ATSP INNOVATIONS INC
- WALLER, TX 77484-5073
- atspinnovations.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $6.6M
- Awards on record
- 9
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
ATSP INNOVATIONS INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About ATSP INNOVATIONS INC
- Headquarters
- WALLER, TX 77484-5073
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEID1E4E2QKPKR4
- CAGE66PY6
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $6.6M
- Awards on record
- 9
- Top funding agencies
- National Aeronautics and Space Administration · Department of the Air Force · Department of the Army
Awards
80NSSC26C0417
Recompete 6–12 mo: Potential end Oct 16, 2027 (11 months away)SBIR PHASE III ATSP INNOVATIONS - REVERSIBLE ADHESION CONCEPT FOR IN-SPACE ASSEMBLY
National Aeronautics and Space Administration
- Obligated
- $100K
- Period of performance
- Aug 17, 2026 – Oct 16, 2027
FA254125CB068
Recompete 6–12 mo: Potential end Jul 14, 2027 (8 months away)THIS AWARD SUPPORTS THE US SPACE FORCE SBIR/STTR TOPIC SF224-0010 - REVERSIBLE THERMALLY DRIVEN ADHESIVE (RTDA) FOR ON-ORBIT ASSEMBLY.
Department of Defense · Department of the Air Force
- Obligated
- $1.2M
- Period of performance
- Jul 15, 2025 – Jul 14, 2027
80NSSC26C0210
Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)SBIR PHASE I - DIELECTRIC ELASTOMER FIBER TECHNOLOGY (DEFT) FOR PROPELLANTLESS CONTROL
National Aeronautics and Space Administration
- Obligated
- $224.9K
- Period of performance
- Sep 30, 2026 – Mar 30, 2027
80NSSC21C0055
Recompete < 6 mo: Potential end Mar 15, 2027 (4 months away)REVERSIBLE ADHESION CONCEPT FOR IN-SPACE ASSEMBLY
National Aeronautics and Space Administration
- Obligated
- $383.5K
- Period of performance
- May 11, 2021 – Mar 15, 2027
80NSSC23CA211
Completed: Period of performance ended Jul 25, 2026FY23 PHASE II SEQUENTIAL - HIGH PERFORMANCE POLYMER FOR DUST TOLERANT EXTREME ENVIRONMENT BEARINGS
National Aeronautics and Space Administration
- Obligated
- $3.2M
- Period of performance
- Sep 26, 2023 – Jul 25, 2026
W5170126CA003
Completed: Period of performance ended Jul 12, 2026STTR PHASE I TOPIC A25D-008: ADVANCED FIBER-BASED ELECTRONIC BATTERY SYSTEM
Department of Defense · Department of the Army
- Obligated
- $249.8K
- Period of performance
- Jan 12, 2026 – Jul 12, 2026
N6833525C0366
Completed: Period of performance ended Jan 7, 2026RESEARCH AND DEVELOPMENT.
Department of Defense · Department of the Navy
- Obligated
- $140K
- Period of performance
- Jul 7, 2025 – Jan 7, 2026
80NSSC24PB218
Completed: Period of performance ended Feb 6, 2025FY24 SBIR PHASE I- DEVELOPMENT OF HIGH-VOLTAGE CRYOGENIC SECONDARY LI-METAL BATTERIES SUITABLE FOR TEMPERATURES BELOW MINUS 80 DEGREES C
National Aeronautics and Space Administration
- Obligated
- $149.9K
- Period of performance
- Aug 7, 2024 – Feb 6, 2025
80NSSC20C0180
Completed: Period of performance ended May 5, 2024EXTREME ENVIRONMENT TRIBOLOGICAL CHARACTERIZATION OF ADVANCED BEARING MATERIALS
National Aeronautics and Space Administration
- Obligated
- $885.1K
- Period of performance
- Sep 30, 2020 – May 5, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
80NSSC26C0417 SBIR PHASE III ATSP INNOVATIONS - REVERSIBLE ADHESION CONCEPT FOR IN-SPACE ASSEMBLY | National Aeronautics and Space Administration | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $100K | Aug 17, 2026 – Oct 16, 2027 | Recompete 6–12 mo: Potential end Oct 16, 2027 (11 months away)AI brief for award 80NSSC26C0417Bid team for the recompete of award 80NSSC26C0417 |
FA254125CB068 THIS AWARD SUPPORTS THE US SPACE FORCE SBIR/STTR TOPIC SF224-0010 - REVERSIBLE THERMALLY DRIVEN ADHESIVE (RTDA) FOR ON-ORBIT ASSEMBLY. | Department of Defense · Department of the Air Force | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $1.2M | Jul 15, 2025 – Jul 14, 2027 | Recompete 6–12 mo: Potential end Jul 14, 2027 (8 months away)AI brief for award FA254125CB068Bid team for the recompete of award FA254125CB068 |
80NSSC26C0210 SBIR PHASE I - DIELECTRIC ELASTOMER FIBER TECHNOLOGY (DEFT) FOR PROPELLANTLESS CONTROL | National Aeronautics and Space Administration | 541713 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $224.9K | Sep 30, 2026 – Mar 30, 2027 | Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)AI brief for award 80NSSC26C0210Bid team for the recompete of award 80NSSC26C0210 |
