TRITON MARINE CONSTRUCTION CORP.
Doing business as TRITON MARINE CONSTRUCTION CORP
- BREMERTON, WA 98312-4942
- tritonmarine.us (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $93.9M
- Awards on record
- 17
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
TRITON MARINE CONSTRUCTION CORP. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About TRITON MARINE CONSTRUCTION CORP.
- Headquarters
- BREMERTON, WA 98312-4942
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEICCCHALNKQKV9
- CAGE0C5S4
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $93.9M
- Awards on record
- 17
- Top funding agencies
- Department of the Navy
Awards
N4425525F4009
Recompete 12–18 mo: Potential end Mar 30, 2028 (16 months away)N4425521D5008 / N4425525F4009 RM21-0787 EXPLOSIVE HANDLING WHARF 1 (EHW1) ELECTRICAL REFURBISHMENT, NBK BANGOR, SILVERDALE, WA
Department of Defense · Department of the Navy
- Obligated
- $13.8M
- Period of performance
- Dec 11, 2024 – Mar 30, 2028
N4425525F0063
Recompete 6–12 mo: Potential end May 26, 2027 (6 months away)DESIGN-BID-BUILD PROJECT TO REPAIR SMALL CRAFT REFUELING AT OLYMPIC PIER, BANGOR
Department of Defense · Department of the Navy
- Obligated
- $4.8M
- Period of performance
- May 21, 2025 – May 26, 2027
N4425524F4425
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AMMO PIER UTILITY REPAIRS AND REPLACEMENTS AT NAVAL MAGAZINE INDIAN ISLAND.
Department of Defense · Department of the Navy
- Obligated
- $3.8M
- Period of performance
- Sep 25, 2024 – Apr 30, 2027
N4425525F0240
Completed: Period of performance ended Sep 9, 2026THIS TASK ORDER IS TO REPLACE THE EXISTING GATE, FRAME, THIMBLE AND OPERATOR OF SLUICE GATE #3 IN PUMPWELL #5 OF DD5 AT PSNS.
Department of Defense · Department of the Navy
- Obligated
- $1.6M
- Period of performance
- Sep 9, 2025 – Sep 9, 2026
N4425526F0073
Completed: Period of performance ended Sep 2, 2026OVERHAUL, RESTORE, AND REPAIR MARGINAL WHARF SOUTH SHORE POWER BOOMS.
Department of Defense · Department of the Navy
- Obligated
- $887.5K
- Period of performance
- Feb 19, 2026 – Sep 2, 2026
N4425523F4274
Completed: Period of performance ended Aug 25, 2026REPAIR EAST FLOODGATE, B705, PSNS
Department of Defense · Department of the Navy
- Obligated
- $1.7M
- Period of performance
- Apr 22, 2024 – Aug 25, 2026
N4425524F4341
Completed: Period of performance ended Aug 19, 2026REPAIR EXISTING DELTA SOUTH INBOARD FWD SHORE POWER TRANSFORMER, DELTA PIER, NAVAL BASE KITSAP, BANGOR, WASHINGTON
Department of Defense · Department of the Navy
- Obligated
- $632.5K
- Period of performance
- Sep 4, 2024 – Aug 19, 2026
N4425525F4106
Completed: Period of performance ended Mar 30, 2026WATERFRONT MULTI-AWARD CONST. CONTRACT
Department of Defense · Department of the Navy
- Obligated
- $9M
- Period of performance
- Mar 13, 2025 – Mar 30, 2026
N4425525F4109
Completed: Period of performance ended Mar 13, 2026WATERFRONT MULTI-AWARD CONST. CONTRACT
Department of Defense · Department of the Navy
- Obligated
- $1.4M
- Period of performance
- Mar 13, 2025 – Mar 13, 2026
N4425525F4019
Completed: Period of performance ended Dec 15, 2025WATERFRONT MULTI-AWARD CONST. CONTRACT SALTWATER SYSTEM PIER 3 EAST
Department of Defense · Department of the Navy
- Obligated
- $3.9M
- Period of performance
- Dec 5, 2024 – Dec 15, 2025
N4425525F4028
Completed: Period of performance ended Mar 27, 2025REPLACE FUEL LINE
Department of Defense · Department of the Navy
- Obligated
- $386.6K
- Period of performance
- Dec 12, 2024 – Mar 27, 2025
N4425524F4032
Completed: Period of performance ended Jan 21, 2025X007 SWING MSR# 16305359, INSTALL DRAINAGE PUMP CONTROLLER FOR P
