HORIZON CONSTRUCTION GROUP\INTERNATIONAL CONSTRUCTION SERVICES JV, LLC
- MEMPHIS, TN 38133
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Women-Owned Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $58M
- Awards on record
- 23
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
HORIZON CONSTRUCTION GROUP\INTERNATIONAL CONSTRUCTION SERVICES JV, LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About HORIZON CONSTRUCTION GROUP\INTERNATIONAL CONSTRUCTION SERVICES JV, LLC
- Headquarters
- MEMPHIS, TN 38133
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEICM7KWNM88RQ7
- CAGE738J3
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $58M
- Awards on record
- 23
- Top funding agencies
- Department of State
Awards
19AQMM26F1334
Recompete 18+ mo: Potential end May 31, 2028 (18 months away)DESIGN-BUILD SERVICES FOR FIRE ALARM SYSTEM REPLACEMENT KIGALI, RWANDA
Department of State
- Obligated
- $1.7M
- Period of performance
- Oct 1, 2026 – May 31, 2028
19AQMM25F0585
Recompete 6–12 mo: Potential end Aug 13, 2027 (9 months away)POWER PLANT ELECTRICAL EQUIPMENT RENOVATION REPLACEMENT (PPEERR) FOR US EMBASSY HAVANA, CUBA
Department of State
- Obligated
- $10M
- Period of performance
- Apr 15, 2025 – Aug 13, 2027
19AQMM18F3368
Recompete 6–12 mo: Potential end Jul 17, 2027 (8 months away)WASTEWATER LINE AND STORM DRAIN REPAIR - MANAAMA BAHRAIN
Department of State
- Obligated
- $1.5M
- Period of performance
- Sep 14, 2018 – Jul 17, 2027
19AQMM26F0696
Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)CAA - FREETOWN
Department of State
- Obligated
- $638.5K
- Period of performance
- May 29, 2026 – Jun 30, 2027
19AQMM23F2980
Recompete < 6 mo: Potential end May 1, 2027 (5 months away)SPACE RENOVATION US EMBASSY HAVANA CUBA
Department of State
- Obligated
- $1.2M
- Period of performance
- Sep 22, 2023 – May 1, 2027
19AQMM25F0380
Recompete < 6 mo: Potential end Apr 22, 2027 (5 months away)FIRE ALARM REPLECEMENT
Department of State
- Obligated
- $679.4K
- Period of performance
- Apr 14, 2025 – Apr 22, 2027
19AQMM19F4487
Recompete < 6 mo: Potential end Dec 15, 2026 (1 month away)DESIGN BUILD CONSTRUCTION FOR PCC RELOCATION US EMBASSY ASMARA ERITREA
Department of State
- Obligated
- $2.5M
- Period of performance
- Sep 27, 2019 – Dec 15, 2026
19AQMM22F3952
Completed: Period of performance ended Nov 9, 2026REPAIR HVAC CHILLER IN CONAKRY, GUNIEA
Department of State
- Obligated
- $3.6M
- Period of performance
- Sep 30, 2022 – Nov 9, 2026
19AQMM26P1262
Completed: Period of performance ended Oct 31, 2026PURCHASE ORDER TO COMPENSATE TECHNICALLY ACCEPTABLE NON-WINNING OFFERORS FOR THE MANAGUA FIRE ALARM SITE VISIT
Department of State
- Obligated
- $10K
- Period of performance
- Sep 18, 2026 – Oct 31, 2026
19AQMM18F3003
Completed: Period of performance ended Oct 31, 2026DESIGN BUILD SERVICES TO CONVERT SPACE TO A READING ROOM IN DHAKA, BANGLADESH.
