ADDISON CONSTRUCTION CO
- CHEYENNE, WY 82009-9338
- Corporate Entity (Not Tax Exempt)
- SAM expiring
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $9.5M
- Awards on record
- 14
- Contract vehicles
- 0
- Verified credentials
- 0
SAM.gov registration expires in 20 days
ADDISON CONSTRUCTION CO’s registration expires on Dec 4, 2026. Renewal can take weeks; confirm it stays active through proposal submission and award.
View on SAM.gov (opens in a new tab)Learn more about SAM registration and the UEI
About ADDISON CONSTRUCTION CO
- Headquarters
- CHEYENNE, WY 82009-9338
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEID4N8K3L9E824
- CAGE48738
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $9.5M
- Awards on record
- 14
- Top funding agencies
- Department of Energy
Awards
89503226CWA000135
Recompete 18+ mo: Potential end Dec 1, 2028 (24 months away)THE STEGALL SUBSTATION STAGE 07 PHASE 01 PROJECT TO REPLACE END OF LIFE EQUIPMENT AND INSTALLS A NEW CONTROL BUILDING.
Department of Energy
- Obligated
- $442K
- Period of performance
- Sep 16, 2026 – Dec 1, 2028
89503426CWA000093
Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)BERESFORD SUBSTATION, STAGE 11, SOUTH DAKOTA
Department of Energy
- Obligated
- $42.2K
- Period of performance
- Aug 20, 2026 – Sep 30, 2027
89503225CWA000122
Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)NORTH CODY MOI 954 SWITCH REPLACEMENT - WESTERN AREA POWER ADMINISTRATION (WAPA) ROCKY MOUNTAIN REGION HAS A REQUIREMENT WITH THE…
Department of Energy
- Obligated
- $521.7K
- Period of performance
- Sep 16, 2025 – Sep 30, 2027
89503425CWA000081
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)GRAND ISLAND SUBSTATION, STAGE 08 AND SIOUX FALLS SUBSTATION, STAGE 15, STATION SERIVE UPGRADES, NEBRASKA AND SOUTH DAKOTA
Department of Energy
- Obligated
- $2.3M
- Period of performance
- Sep 10, 2025 – May 31, 2027
89503224CWA000104
Recompete < 6 mo: Potential end Feb 5, 2027 (2 months away)AULT SUBSTATION STAGE 10 TO REPLACE 13.8KV OIL REACTORS WITH GOVERNMENT FURNISHED AIR CORE REACTORS, REPLACE SIX GOVERNMENT FURNISHED…
Department of Energy
- Obligated
- $214.7K
- Period of performance
- Aug 22, 2024 – Feb 5, 2027
89503225CWA000119
Recompete < 6 mo: Potential end Dec 11, 2026 (under a month away)FLATIRON SUBSTATION 2025 BREAKER REPLACEMENT WITH PRINCIPAL COMPONENTS OF SUBSTATION WORK TO INCLUDE DEMOLITION AND SITE DEVELOPMENT,…
Department of Energy
- Obligated
- $189.2K
- Period of performance
- Aug 18, 2025 – Dec 11, 2026
89503424CWA000070
Completed: Period of performance ended Jan 31, 2026EAGLE BUTTE SUBSTATION, STAGE 03, SOUTH DAKOTA
Department of Energy
- Obligated
- $847.6K
- Period of performance
- Apr 12, 2024 – Jan 31, 2026
89503423CWA000068
Completed: Period of performance ended Jan 9, 2026GROTON SUBSTATION, STAGE 15, SOUTH DAKOTA
Department of Energy
- Obligated
- $1.6M
- Period of performance
- Sep 22, 2023 – Jan 9, 2026
89503222CWA000072
Completed: Period of performance ended May 1, 2025HOYT AND KIOWA CREEK 115-KV BREAKER REPLACEMENT
Department of Energy
- Obligated
- $770.6K
- Period of performance
- Aug 9, 2022 – May 1, 2025
89503424PWA001786
Completed: Period of performance ended Sep 30, 2024BOLTED BUS FITTINGS
Department of Energy
- Obligated
- $0
- Period of performance
- Mar 13, 2024 – Sep 30, 2024
89503122CWA000074
Completed: Period of performance ended Sep 5, 2024LIBERTY SUBSTATION - STATION SERVICE UPGRADES, CONTRACTOR TO AQUIRE AND INSTALL VARIOUS ELECTRICAL EQUIPMENT ITEMS. SEE SPEC FOR DETAILS
Department of Energy
- Obligated
- $1.3M
- Period of performance
- Sep 20, 2022 – Sep 5, 2024
89503424PWA001775
Completed: Period of performance ended Sep 1, 2024SUBSTATION CONNECTORS.
