
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
SAM.gov registration expires in 8 days
SOLID MATERIAL SOLUTIONS LLC’s registration expires on Nov 20, 2026. Renewal can take weeks; confirm it stays active through proposal submission and award.
View on SAM.gov (opens in a new tab)Learn more about SAM registration and the UEI
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Awards
80NSSC25C0073
Recompete 6–12 mo: Potential end Aug 17, 2027 (9 months away)PHASE II SBIR 80NSSC25C0073 SUPERCONDUCTING COIL OPERATING AT TEMPERATURES ABOVE 15K FOR ADR INSTRUMENTS
National Aeronautics and Space Administration
80NSSC24CA156
Recompete < 6 mo: Potential end Apr 20, 2027 (5 months away)SBIR PHASE II - SUPERCONDUCTING STATOR THAT ENABLES MUCH LOWER WEIGHT 1 MW - 4 MW MOTORS
National Aeronautics and Space Administration
80NSSC27C0065
Recompete < 6 mo: Potential end Apr 13, 2027 (5 months away)PHASE III SBIR
National Aeronautics and Space Administration
80NSSC24PB441
Completed: Period of performance ended Feb 6, 2025SUPERCONDUCTING COIL OPERATING AT TEMPERATURES ABOVE 15K FOR ADR INSTRUMENTS
National Aeronautics and Space Administration
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
80NSSC25C0073 PHASE II SBIR 80NSSC25C0073 SUPERCONDUCTING COIL OPERATING AT TEMPERATURES ABOVE 15K FOR ADR INSTRUMENTS | National Aeronautics and Space Administration | 541713 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $850K | Aug 18, 2025 – Aug 17, 2027 | Recompete 6–12 mo: Potential end Aug 17, 2027 (9 months away) |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
80NSSC24CA156 SBIR PHASE II - SUPERCONDUCTING STATOR THAT ENABLES MUCH LOWER WEIGHT 1 MW - 4 MW MOTORS | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $955K | Jun 24, 2024 – Apr 20, 2027 | Recompete < 6 mo: Potential end Apr 20, 2027 (5 months away)AI brief for award 80NSSC24CA156Bid team for the recompete of award 80NSSC24CA156 |
80NSSC27C0065 PHASE III SBIR | National Aeronautics and Space Administration | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $30K | Oct 14, 2026 – Apr 13, 2027 | Recompete < 6 mo: Potential end Apr 13, 2027 (5 months away)AI brief for award 80NSSC27C0065Bid team for the recompete of award 80NSSC27C0065 |
80NSSC24PB441 SUPERCONDUCTING COIL OPERATING AT TEMPERATURES ABOVE 15K FOR ADR INSTRUMENTS | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Aug 7, 2024 – Feb 6, 2025 | Completed: Period of performance ended Feb 6, 2025 |
Awards (most recent first)
Superconducting coil operating at temperatures above 15K for ADR instruments
SBIR Phase II · National Aeronautics and Space Administration · 2025 · $849,999
Aug 14, 2025 – Aug 17, 2027
Solicitation SBIR 2024-II (2024) · Topic S16
Superconducting coil operating at temperatures above 15K for ADR instruments
SBIR Phase I · National Aeronautics and Space Administration · 2024 · $150,000
Jul 22, 2024 – Feb 6, 2025
Solicitation SBIR-2024-Phase 1 (2024) · Topic S16
Superconducting stator that enables much lower weight 1 MW - 4 MW motors
SBIR Phase II · National Aeronautics and Space Administration · 2024 · $850,000
Jun 24, 2024 – Jun 23, 2026
Solicitation SBIR_23_P2 (2023) · Topic A1
Superconducting stator that enables much lower weight 1 MW - 4 MW motors
SBIR Phase I · National Aeronautics and Space Administration · 2023 · $150,000
Jul 24, 2023 – Feb 2, 2024
Solicitation SBIR_23_P1 (2023) · Topic A1
Superconducting scanner magnet for much lower cost, compact proton therapy systems
SBIR Phase I · Department of Health and Human Services (National Institutes of Health) · 2022 · $359,464
Sep 22, 2022 – Sep 21, 2023
Solicitation PA21-259 (2021) · Topic NIBIB
High temperature superconducting magnet operating above 15 K for ADR cooling
SBIR Phase II · National Aeronautics and Space Administration · 2022 · $750,000
May 9, 2022 – May 8, 2024
Solicitation SBIR_21_P2 (2021) · Topic S1
Advanced silver sheathed 2212/Ag wire for high field magnets
SBIR Phase II · Department of Energy · 2021 · $1,100,000
Aug 27, 2021 – Aug 26, 2023
Solicitation year 2021 · Topic 26a
High temperature superconducting magnet operating above 15 K for ADR cooling
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,999
May 18, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic S1
Bi2212 Superconductors for High-Power Density Motors for Aero Propulsion
SBIR Phase II · National Aeronautics and Space Administration · 2019 · $749,975
Aug 7, 2019 – Aug 6, 2021
Solicitation SBIR_18_P2 (2018) · Topic A1
Conduction cooled superconducting magnet for low cost, compact proton therapy systems
SBIR Phase I · Department of Health and Human Services (National Institutes of Health) · 2018 · $225,000
Sep 30, 2018 – Jun 30, 2019
Solicitation PA18-574 (2018) · Topic NIBIB
Strong, round cross-sectioned high current density 2212 wire
SBIR Phase II · Department of Energy · 2018 · $1,000,000
Aug 27, 2018 – Aug 26, 2020
Solicitation DE-FOA-0001795 (2018) · Topic 26a
Bi2212 Superconductors for High-Power Density Motors for Aero Propulsion
SBIR Phase I · National Aeronautics and Space Administration · 2018 · $124,990
Jul 27, 2018 – Feb 15, 2019
Solicitation SBIR_18_P1 (2018) · Topic A1
Compact, Low Current Superconductor Coil Operating Above 15 K for Magnetic Cooling
SBIR Phase I · National Aeronautics and Space Administration · 2018 · $122,421
Jul 27, 2018 – Feb 15, 2019
Solicitation SBIR_18_P1 (2018) · Topic S1
Advanced Silver Sheathed 2212/Ag Wire for High Field Magnets
SBIR Phase I · Department of Energy · 2018 · $150,000
Jul 2, 2018 – Apr 1, 2019
Solicitation DE-FOA-0001771 (2018) · Topic 26a
Persistent mode Liquid helium free Robust Bi Magnets for MRI and GHz NMR
SBIR Phase I · Department of Health and Human Services (National Institutes of Health) · 2017 · $225,000
Sep 1, 2017 – Aug 31, 2018
Solicitation PA16-303 (2016) · Topic NIBIB
Strong, round cross-sectioned high current density 2212 wire
SBIR Phase I · Department of Energy · 2017 · $150,000
Jun 12, 2017 – Jan 11, 2018
Solicitation DE-FOA-0001619 (2017) · Topic 26a
High-purity 2212 superconducting powder in sealed hermetic billets
SBIR Phase II · Department of Energy · 2015 · $1,000,000
Apr 6, 2015 – Apr 5, 2017
Solicitation DE-FOA-0001193 (2015) · Topic 33c
Domestic, high-quality 2212 precursor powder for high temperature superconducting round wires
SBIR Phase I · Department of Energy · 2014 · $150,000
Feb 18, 2014 – Nov 17, 2014
Solicitation DE-FOA-0000969 (2014) · Topic 33c
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 12, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 12, 2026