80NSSC21C0055 REVERSIBLE ADHESION CONCEPT FOR IN-SPACE ASSEMBLY | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $383.5K | May 11, 2021 – Mar 15, 2027 | Recompete < 6 mo: Potential end Mar 15, 2027 (4 months away)AI brief for award 80NSSC21C0055Bid team for the recompete of award 80NSSC21C0055 |
80NSSC23CA211 FY23 PHASE II SEQUENTIAL - HIGH PERFORMANCE POLYMER FOR DUST TOLERANT EXTREME ENVIRONMENT BEARINGS | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $3.2M | Sep 26, 2023 – Jul 25, 2026 | Completed: Period of performance ended Jul 25, 2026 |
W5170126CA003 STTR PHASE I TOPIC A25D-008: ADVANCED FIBER-BASED ELECTRONIC BATTERY SYSTEM | Department of Defense · Department of the Army | 541715 · AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH | $249.8K | Jan 12, 2026 – Jul 12, 2026 | Completed: Period of performance ended Jul 12, 2026 |
N6833525C0366 RESEARCH AND DEVELOPMENT. | Department of Defense · Department of the Navy | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $140K | Jul 7, 2025 – Jan 7, 2026 | Completed: Period of performance ended Jan 7, 2026 |
80NSSC24PB218 FY24 SBIR PHASE I- DEVELOPMENT OF HIGH-VOLTAGE CRYOGENIC SECONDARY LI-METAL BATTERIES SUITABLE FOR TEMPERATURES BELOW MINUS 80 DEGREES C | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $149.9K | Aug 7, 2024 – Feb 6, 2025 | Completed: Period of performance ended Feb 6, 2025 |
80NSSC20C0180 EXTREME ENVIRONMENT TRIBOLOGICAL CHARACTERIZATION OF ADVANCED BEARING MATERIALS | National Aeronautics and Space Administration | 541614 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $885.1K | Sep 30, 2020 – May 5, 2024 | Completed: Period of performance ended May 5, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 21 awards
- Total awarded
- $8,698,427
- By phase
- SBIR Phase I: 12
- SBIR Phase II: 5
- STTR Phase I: 4
- By agency
- National Aeronautics and Space Administration: 14
- Department of Defense: 5
- National Science Foundation: 2
- Active projects
- 1 project
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 1 project
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2025: 2
- 2024: 1
- 2023: 3
- 2021: 4
- 2020: 4
- 2019: 1
- 2018: 1
- 2017: 2
- 2014: 1
- 2012: 1
- 2011: 1
Awards (most recent first)
Placeholder
SBIR Phase II · Department of Defense (Air Force) · 2025 · $1,249,791
Jul 15, 2025 – Jul 15, 2027
- Active
- Ends Jul 2027
Solicitation 22.4 (2022) · Topic SF224-0010
Vitrimer Patches for Epoxy/Carbon Fiber Damage Restoration (VIPER)
STTR Phase I · Department of Defense (Navy) · 2025 · $139,988
Jul 7, 2025 – Jan 7, 2026
Solicitation 25.A (2025) · Topic N25A-T013 · Research partner: Texas A&M Engineering Experiment Station
Development of High-Voltage Cryogenic Secondary Li-Metal Batteries Suitable for Temperatures Below -80°C
STTR Phase I · National Aeronautics and Space Administration · 2024 · $149,933
Jul 31, 2024 – Sep 8, 2025
Solicitation STTR-2024-Phase 1 (2024) · Topic T3 · Research partner: University of Tulsa, Tulsa, OK
High performance polymer for dust tolerant extreme environment bearings
SBIR Phase II · National Aeronautics and Space Administration · 2023 · $3,211,836
Sep 26, 2023 – Sep 25, 2025
Solicitation SEQ_23_P2S_C1 (2023) · Topic S4
Dust tolerant dynamic seal material for extreme lunar atmosphere
SBIR Phase I · National Aeronautics and Space Administration · 2023 · $149,911
Jul 13, 2023 – Feb 2, 2024
Solicitation SBIR_23_P1 (2023) · Topic Z13
Reversible Thermally Driven Adhesive (RTDA) for on-orbit assembly
SBIR Phase I · Department of Defense (Air Force) · 2023 · $149,999
Mar 16, 2023 – Jan 8, 2024
Solicitation 22.4 (2022) · Topic SF224-0010
High-performance Zinc-ion hybrid MEMS supercapacitors with high energy density
STTR Phase I · Department of Defense (Defense Microelectronics Activity) · 2021 · $166,706
Aug 5, 2021 – Feb 9, 2022
Solicitation 21.A (2021) · Topic DMEA21A-001 · Research partner: Texas A&M University
Phase change lubricant for superlubricity of sliding contacts in extreme space environment
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,987
May 15, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic S4
Surface micro-texturing of advanced bearing materials for lunar dust mitigation
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,895
May 5, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic Z13
