
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Doing business as ENVIROTECH HEATING AND COOLING
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
SAM.gov registration expires in 34 days
JIM JAM, INC.’s registration expires on Dec 15, 2026. Renewal can take weeks; confirm it stays active through proposal submission and award.
View on SAM.gov (opens in a new tab)Learn more about SAM registration and the UEI
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Awards
140P6426C0017
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)EO 14398 - CONSTRUCTION, HEAT PUMP REPLACEMENT @ BRVB
Department of the Interior · National Park Service
W50S7G26CA003
Completed: Period of performance ended Jul 31, 2026WALK-IN FREEZER REFURB
Department of Defense · Department of the Army
697DCK25C00232
Completed: Period of performance ended Jul 17, 2026SPLIT SYSTEM COOLING REPLACEMENT AT MKC ARTCC (OLATHE, KS)
Department of Transportation · Federal Aviation Administration
W911RX25CA020
Completed: Period of performance ended Feb 11, 2026PROVIDE GENERAL REPAIR AND MINOR MAINTENANCE OF BUILDING 675 CLAMSHELL AND THE RELOCATABLE INDOOR SHOOTING RANGE.
Department of Defense · Department of the Army
W50S7X25PA012
Completed: Period of performance ended Jan 1, 2026WORK SHALL CONSIST OF THE REPLACEMENT OF A 5-TON GEOTHERMAL HEAT PUMP INSIDE BUILDING 37.
Department of Defense · Department of the Army
W50S7X25PA010
Completed: Period of performance ended Nov 26, 2025WORK SHALL CONSIST OF THE FOLLOWING: INSTALLATION OF X2 CHILLERS AT BUILDING 44. THE GOVERNMENT HAS PURCHASED X2 DAIKIN APPLIED MODEL…
Department of Defense · Department of the Army
W91QF425PA020
Completed: Period of performance ended Nov 10, 2025REFERENCE SOW
Department of Defense · Department of the Army
697DCK25C00223
Completed: Period of performance ended Oct 30, 2025DSM ASR HVAC REPLACEMENT PROJECT AT THE DSM AIRPORT IN DES MOINES, IA
Department of Transportation · Federal Aviation Administration
W50S6V25PA015
Completed: Period of performance ended Sep 23, 2025THE 140TH FORCE SUPPORT SQUADRON REQUIRES FREEZER REPLACE SERVICES TO ENSURE THEY HAVE THEIR SOLE FREEZER IN WORKING CONDITION TO ALLOW…
Department of Defense · Department of the Army
W50S7X25PA002
Completed: Period of performance ended Jul 31, 2025BLDG 16 HMI REPAIR
Department of Defense · Department of the Army
W50S8U24CA010
Completed: Period of performance ended Mar 28, 2025REPLACE R22 HVAC SYSTEMS AT 138 FW, TULSA OKLAHOMA.
Department of Defense · Department of the Army
12405B24P0285
Completed: Period of performance ended Mar 17, 2025GREENHOUSE CHILLER REPLACEMENT, STUTTGART, AR
Department of Agriculture · Agricultural Research Service
W50S7X24C0004
Completed: Period of performance ended Oct 31, 2024BUILDING 42 HVAC REPLACEMENT
Department of Defense · Department of the Army
W50S8T24C0002
Completed: Period of performance ended Oct 30, 2024BASE BID FOR COMM ROOMS HVAC-OBASE
Department of Defense · Department of the Army
12FPC324P0058
Completed: Period of performance ended Oct 3, 2024SEED COOLER DESICCANT DEHUMIDIFIER REPLACEMENT ELSBERRY PLANT MATERIALS CENTER, LINCOLN COUNTY, ELSBERRY MO.
