WHELCON CONTRACTORS LLC
- TUCSON, AZ 85705-0603
- whelcon.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Small Disadvantaged Business
Registration and small-business types: SAM.gov, synced Nov 13, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $34.9M
- Awards on record
- 12
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
WHELCON CONTRACTORS LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About WHELCON CONTRACTORS LLC
- Headquarters
- TUCSON, AZ 85705-0603
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEICAJHDXWX86H5
- CAGE865R9
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $34.9M
- Awards on record
- 12
- Top funding agencies
- Federal Highway Administration · Forest Service · Bureau of Land Management
Awards
127EAX26P0007
Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)GIBBS WASH BRIDGE REPLACEMENT, CORONADO NATIONAL FOREST.
Department of Agriculture · Forest Service
- Obligated
- $1.3M
- Period of performance
- Oct 1, 2026 – Jun 14, 2027
6982AF26C000003
Recompete < 6 mo: Potential end Dec 15, 2026 (1 month away)NM FS 220(1) ROMERO CREEK BRIDGE - THE PURPOSE OF THIS CONTRACT IS CONSTRUCTION AND REPLACEMENT OF A BRIDGE.
Department of Transportation · Federal Highway Administration
- Obligated
- $1.6M
- Period of performance
- Nov 3, 2025 – Dec 15, 2026
6982AF26C000011
Completed: Period of performance ended Oct 14, 2026AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT - CONSTRUCTION CONTRACT
Department of Transportation · Federal Highway Administration
- Obligated
- $4.2M
- Period of performance
- Jan 16, 2026 – Oct 14, 2026
W911SA25FA279
Completed: Period of performance ended Sep 30, 2026AZ034 REGION 3 MATOC MIN GUARANTEE
Department of Defense · Department of the Army
- Obligated
- $2K
- Period of performance
- Sep 30, 2025 – Sep 30, 2026
6982AF25C000021
Completed: Period of performance ended Jun 20, 2026NV FLAP 500(1) RED ROCK TRAIL CONSTRUCTION PROJECT INCLUDING SHARED USE PATH, ROAD RECONDITIONING, PARKING AREAS, AND DRAINAGE.
Department of Transportation · Federal Highway Administration
- Obligated
- $10.1M
- Period of performance
- Apr 29, 2025 – Jun 20, 2026
6982AF25C000023
Completed: Period of performance ended Jun 13, 2026NM BR AAO ELBU(1). THE PROJECT WILL USE ASPHALT AND AGGREGATE BASE TO RESURFACE, RESTORE, AND REHABILITATE MULTIPLE ROAD SEGMENTS WITHIN…
Department of Transportation · Federal Highway Administration
- Obligated
- $7.8M
- Period of performance
- Apr 15, 2025 – Jun 13, 2026
140L0624C0017
Completed: Period of performance ended May 14, 2025GILA BOX GAOA BONITA CREEK ROAD REPAIR
Department of the Interior · Bureau of Land Management
- Obligated
- $805.5K
- Period of performance
- Aug 26, 2024 – May 14, 2025
127EAX23F0019
Completed: Period of performance ended Dec 31, 2024SABINO CANYON TRAM ROAD PAVING
Department of Agriculture · Forest Service
- Obligated
- $170.1K
- Period of performance
- Oct 1, 2023 – Dec 31, 2024
6982AF24C000010
Completed: Period of performance ended Jun 26, 2024CONSTRUCTION CONTRACT FOR AZ FLAP 202(3) RED CLOUD MINE ROAD. ROAD CONSTRUCTION.