Department of Defense · Department of the Navy
- Obligated
- $3.2M
- Period of performance
- Nov 16, 2023 – Jan 21, 2025
N4425519F4178
Completed: Period of performance ended Nov 12, 2024REPAIR SALTWATER DIST / COMPRESSED AIR VARIOUS
Department of Defense · Department of the Navy
- Obligated
- $4.3M
- Period of performance
- May 9, 2018 – Nov 12, 2024
N4425523F4247
Completed: Period of performance ended Oct 15, 2024REPAIR SALTWATER DISTRIBUTION & COMPRESSED AIR
Department of Defense · Department of the Navy
- Obligated
- $8.7M
- Period of performance
- Mar 28, 2023 – Oct 15, 2024
N4425523F4213
Completed: Period of performance ended Sep 9, 2024REPLACE CRITICAL STRUCTURE PILES, EHW-1, B/7501, BANGOR (PHA
Department of Defense · Department of the Navy
- Obligated
- $7.7M
- Period of performance
- Feb 28, 2023 – Sep 9, 2024
N4425523F4298
Completed: Period of performance ended Jul 30, 2024REPAIR GROUNDWATER RELIEF SYSTEM, DD6
Department of Defense · Department of the Navy
- Obligated
- $5.4M
- Period of performance
- Feb 12, 2024 – Jul 30, 2024
N6247820C4001
Completed: Period of performance ended Apr 27, 2024RM17-1369 HOTEL PIER REPAIRS AT JBPHH, HAWAII
Department of Defense · Department of the Navy
- Obligated
- $22.9M
- Period of performance
- Mar 26, 2020 – Apr 27, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
N4425525F4009 under N4425521D5008 N4425521D5008 / N4425525F4009 RM21-0787 EXPLOSIVE HANDLING WHARF 1 (EHW1) ELECTRICAL REFURBISHMENT, NBK BANGOR, SILVERDALE, WA | Department of Defense · Department of the Navy | 237990 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $13.8M | Dec 11, 2024 – Mar 30, 2028 | Recompete 12–18 mo: Potential end Mar 30, 2028 (16 months away)AI brief for award N4425525F4009Bid team for the recompete of award N4425525F4009 |
N4425525F0063 under N4425521D5008 DESIGN-BID-BUILD PROJECT TO REPAIR SMALL CRAFT REFUELING AT OLYMPIC PIER, BANGOR | Department of Defense · Department of the Navy | 237990 · Z2NAREPAIR OR ALTERATION OF FUEL SUPPLY FACILITIES | $4.8M | May 21, 2025 – May 26, 2027 | Recompete 6–12 mo: Potential end May 26, 2027 (6 months away)AI brief for award N4425525F0063Bid team for the recompete of award N4425525F0063 |
N4425524F4425 under N4425521D5008 AMMO PIER UTILITY REPAIRS AND REPLACEMENTS AT NAVAL MAGAZINE INDIAN ISLAND. | Department of Defense · Department of the Navy | 237990 · Z2EAREPAIR OR ALTERATION OF AMMUNITION FACILITIES | $3.8M | Sep 25, 2024 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award N4425524F4425Bid team for the recompete of award N4425524F4425 |
N4425525F0240 under N4425521D5008 THIS TASK ORDER IS TO REPLACE THE EXISTING GATE, FRAME, THIMBLE AND OPERATOR OF SLUICE GATE #3 IN PUMPWELL #5 OF DD5 AT PSNS. | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $1.6M | Sep 9, 2025 – Sep 9, 2026 | Completed: Period of performance ended Sep 9, 2026 |
N4425526F0073 under N4425521D5008 OVERHAUL, RESTORE, AND REPAIR MARGINAL WHARF SOUTH SHORE POWER BOOMS. | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $887.5K | Feb 19, 2026 – Sep 2, 2026 | Completed: Period of performance ended Sep 2, 2026 |
N4425523F4274 under N4425521D5008 REPAIR EAST FLOODGATE, B705, PSNS | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $1.7M | Apr 22, 2024 – Aug 25, 2026 | Completed: Period of performance ended Aug 25, 2026 |
N4425524F4341 under N4425521D5008 REPAIR EXISTING DELTA SOUTH INBOARD FWD SHORE POWER TRANSFORMER, DELTA PIER, NAVAL BASE KITSAP, BANGOR, WASHINGTON | Department of Defense · Department of the Navy | 237990 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $632.5K | Sep 4, 2024 – Aug 19, 2026 | Completed: Period of performance ended Aug 19, 2026 |