In-space testing of reversible adhesive system
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,954
May 5, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic H8
Extreme Environment Tribological Characterization of Advanced Bearing Materials
SBIR Phase II · National Aeronautics and Space Administration · 2020 · $754,981
Sep 30, 2020 – Sep 29, 2022
Solicitation SBIR_19_P2 (2019) · Topic S4
Creep-Resistant Aromatic Polyester Thermosets for Thin-Ply Composites
STTR Phase I · National Aeronautics and Space Administration · 2020 · $124,979
Aug 25, 2020 – Sep 30, 2021
Solicitation STTR_20_P1 (2020) · Topic T12 · Research partner: Texas A&M Engineering Experiment Station
Ultra-High Temperature Elastomer Sealing Materials
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $124,669
Aug 24, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic A1
Slender Dielectric Elastomer Fibers For Artificial Muscles
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2020 · $224,777
Feb 5, 2020 – Jan 4, 2021
Solicitation DARPA HR001119S0035-19 (2019) · Topic HR001119S0035-19
Extreme Environment Tribological Characterization of Advanced Bearing Materials
SBIR Phase I · National Aeronautics and Space Administration · 2019 · $124,999
Aug 19, 2019 – Feb 18, 2020
Solicitation SBIR_19_P1 (2019) · Topic S4
Reversible Adhesion Concept for In-Space Assembly
SBIR Phase II · National Aeronautics and Space Administration · 2018 · $749,992
Apr 26, 2018 – Apr 25, 2020
Solicitation SBIR_17_P2 (2017) · Topic Z4
Interchain Transesterification as a Solid-State Composite Welding Mechanism
SBIR Phase I · National Aeronautics and Space Administration · 2017 · $119,738
Jun 9, 2017 – Dec 8, 2017
Solicitation year 2017 · Topic A1.01
Reversible Adhesion Concept for In-Space Assembly
SBIR Phase I · National Aeronautics and Space Administration · 2017 · $123,446
Jun 9, 2017 – Dec 8, 2017
Solicitation year 2017 · Topic Z4.01
Aromatic Thermosetting coPolyester Composites for High Temperature and Cryogenic Applications
SBIR Phase I · National Aeronautics and Space Administration · 2014 · $125,000
Jun 20, 2014 – Dec 19, 2014
Solicitation year 2014 · Topic H5.03 · Research partner: Stub
SBIR Phase II: Ultra-Low Wear Coatings Based on a Novel Family of Aromatic Thermosetting Copolyesters
SBIR Phase II · National Science Foundation · 2012 · $484,988
Sep 1, 2012 – Aug 31, 2014
Solicitation year 2012 · Topic NM · Research partner: Stub
SBIR Phase I: Ultra-Low Wear Coatings Based on a Novel Family of Aromatic Thermosetting Copolyesters
SBIR Phase I · National Science Foundation · 2011 · $147,859
Jul 1, 2011 – Dec 31, 2011
Solicitation year 2010 · Topic NM · Research partner: Stub
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 325211Title not in the curated listSmall business under this code’s size standard
- 325991Title not in the curated listSmall business under this code’s size standard
SAM.gov reports this entity as small under 2 of 3 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
- 6810CHEMICALS
- 9330PLASTICS FABRICATED MATERIALS
- AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH
- AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
- AC13NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; EXPERIMENTAL DEVELOPMENT
- AG11ENERGY R&D SERVICES; ENERGY SUPPLY; BASIC RESEARCH
- AG12ENERGY R&D SERVICES; ENERGY SUPPLY; APPLIED RESEARCH
- AG13ENERGY R&D SERVICES; ENERGY SUPPLY; EXPERIMENTAL DEVELOPMENT
- AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH
- AJ12GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; APPLIED RESEARCH
- AJ13GENERAL SCIENCE & TECHNOLOGY R&D SVCS; GENERAL SCIENCE & TECHNOLOGY; EXPERIMENTAL DEVELOPMENT
- AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
- AR12SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; APPLIED RESEARCH
- AR13SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT
- AS21TRANSPORTATION R&D SERVICES; AEROSPACE RESEARCH; BASIC RESEARCH
- AS22TRANSPORTATION R&D SERVICES; AEROSPACE RESEARCH; APPLIED RESEARCH
- AS23TRANSPORTATION R&D SERVICES; AEROSPACE RESEARCH; EXPERIMENTAL DEVELOPMENT
- H168QUALITY CONTROL- CHEMICALS AND CHEMICAL PRODUCTS
- H268EQUIPMENT AND MATERIALS TESTING- CHEMICALS AND CHEMICAL PRODUCTS
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with ATSP INNOVATIONS INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