Department of State
- Obligated
- $487.8K
- Period of performance
- Aug 31, 2018 – Oct 31, 2026
19AQMM22F4015
Completed: Period of performance ended Aug 31, 2026REPLACE AIR COOLED CHILLERS AT US EMBASSY IN FREETOWN, SIERRA LEONE
Department of State
- Obligated
- $5.7M
- Period of performance
- Oct 1, 2022 – Aug 31, 2026
19AQMM19F3132
Completed: Period of performance ended Mar 30, 2026POC IS JOHN BURBA PLEASE DIRECT TO CONTRACT OFFICER JAMES WAGGONER APPROVAL FLOW EDIT: SALLY E. LOVETT ADDED BY ALYSON F. DAVIDOW ON MON…
Department of State
- Obligated
- $63.8K
- Period of performance
- Sep 3, 2019 – Mar 30, 2026
19AQMM21F3742
Completed: Period of performance ended Feb 26, 2026POST KAMPALA - PCC GENERATOR
Department of State
- Obligated
- $418.4K
- Period of performance
- Sep 9, 2021 – Feb 26, 2026
19AQMM19F3127
Completed: Period of performance ended Dec 31, 2025POC IS JOHN BURBA PLEASE DIRECT TO CO JAMES WAGGONER APPROVAL FLOW EDIT: SALLY E. LOVETT ADDED BY ALYSON F. DAVIDOW ON TUE FEB 12 05:51:27…
Department of State
- Obligated
- $29.3K
- Period of performance
- Sep 3, 2019 – Dec 31, 2025
19AQMM23F3092
Completed: Period of performance ended Oct 29, 2025HVAC/CHILLER EQUIPMENT REPLACEMENT US EMBASSY DAKAR SENEGAL
Department of State
- Obligated
- $3.6M
- Period of performance
- Sep 26, 2023 – Oct 29, 2025
19AQMM23F2759
Completed: Period of performance ended Jul 1, 2025NEW TASK ORDER FOR WALL REPLACEMENT AT THE HARARE EMBASSAY
Department of State
- Obligated
- $806.4K
- Period of performance
- Sep 13, 2023 – Jul 1, 2025
19AQMM23F1544
Completed: Period of performance ended May 5, 2025---------- COMMENTS: RFCA DOCUMENTATION IS UPLOADED THIS REQUIRES A RFCA BEFORE APPROVING IN ARIBA. PLEASE ATTACH. OK ATTN ALLA WEINSTEIN…
Department of State
- Obligated
- $1.5M
- Period of performance
- Aug 1, 2023 – May 5, 2025
19AQMM18F2931
Completed: Period of performance ended Dec 31, 2024ARB60 PROJECT FOR CLASSIFIED WORK AT THE U.S. EMBASSY IN KHARTOUM, SUDAN
Department of State
- Obligated
- $178.2K
- Period of performance
- Aug 28, 2018 – Dec 31, 2024
19AQMM19F3850
Completed: Period of performance ended Nov 30, 2024THE OVERSEAS BUILDINGS OPERATIONS REQUIRES DESIGN BUILD SERVICES, TO DESIGN AND INSTALL INTERIOR ELECTRICAL AND IT WIRING SYSTEM ADDITIONS…
Department of State
- Obligated
- $260.4K
- Period of performance
- Sep 20, 2019 – Nov 30, 2024
19AQMM22F1478
Completed: Period of performance ended Sep 30, 2024CHILLER REPLACEMENT PROJECT
Department of State
- Obligated
- $4.9M
- Period of performance
- Mar 23, 2022 – Sep 30, 2024
19AQMM20F1818
Completed: Period of performance ended Sep 30, 2024CONSTRUCTION AWARD FOR PARIS EMBASSY SECURITY PERIMETER UPGRADE.
Department of State
- Obligated
- $18.2M
- Period of performance
- May 19, 2020 – Sep 30, 2024
19AQMM18F5012
Completed: Period of performance ended Jun 1, 2022DESIGN/BUILD SERVICES FOR PLUMBING REPLACEMENTS AT THE U.S. EMBASSY LUXEMBOURG IN LUXEMBOURG.
Department of State
- Obligated
- $2.2M
- Period of performance
- Sep 28, 2018 – Jun 1, 2022
19AQMM19F0678
Completed: Period of performance ended Feb 25, 2022THE PURPOSE OF THIS TASK ORDER IS TO RENOVATE A MARINE SECURITY GUARD RESIDENCE.