N4425525F4106 under N4425521D5008 WATERFRONT MULTI-AWARD CONST. CONTRACT | Department of Defense · Department of the Navy | 237990 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $9M | Mar 13, 2025 – Mar 30, 2026 | Completed: Period of performance ended Mar 30, 2026 |
N4425525F4109 under N4425521D5008 WATERFRONT MULTI-AWARD CONST. CONTRACT | Department of Defense · Department of the Navy | 237990 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $1.4M | Mar 13, 2025 – Mar 13, 2026 | Completed: Period of performance ended Mar 13, 2026 |
N4425525F4019 under N4425521D5008 WATERFRONT MULTI-AWARD CONST. CONTRACT SALTWATER SYSTEM PIER 3 EAST | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $3.9M | Dec 5, 2024 – Dec 15, 2025 | Completed: Period of performance ended Dec 15, 2025 |
N4425525F4028 under N4425521D5008 REPLACE FUEL LINE | Department of Defense · Department of the Navy | 237990 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $386.6K | Dec 12, 2024 – Mar 27, 2025 | Completed: Period of performance ended Mar 27, 2025 |
N4425524F4032 under N4425521D5008 X007 SWING MSR# 16305359, INSTALL DRAINAGE PUMP CONTROLLER FOR P | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $3.2M | Nov 16, 2023 – Jan 21, 2025 | Completed: Period of performance ended Jan 21, 2025 |
N4425519F4178 under N4425514D9007 REPAIR SALTWATER DIST / COMPRESSED AIR VARIOUS | Department of Defense · Department of the Navy | 237990 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $4.3M | May 9, 2018 – Nov 12, 2024 | Completed: Period of performance ended Nov 12, 2024 |
N4425523F4247 under N4425521D5008 REPAIR SALTWATER DISTRIBUTION & COMPRESSED AIR | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $8.7M | Mar 28, 2023 – Oct 15, 2024 | Completed: Period of performance ended Oct 15, 2024 |
N4425523F4213 under N4425521D5008 REPLACE CRITICAL STRUCTURE PILES, EHW-1, B/7501, BANGOR (PHA | Department of Defense · Department of the Navy | 237990 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $7.7M | Feb 28, 2023 – Sep 9, 2024 | Completed: Period of performance ended Sep 9, 2024 |
N4425523F4298 under N4425521D5008 REPAIR GROUNDWATER RELIEF SYSTEM, DD6 | Department of Defense · Department of the Navy | 237990 · Z2EDREPAIR OR ALTERATION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $5.4M | Feb 12, 2024 – Jul 30, 2024 | Completed: Period of performance ended Jul 30, 2024 |
N6247820C4001 RM17-1369 HOTEL PIER REPAIRS AT JBPHH, HAWAII | Department of Defense · Department of the Navy | 237990 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $22.9M | Mar 26, 2020 – Apr 27, 2024 | Completed: Period of performance ended Apr 27, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237990Other Heavy and Civil Engineering ConstructionPrimary
- 221310Title not in the curated list
- 236210Industrial Building Construction
- 236220Commercial and Institutional Building Construction
- 237110Water and Sewer Line and Related Structures Construction
- 237120Oil and Gas Pipeline and Related Structures Construction
- 237130Power and Communication Line and Related Structures Construction
- 237210Title not in the curated list
- 237310Highway, Street, and Bridge Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238130Title not in the curated list
- 238190Other Foundation, Structure, and Building Exterior Contractors
- 238350Finish Carpentry Contractors
- 238390Other Building Finishing Contractors
- 238910Site Preparation Contractors
- 488310Port and Harbor Operations
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with TRITON MARINE CONSTRUCTION CORP.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