Department of Agriculture · Under Secretary for Farm and Foreign Agricultural Services
697DCK22C00293
Completed: Period of performance ended Feb 16, 2024HVAC MODERNIZATION AT THE DSM ATCT IN DES MOINES, IOWA
Department of Transportation · Federal Aviation Administration
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
140P6426C0017 EO 14398 - CONSTRUCTION, HEAT PUMP REPLACEMENT @ BRVB | Department of the Interior · National Park Service | 238220 · J043 | $90.2K | Aug 24, 2026 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award 140P6426C0017Bid team |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
No SBIR/STTR awards on record
Source: SBIR.gov award records · sync date not recorded
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
W50S7G26CA003 WALK-IN FREEZER REFURB | Department of Defense · Department of the Army | 811310 · J041 | $25K | Jun 15, 2026 – Jul 31, 2026 | Completed: Period of performance ended Jul 31, 2026 |
697DCK25C00232 SPLIT SYSTEM COOLING REPLACEMENT AT MKC ARTCC (OLATHE, KS) | Department of Transportation · Federal Aviation Administration | 238210 · Z1BA | $427.1K | Jul 23, 2025 – Jul 17, 2026 | Completed: Period of performance ended Jul 17, 2026 |
W911RX25CA020 PROVIDE GENERAL REPAIR AND MINOR MAINTENANCE OF BUILDING 675 CLAMSHELL AND THE RELOCATABLE INDOOR SHOOTING RANGE. | Department of Defense · Department of the Army | 531312 · Z1FB | $6.9K | Aug 25, 2025 – Feb 11, 2026 | Completed: Period of performance ended Feb 11, 2026 |
W50S7X25PA012 WORK SHALL CONSIST OF THE REPLACEMENT OF A 5-TON GEOTHERMAL HEAT PUMP INSIDE BUILDING 37. | Department of Defense · Department of the Army | 238220 · J045 | $29.9K | Oct 1, 2025 – Jan 1, 2026 | Completed: Period of performance ended Jan 1, 2026 |
W50S7X25PA010 WORK SHALL CONSIST OF THE FOLLOWING: INSTALLATION OF X2 CHILLERS AT BUILDING 44. THE GOVERNMENT HAS PURCHASED X2 DAIKIN APPLIED MODEL… | Department of Defense · Department of the Army | 238220 · N041 | $88K | Sep 26, 2025 – Nov 26, 2025 | Completed: Period of performance ended Nov 26, 2025 |
W91QF425PA020 REFERENCE SOW | Department of Defense · Department of the Army | 236220 · Z2JZ | $27K | Jul 11, 2025 – Nov 10, 2025 | Completed: Period of performance ended Nov 10, 2025 |
697DCK25C00223 DSM ASR HVAC REPLACEMENT PROJECT AT THE DSM AIRPORT IN DES MOINES, IA | Department of Transportation · Federal Aviation Administration | 238220 · Z1BA | $247.9K | Jul 16, 2025 – Oct 30, 2025 | Completed: Period of performance ended Oct 30, 2025 |
W50S6V25PA015 THE 140TH FORCE SUPPORT SQUADRON REQUIRES FREEZER REPLACE SERVICES TO ENSURE THEY HAVE THEIR SOLE FREEZER IN WORKING CONDITION TO ALLOW… | Department of Defense · Department of the Army | 811310 · J041 | $27.7K | Sep 23, 2025 – Sep 23, 2025 | Completed: Period of performance ended Sep 23, 2025 |
W50S7X25PA002 BLDG 16 HMI REPAIR | Department of Defense · Department of the Army | 238210 · N061 | $88.9K | Mar 3, 2025 – Jul 31, 2025 | Completed: Period of performance ended Jul 31, 2025 |
W50S8U24CA010 REPLACE R22 HVAC SYSTEMS AT 138 FW, TULSA OKLAHOMA. | Department of Defense · Department of the Army | 238220 · J041 | $181K | Sep 30, 2024 – Mar 28, 2025 | Completed: Period of performance ended Mar 28, 2025 |
12405B24P0285 GREENHOUSE CHILLER REPLACEMENT, STUTTGART, AR | Department of Agriculture · Agricultural Research Service | 238220 · Z2AA | $93.9K | Aug 26, 2024 – Mar 17, 2025 | Completed: Period of performance ended Mar 17, 2025 |
W50S7X24C0004 BUILDING 42 HVAC REPLACEMENT | Department of Defense · Department of the Army | 238220 · Z2AA | $57.6K | Aug 1, 2024 – Oct 31, 2024 | Completed: Period of performance ended Oct 31, 2024 |
W50S8T24C0002 BASE BID FOR COMM ROOMS HVAC-OBASE | Department of Defense · Department of the Army | 236220 · Z2JZ | $93.7K | Jun 3, 2024 – Oct 30, 2024 | Completed: Period of performance ended Oct 30, 2024 |
12FPC324P0058 SEED COOLER DESICCANT DEHUMIDIFIER REPLACEMENT ELSBERRY PLANT MATERIALS CENTER, LINCOLN COUNTY, ELSBERRY MO. | Department of Agriculture · Under Secretary for Farm and Foreign Agricultural Services | 238220 · Z1EZ | $45.2K | Jul 3, 2024 – Oct 3, 2024 | Completed: Period of performance ended Oct 3, 2024 |
697DCK22C00293 HVAC MODERNIZATION AT THE DSM ATCT IN DES MOINES, IOWA | Department of Transportation · Federal Aviation Administration | 238220 · Z1BA | $1.2M | Sep 9, 2022 – Feb 16, 2024 | Completed: Period of performance ended Feb 16, 2024 |
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 10, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 10, 2026