Department of State
- Obligated
- $6.4M
- Period of performance
- Mar 13, 2019 – Feb 25, 2022
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
19AQMM26F1334 under 19AQMM22D0063 DESIGN-BUILD SERVICES FOR FIRE ALARM SYSTEM REPLACEMENT KIGALI, RWANDA | Department of State | 236220 · J012MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT | $1.7M | Oct 1, 2026 – May 31, 2028 | Recompete 18+ mo: Potential end May 31, 2028 (18 months away) |
19AQMM25F0585 under 19AQMM22D0063 POWER PLANT ELECTRICAL EQUIPMENT RENOVATION REPLACEMENT (PPEERR) FOR US EMBASSY HAVANA, CUBA | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $10M | Apr 15, 2025 – Aug 13, 2027 | Recompete 6–12 mo: Potential end Aug 13, 2027 (9 months away)AI brief for award 19AQMM25F0585Bid team for the recompete of award 19AQMM25F0585 |
19AQMM18F3368 under SAQMMA14D0056 WASTEWATER LINE AND STORM DRAIN REPAIR - MANAAMA BAHRAIN | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $1.5M | Sep 14, 2018 – Jul 17, 2027 | Recompete 6–12 mo: Potential end Jul 17, 2027 (8 months away)AI brief for award 19AQMM18F3368Bid team for the recompete of award 19AQMM18F3368 |
19AQMM26F0696 under 19AQMM22D0063 CAA - FREETOWN | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $638.5K | May 29, 2026 – Jun 30, 2027 | Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AI brief for award 19AQMM26F0696Bid team for the recompete of award 19AQMM26F0696 |
19AQMM23F2980 under 19AQMM22D0063 SPACE RENOVATION US EMBASSY HAVANA CUBA | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $1.2M | Sep 22, 2023 – May 1, 2027 | Recompete < 6 mo: Potential end May 1, 2027 (5 months away)AI brief for award 19AQMM23F2980Bid team for the recompete of award 19AQMM23F2980 |
19AQMM25F0380 under 19AQMM22D0063 FIRE ALARM REPLECEMENT | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $679.4K | Apr 14, 2025 – Apr 22, 2027 | Recompete < 6 mo: Potential end Apr 22, 2027 (5 months away)AI brief for award 19AQMM25F0380Bid team for the recompete of award 19AQMM25F0380 |
19AQMM19F4487 under SAQMMA14D0056 DESIGN BUILD CONSTRUCTION FOR PCC RELOCATION US EMBASSY ASMARA ERITREA | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $2.5M | Sep 27, 2019 – Dec 15, 2026 | Recompete < 6 mo: Potential end Dec 15, 2026 (1 month away)AI brief for award 19AQMM19F4487Bid team for the recompete of award 19AQMM19F4487 |
19AQMM22F3952 under 19AQMM22D0063 REPAIR HVAC CHILLER IN CONAKRY, GUNIEA | Department of State | 236220 · J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $3.6M | Sep 30, 2022 – Nov 9, 2026 | Completed: Period of performance ended Nov 9, 2026 |
19AQMM26P1262 PURCHASE ORDER TO COMPENSATE TECHNICALLY ACCEPTABLE NON-WINNING OFFERORS FOR THE MANAGUA FIRE ALARM SITE VISIT | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $10K | Sep 18, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
19AQMM18F3003 under SAQMMA14D0056 DESIGN BUILD SERVICES TO CONVERT SPACE TO A READING ROOM IN DHAKA, BANGLADESH. | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $487.8K | Aug 31, 2018 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
19AQMM22F4015 under 19AQMM22D0063 REPLACE AIR COOLED CHILLERS AT US EMBASSY IN FREETOWN, SIERRA LEONE | Department of State | 236220 · J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $5.7M | Oct 1, 2022 – Aug 31, 2026 | Completed: Period of performance ended Aug 31, 2026 |
19AQMM19F3132 under SAQMMA14D0056 POC IS JOHN BURBA PLEASE DIRECT TO CONTRACT OFFICER JAMES WAGGONER APPROVAL FLOW EDIT: SALLY E. LOVETT ADDED BY ALYSON F. DAVIDOW ON MON… | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $63.8K | Sep 3, 2019 – Mar 30, 2026 | Completed: Period of performance ended Mar 30, 2026 |
