FORCE BASE ADVANCED METER READING SYSTEM (AMRS) | Department of Defense · Department of the Air Force | 236220 · R499SUPPORT- PROFESSIONAL: OTHER | $3.4M | Aug 7, 2023 – Oct 15, 2025 | Completed: Period of performance ended Oct 15, 2025 |
FA301624F0315 under FA890317D0020 RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR… | Department of Defense · Department of the Air Force | 236220 · Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS | $971.7K | Sep 16, 2024 – Oct 9, 2025 | Completed: Period of performance ended Oct 9, 2025 |
FA303024F0043 under FA890317D0020 REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY… | Department of Defense · Department of the Air Force | 236220 · Z1FCMAINTENANCE OF TROOP HOUSING FACILITIES | $1M | Sep 20, 2024 – Aug 22, 2025 | Completed: Period of performance ended Aug 22, 2025 |
FA301623F0358 under FA890317D0020 REPLACE AIRFIELD LIGHTING (ALSF-1) AND (ALCMS-1) RANDOLPH, TX. | Department of Defense · Department of the Air Force | 236220 · Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS | $3.3M | Jul 28, 2023 – May 30, 2025 | Completed: Period of performance ended May 30, 2025 |
FA460024F0212 under FA890317D0020 REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $703.5K | Sep 26, 2024 – May 27, 2025 | Completed: Period of performance ended May 27, 2025 |
FA301622F0437 under FA890317D0020 REPAIR OF CONFINEMENT FACILITY - CHAPMAN ANNEX, JBSA TX | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $3.5M | Aug 9, 2022 – Apr 16, 2025 | Completed: Period of performance ended Apr 16, 2025 |
FA890322F0127 under FA890317D0020 CONSTRUCTION OF APRON A AT KIRTLAND AFB | Department of Defense · Department of the Air Force | 236220 · Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS | $15.5M | Sep 16, 2022 – Apr 2, 2025 | Completed: Period of performance ended Apr 2, 2025 |
FA301622F0401 under FA890317D0020 REPAIR HVAC B.5450 AND B.5460 | Department of Defense · Department of the Air Force | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $3.7M | Jul 26, 2022 – Feb 22, 2025 | Completed: Period of performance ended Feb 22, 2025 |
FA890322F0045 under FA890317D0020 RECONSTRUCT MAIN OPERATION APRON, CANNON AFB, NM. PROJECT #CZQZ1067057 | Department of Defense · Department of the Air Force | 236220 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $9.7M | Apr 7, 2022 – Dec 18, 2024 | Completed: Period of performance ended Dec 18, 2024 |
FA805122F0053 under FA890317D0020 MCCONNELL AFB AMRS | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $2.8M | Sep 29, 2022 – Oct 15, 2024 | Completed: Period of performance ended Oct 15, 2024 |
FA890323F0140 under FA890317D0020 DESIGN AND CONSTRUCTION FOR SECURITY FENCE AROUND MAIN RAMP AT EBBING FIELD, FT SMITH, AR. | Department of Defense · Department of the Air Force | 236220 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $700.9K | Oct 3, 2023 – Aug 12, 2024 | Completed: Period of performance ended Aug 12, 2024 |
FA805121F0043 under FA890317D0020 SHAW AFB ADVANCED METER READING SYSTEM (AMRS) | Department of Defense · Department of the Air Force | 236220 · R499SUPPORT- PROFESSIONAL: OTHER | $1.6M | Jul 30, 2021 – Aug 2, 2024 | Completed: Period of performance ended Aug 2, 2024 |
FA303023F0081 under FA890317D0020 REPAIR APACHE TRAIL - GOODFELLOW AFB | Department of Defense · Department of the Air Force | 236220 · Z1FCMAINTENANCE OF TROOP HOUSING FACILITIES | $727.8K | Sep 29, 2023 – Jun 3, 2024 | Completed: Period of performance ended Jun 3, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimarySmall business under this code’s size standard
- 212321Title not in the curated listSmall business under this code’s size standard
- 212322Title not in the curated listSmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237120Oil and Gas Pipeline and Related Structures ConstructionSmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 237310Highway, Street, and Bridge ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 238160Roofing ContractorsSmall business under this code’s size standard
- 238190Other Foundation, Structure, and Building Exterior ContractorsSmall business under this code’s size standard
- 238210Electrical Contractors and Other Wiring Installation ContractorsSmall business under this code’s size standard
- 238220Plumbing, Heating, and Air-Conditioning ContractorsSmall business under this code’s size standard
- 238910Site Preparation ContractorsSmall business under this code’s size standard
- 238990All Other Specialty Trade Contractors
- 561210Facilities Support ServicesSmall business under this code’s size standard
- 561990All Other Support ServicesSmall business under this code’s size standard
- 811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceSmall business under this code’s size standard
SAM.gov reports this entity as small under 16 of 18 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
- F021NATURAL RESOURCES/CONSERVATION- SITE PREPARATION
- Y1AZCONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
- Y1BECONSTRUCTION OF AIRPORT TERMINALS
- Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES
- Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS
- Y1FACONSTRUCTION OF FAMILY HOUSING FACILITIES
- Y1FBCONSTRUCTION OF RECREATIONAL BUILDINGS
- Y1FCCONSTRUCTION OF TROOP HOUSING FACILITIES
- Y1GDCONSTRUCTION OF OPEN STORAGE FACILITIES
- Y1KZCONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- Y1PACONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
- Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS
- Z2BZREPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES
- Z2CAREPAIR OR ALTERATION OF SCHOOLS
- Z2CZREPAIR OR ALTERATION OF OTHER EDUCATIONAL BUILDINGS
- Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
- Z2DBREPAIR OR ALTERATION OF LABORATORIES AND CLINICS
- Z2DZREPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS
- Z2EBREPAIR OR ALTERATION OF MAINTENANCE BUILDINGS
- Z2FAREPAIR OR ALTERATION OF FAMILY HOUSING FACILITIES
- Z2FBREPAIR OR ALTERATION OF RECREATIONAL BUILDINGS
- Z2FCREPAIR OR ALTERATION OF TROOP HOUSING FACILITIES
- Z2FDREPAIR OR ALTERATION OF DINING FACILITIES
- Z2FEREPAIR OR ALTERATION OF RELIGIOUS FACILITIES
- Z2FZREPAIR OR ALTERATION OF OTHER RESIDENTIAL BUILDINGS
- Z2GZREPAIR OR ALTERATION OF OTHER WAREHOUSE BUILDINGS
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 12, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with MOWA-BARLOVENTO JOINT VENTURE A?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