Department of Transportation · Federal Highway Administration
- Obligated
- $2.9M
- Period of performance
- Feb 1, 2024 – Jun 26, 2024
127EAX23F0004
Completed: Period of performance ended Apr 12, 2024LRT PROJECT TO IMPROVE DRAINAGE IN DOUGLAS RANGER DISTRICT
Department of Agriculture · Forest Service
- Obligated
- $109.3K
- Period of performance
- May 15, 2023 – Apr 12, 2024
6982AF23C000049
Completed: Period of performance ended Feb 9, 2024CA ERFO NP DEVA 2023-3(1) STORM REPAIRS CONSTRUCTION OF EMERGENCY REPAIRS ON MULTIPLE ROUTES
Department of Transportation · Federal Highway Administration
- Obligated
- $5.9M
- Period of performance
- Sep 28, 2023 – Feb 9, 2024
6982AF23C000015
Completed: Period of performance ended Sep 15, 2023NM FTFS 233(1) TULAROSA AOP IMPROVEMENTS
Department of Transportation · Federal Highway Administration
- Obligated
- $1.3M
- Period of performance
- Jan 23, 2023 – Sep 15, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
127EAX26P0007 GIBBS WASH BRIDGE REPLACEMENT, CORONADO NATIONAL FOREST. | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.3M | Oct 1, 2026 – Jun 14, 2027 | Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)AI brief for award 127EAX26P0007Bid team for the recompete of award 127EAX26P0007 |
6982AF26C000003 NM FS 220(1) ROMERO CREEK BRIDGE - THE PURPOSE OF THIS CONTRACT IS CONSTRUCTION AND REPLACEMENT OF A BRIDGE. | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.6M | Nov 3, 2025 – Dec 15, 2026 | Recompete < 6 mo: Potential end Dec 15, 2026 (1 month away)AI brief for award 6982AF26C000003Bid team for the recompete of award 6982AF26C000003 |
6982AF26C000011 AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT - CONSTRUCTION CONTRACT | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $4.2M | Jan 16, 2026 – Oct 14, 2026 | Completed: Period of performance ended Oct 14, 2026 |
W911SA25FA279 under W911SA25DA019 AZ034 REGION 3 MATOC MIN GUARANTEE | Department of Defense · Department of the Army | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $2K | Sep 30, 2025 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
6982AF25C000021 NV FLAP 500(1) RED ROCK TRAIL CONSTRUCTION PROJECT INCLUDING SHARED USE PATH, ROAD RECONDITIONING, PARKING AREAS, AND DRAINAGE. | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $10.1M | Apr 29, 2025 – Jun 20, 2026 | Completed: Period of performance ended Jun 20, 2026 |
6982AF25C000023 NM BR AAO ELBU(1). THE PROJECT WILL USE ASPHALT AND AGGREGATE BASE TO RESURFACE, RESTORE, AND REHABILITATE MULTIPLE ROAD SEGMENTS WITHIN… | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $7.8M | Apr 15, 2025 – Jun 13, 2026 | Completed: Period of performance ended Jun 13, 2026 |
140L0624C0017 GILA BOX GAOA BONITA CREEK ROAD REPAIR | Department of the Interior · Bureau of Land Management | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $805.5K | Aug 26, 2024 – May 14, 2025 | Completed: Period of performance ended May 14, 2025 |
127EAX23F0019 under 12837119D0026 SABINO CANYON TRAM ROAD PAVING | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $170.1K | Oct 1, 2023 – Dec 31, 2024 | Completed: Period of performance ended Dec 31, 2024 |
6982AF24C000010 CONSTRUCTION CONTRACT FOR AZ FLAP 202(3) RED CLOUD MINE ROAD. ROAD CONSTRUCTION. | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $2.9M | Feb 1, 2024 – Jun 26, 2024 | Completed: Period of performance ended Jun 26, 2024 |
127EAX23F0004 under 12837119D0026 LRT PROJECT TO IMPROVE DRAINAGE IN DOUGLAS RANGER DISTRICT | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $109.3K | May 15, 2023 – Apr 12, 2024 | Completed: Period of performance ended Apr 12, 2024 |
6982AF23C000049 CA ERFO NP DEVA 2023-3(1) STORM REPAIRS CONSTRUCTION OF EMERGENCY REPAIRS ON MULTIPLE ROUTES | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $5.9M | Sep 28, 2023 – Feb 9, 2024 | Completed: Period of performance ended Feb 9, 2024 |
6982AF23C000015 NM FTFS 233(1) TULAROSA AOP IMPROVEMENTS | Department of Transportation · Federal Highway Administration | 237990 · Y1PCCONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND) | $1.3M | Jan 23, 2023 – Sep 15, 2023 | Completed: Period of performance ended Sep 15, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237310Highway, Street, and Bridge ConstructionPrimarySmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 238110Poured Concrete Foundation and Structure Contractors
- 238140Title not in the curated list
- 238910Site Preparation Contractors
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 212313Title not in the curated listSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237210Title not in the curated listSmall business under this code’s size standard
- 212319Title not in the curated listSmall business under this code’s size standard
- 812930Title not in the curated listSmall business under this code’s size standard
- 561210Facilities Support ServicesSmall business under this code’s size standard
- 212321Title not in the curated listSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering ConstructionSmall business under this code’s size standard
- 238120Structural Steel and Precast Concrete Contractors
SAM.gov reports this entity as small under 11 of 16 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 13, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with WHELCON CONTRACTORS LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