19AQMM21F3742 under SAQMMA14D0056 POST KAMPALA - PCC GENERATOR | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $418.4K | Sep 9, 2021 – Feb 26, 2026 | Completed: Period of performance ended Feb 26, 2026 |
19AQMM19F3127 under SAQMMA14D0056 POC IS JOHN BURBA PLEASE DIRECT TO CO JAMES WAGGONER APPROVAL FLOW EDIT: SALLY E. LOVETT ADDED BY ALYSON F. DAVIDOW ON TUE FEB 12 05:51:27… | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $29.3K | Sep 3, 2019 – Dec 31, 2025 | Completed: Period of performance ended Dec 31, 2025 |
19AQMM23F3092 under 19AQMM22D0063 HVAC/CHILLER EQUIPMENT REPLACEMENT US EMBASSY DAKAR SENEGAL | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $3.6M | Sep 26, 2023 – Oct 29, 2025 | Completed: Period of performance ended Oct 29, 2025 |
19AQMM23F2759 under 19AQMM22D0063 NEW TASK ORDER FOR WALL REPLACEMENT AT THE HARARE EMBASSAY | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $806.4K | Sep 13, 2023 – Jul 1, 2025 | Completed: Period of performance ended Jul 1, 2025 |
19AQMM23F1544 under 19AQMM22D0063 ---------- COMMENTS: RFCA DOCUMENTATION IS UPLOADED THIS REQUIRES A RFCA BEFORE APPROVING IN ARIBA. PLEASE ATTACH. OK ATTN ALLA WEINSTEIN… | Department of State | 236220 · J012MAINT/REPAIR/REBUILD OF EQUIPMENT- FIRE CONTROL EQUIPMENT | $1.5M | Aug 1, 2023 – May 5, 2025 | Completed: Period of performance ended May 5, 2025 |
19AQMM18F2931 under SAQMMA14D0056 ARB60 PROJECT FOR CLASSIFIED WORK AT THE U.S. EMBASSY IN KHARTOUM, SUDAN | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $178.2K | Aug 28, 2018 – Dec 31, 2024 | Completed: Period of performance ended Dec 31, 2024 |
19AQMM19F3850 under SAQMMA14D0056 THE OVERSEAS BUILDINGS OPERATIONS REQUIRES DESIGN BUILD SERVICES, TO DESIGN AND INSTALL INTERIOR ELECTRICAL AND IT WIRING SYSTEM ADDITIONS… | Department of State | 236220 · C215ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $260.4K | Sep 20, 2019 – Nov 30, 2024 | Completed: Period of performance ended Nov 30, 2024 |
19AQMM22F1478 under SAQMMA14D0056 CHILLER REPLACEMENT PROJECT | Department of State | 236220 · J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $4.9M | Mar 23, 2022 – Sep 30, 2024 | Completed: Period of performance ended Sep 30, 2024 |
19AQMM20F1818 under SAQMMA14D0056 CONSTRUCTION AWARD FOR PARIS EMBASSY SECURITY PERIMETER UPGRADE. | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $18.2M | May 19, 2020 – Sep 30, 2024 | Completed: Period of performance ended Sep 30, 2024 |
19AQMM18F5012 under SAQMMA14D0056 DESIGN/BUILD SERVICES FOR PLUMBING REPLACEMENTS AT THE U.S. EMBASSY LUXEMBOURG IN LUXEMBOURG. | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $2.2M | Sep 28, 2018 – Jun 1, 2022 | Completed: Period of performance ended Jun 1, 2022 |
19AQMM19F0678 under SAQMMA14D0056 THE PURPOSE OF THIS TASK ORDER IS TO RENOVATE A MARINE SECURITY GUARD RESIDENCE. | Department of State | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $6.4M | Mar 13, 2019 – Feb 25, 2022 | Completed: Period of performance ended Feb 25, 2022 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimarySmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure ContractorsSmall business under this code’s size standard
- 238210Electrical Contractors and Other Wiring Installation ContractorsSmall business under this code’s size standard
- 238220Plumbing, Heating, and Air-Conditioning ContractorsSmall business under this code’s size standard
SAM.gov reports this entity as small under 6 of 7 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Self-represented in SAM.gov. WOSB and EDWOSB set-asides need SBA certification (13 CFR 127.300); SDVOSB and VOSB need SBA VetCert (13 CFR part 128). Confirm current certification before relying on it.
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with HORIZON CONSTRUCTION GROUP\INTERNATIONAL CONSTRUCTION SERVICES JV, LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