Department of Energy
- Obligated
- $9.7K
- Period of performance
- Feb 22, 2024 – Sep 1, 2024
89503222CWA000074
Completed: Period of performance ended Feb 15, 2024YELLOWTAIL BREAKER REPLACEMENT
Department of Energy
- Obligated
- $179.8K
- Period of performance
- Sep 7, 2022 – Feb 15, 2024
89503420CWA000042
Completed: Period of performance ended Nov 30, 2023CONSTRUCTION OF WATERTOWN SUBSTATION, STAGE 22, STATION SERVICE REPLACEMENT IN SOUTH DAKOTA AND BISMARCK SUBSTATION, STATION SERVICE…
Department of Energy
- Obligated
- $971.6K
- Period of performance
- Sep 8, 2020 – Nov 30, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
89503226CWA000135 THE STEGALL SUBSTATION STAGE 07 PHASE 01 PROJECT TO REPLACE END OF LIFE EQUIPMENT AND INSTALLS A NEW CONTROL BUILDING. | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $442K | Sep 16, 2026 – Dec 1, 2028 | Recompete 18+ mo: Potential end Dec 1, 2028 (24 months away) |
89503426CWA000093 BERESFORD SUBSTATION, STAGE 11, SOUTH DAKOTA | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $42.2K | Aug 20, 2026 – Sep 30, 2027 | Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)AI brief for award 89503426CWA000093Bid team for the recompete of award 89503426CWA000093 |
89503225CWA000122 NORTH CODY MOI 954 SWITCH REPLACEMENT - WESTERN AREA POWER ADMINISTRATION (WAPA) ROCKY MOUNTAIN REGION HAS A REQUIREMENT WITH THE… | Department of Energy | 237130 · J061MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $521.7K | Sep 16, 2025 – Sep 30, 2027 | Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)AI brief for award 89503225CWA000122Bid team for the recompete of award 89503225CWA000122 |
89503425CWA000081 GRAND ISLAND SUBSTATION, STAGE 08 AND SIOUX FALLS SUBSTATION, STAGE 15, STATION SERIVE UPGRADES, NEBRASKA AND SOUTH DAKOTA | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $2.3M | Sep 10, 2025 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award 89503425CWA000081Bid team for the recompete of award 89503425CWA000081 |
89503224CWA000104 AULT SUBSTATION STAGE 10 TO REPLACE 13.8KV OIL REACTORS WITH GOVERNMENT FURNISHED AIR CORE REACTORS, REPLACE SIX GOVERNMENT FURNISHED… | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $214.7K | Aug 22, 2024 – Feb 5, 2027 | Recompete < 6 mo: Potential end Feb 5, 2027 (2 months away)AI brief for award 89503224CWA000104Bid team for the recompete of award 89503224CWA000104 |
89503225CWA000119 FLATIRON SUBSTATION 2025 BREAKER REPLACEMENT WITH PRINCIPAL COMPONENTS OF SUBSTATION WORK TO INCLUDE DEMOLITION AND SITE DEVELOPMENT,… | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $189.2K | Aug 18, 2025 – Dec 11, 2026 | Recompete < 6 mo: Potential end Dec 11, 2026 (under a month away)AI brief for award 89503225CWA000119Bid team for the recompete of award 89503225CWA000119 |
89503424CWA000070 EAGLE BUTTE SUBSTATION, STAGE 03, SOUTH DAKOTA | Department of Energy | 237130 · Y1EBCONSTRUCTION OF MAINTENANCE BUILDINGS | $847.6K | Apr 12, 2024 – Jan 31, 2026 | Completed: Period of performance ended Jan 31, 2026 |
89503423CWA000068 GROTON SUBSTATION, STAGE 15, SOUTH DAKOTA | Department of Energy | 237130 · Y1EBCONSTRUCTION OF MAINTENANCE BUILDINGS | $1.6M | Sep 22, 2023 – Jan 9, 2026 | Completed: Period of performance ended Jan 9, 2026 |
89503222CWA000072 HOYT AND KIOWA CREEK 115-KV BREAKER REPLACEMENT | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $770.6K | Aug 9, 2022 – May 1, 2025 | Completed: Period of performance ended May 1, 2025 |
89503424PWA001786 BOLTED BUS FITTINGS | Department of Energy | 332999 · 5935CONNECTORS, ELECTRICAL | $0 | Mar 13, 2024 – Sep 30, 2024 | Completed: Period of performance ended Sep 30, 2024 |
89503122CWA000074 LIBERTY SUBSTATION - STATION SERVICE UPGRADES, CONTRACTOR TO AQUIRE AND INSTALL VARIOUS ELECTRICAL EQUIPMENT ITEMS. SEE SPEC FOR DETAILS | Department of Energy | 237130 · Y1NZCONSTRUCTION OF OTHER UTILITIES | $1.3M | Sep 20, 2022 – Sep 5, 2024 | Completed: Period of performance ended Sep 5, 2024 |
89503424PWA001775 SUBSTATION CONNECTORS. | Department of Energy | 335931 · 5935CONNECTORS, ELECTRICAL | $9.7K | Feb 22, 2024 – Sep 1, 2024 | Completed: Period of performance ended Sep 1, 2024 |
89503222CWA000074 YELLOWTAIL BREAKER REPLACEMENT | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $179.8K | Sep 7, 2022 – Feb 15, 2024 | Completed: Period of performance ended Feb 15, 2024 |
89503420CWA000042 CONSTRUCTION OF WATERTOWN SUBSTATION, STAGE 22, STATION SERVICE REPLACEMENT IN SOUTH DAKOTA AND BISMARCK SUBSTATION, STATION SERVICE… | Department of Energy | 237130 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $971.6K | Sep 8, 2020 – Nov 30, 2023 | Completed: Period of performance ended Nov 30, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237130Power and Communication Line and Related Structures ConstructionPrimary
- 332999All Other Miscellaneous Fabricated Metal Product Manufacturing
- 335931Current-Carrying Wiring Device Manufacturing
- 335999All Other Miscellaneous Electrical Equipment and Component Manufacturing
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with ADDISON CONSTRUCTION CO?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.