MILWAUKEE COMPOSITES, INC.
- CUDAHY, WI 53110-2841
- milwaukeecomposites.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $1.2M
- Awards on record
- 16
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
MILWAUKEE COMPOSITES, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About MILWAUKEE COMPOSITES, INC.
- Headquarters
- CUDAHY, WI 53110-2841
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEID9T3VK42BLV7
- CAGE7T2B6
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $1.2M
- Awards on record
- 16
- Top funding agencies
- Department of the Navy
Awards
N5005426P0084
Completed: Period of performance ended Jun 5, 2026USS TRUXTUN (DDG-103) COMPOSITE FALSE DECK PANELS FALSE DECK PANELS WITH LONMAT (MARBLE BLUE) 48IN X 96IN X 0.56IN (73 EA P/N 70424-000002…
Department of Defense · Department of the Navy
- Obligated
- $104.8K
- Period of performance
- Apr 7, 2026 – Jun 5, 2026
N5005426P0081
Completed: Period of performance ended May 18, 2026USS BAINBRIDGE (DDG-96); FALSE DECK PANELS 48 IN X 96 IN X 0.56 IN PANEL (75 EA NSN 2040-01-727-2423 / P/N 70424-000002)
Department of Defense · Department of the Navy
- Obligated
- $101.9K
- Period of performance
- Mar 13, 2026 – May 18, 2026
N5005426P0076
Completed: Period of performance ended Apr 29, 2026USS COLE (DDG-67) FALSE DECK PANELS NSN 2040017272423
Department of Defense · Department of the Navy
- Obligated
- $33.9K
- Period of performance
- Feb 26, 2026 – Apr 29, 2026
N5005426P0073
Completed: Period of performance ended Apr 6, 2026USS MITSCHER (DDG-57) COMPOSITE FALSE DECK PANELS; 48 IN X 96 IN X .56IN (42 EA NSN 2040-01-724-4493 P/N 70424-000002)
Department of Defense · Department of the Navy
- Obligated
- $55.1K
- Period of performance
- Feb 25, 2026 – Apr 6, 2026
N5005426P0041
Completed: Period of performance ended Mar 18, 2026USS BAINBRIDGE- (DDG-96) SURFACE SHIP COMPOSITE FALSE DECK PANELS / PART# 70424-000002 / 60 EACH, (48 X 96 X 0.56 PANEL WITH LONMAT M05.6)
Department of Defense · Department of the Navy
- Obligated
- $78.8K
- Period of performance
- Jan 14, 2026 – Mar 18, 2026
N0040625PS512
Completed: Period of performance ended Dec 10, 2025PANEL, FALSE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE, WITH LONMAT FLOORING WEAR SURFACE, SPEC: MIL-PRF-32664, TYPE I,…
Department of Defense · Department of the Navy
- Obligated
- $64.8K
- Period of performance
- Sep 10, 2025 – Dec 10, 2025
N5523625P0068
Completed: Period of performance ended Dec 8, 2025SWRMC CODE 410A - USS RUSSELL (DDG-59) FALSE DECK PANELS
Department of Defense · Department of the Navy
- Obligated
- $67.7K
- Period of performance
- Jul 15, 2025 – Dec 8, 2025
N5005425P0412
Completed: Period of performance ended Dec 5, 2025USS LABOON (DDG-58) 48 X 96 PHENOLIC COMPOSITE FALSE DECK PANELS (110 EA P/N 70424-000002-96 / NSN 2040-01-727-2423)
Department of Defense · Department of the Navy
- Obligated
- $143.8K
- Period of performance
- Aug 25, 2025 – Dec 5, 2025
N0040625PS168
Completed: Period of performance ended Sep 3, 2025PANEL, FLASE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE WITH LONMAT FLOORING WEAR SURFACESPEC: MIL-PRF-32664, TYPE I,…
Department of Defense · Department of the Navy
- Obligated
- $62K
- Period of performance
- Jun 3, 2025 – Sep 3, 2025
N0040625PS216
Completed: Period of performance ended Aug 5, 2025FLASE DECK PANEL, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE WITH LONMAT FLOORING WEAR SURFACE
Department of Defense · Department of the Navy
- Obligated
- $12.8K
- Period of performance
- Jun 16, 2025 – Aug 5, 2025
N0040625PS207
Completed: Period of performance ended Jul 15, 2025PANEL FALSE DECK COMPOSITE
Department of Defense · Department of the Navy
- Obligated
- $26.1K
- Period of performance
- Jun 18, 2025 – Jul 15, 2025
N0040625PS167
Completed: Period of performance ended Jun 27, 2025PANEL, FALSE DECK PANEL, FALSE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE, WITH LONMAT FLOORING WEAR SURFACESPEC:…
Department of Defense · Department of the Navy
- Obligated
- $11.3K
- Period of performance
- Jun 2, 2025 – Jun 27, 2025
N0040625PS074
Completed: Period of performance ended Jun 4, 2025PANEL, FALSE DECK, COMPOSIT, CO-CURED BALSA CORE AND PHENOLIC COMPPOSITE, WITH LONMAT FLOORING WEAR SURFACE SPEC: MIL-PRF32664, TYPE I,…
Department of Defense · Department of the Navy
- Obligated
- $16.3K
- Period of performance
- Apr 28, 2025 – Jun 4, 2025
N5523625P0003
Completed: Period of performance ended Jan 6, 2025410A LLTM FALSE DECK PANELS, SCREWS & FERRULES (USS GREENBAY)
Department of Defense · Department of the Navy
- Obligated
- $102.3K
- Period of performance
- Nov 15, 2024 – Jan 6, 2025
N5523625P0005
Completed: Period of performance ended Dec 30, 2024CODE 410A SAP - TO PROCURE FALSE DECK PANELS IN SUPPORT OF THE USS HALSEY (DDG-97)
Department of Defense · Department of the Navy
- Obligated
- $115.6K
- Period of performance
- Nov 26, 2024 – Dec 30, 2024
N0040624P0351
Completed: Period of performance ended May 7, 2024PANEL FALSE DECK FOR SRF-JAPAN
Department of Defense · Department of the Navy
- Obligated
- $233.6K
- Period of performance
- Mar 21, 2024 – May 7, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
N5005426P0084 USS TRUXTUN (DDG-103) COMPOSITE FALSE DECK PANELS FALSE DECK PANELS WITH LONMAT (MARBLE BLUE) 48IN X 96IN X 0.56IN (73 EA P/N 70424-000002… | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $104.8K | Apr 7, 2026 – Jun 5, 2026 | Completed: Period of performance ended Jun 5, 2026 |
N5005426P0081 USS BAINBRIDGE (DDG-96); FALSE DECK PANELS 48 IN X 96 IN X 0.56 IN PANEL (75 EA NSN 2040-01-727-2423 / P/N 70424-000002) | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $101.9K | Mar 13, 2026 – May 18, 2026 | Completed: Period of performance ended May 18, 2026 |
N5005426P0076 USS COLE (DDG-67) FALSE DECK PANELS NSN 2040017272423 | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $33.9K | Feb 26, 2026 – Apr 29, 2026 | Completed: Period of performance ended Apr 29, 2026 |
N5005426P0073 USS MITSCHER (DDG-57) COMPOSITE FALSE DECK PANELS; 48 IN X 96 IN X .56IN (42 EA NSN 2040-01-724-4493 P/N 70424-000002) | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $55.1K | Feb 25, 2026 – Apr 6, 2026 | Completed: Period of performance ended Apr 6, 2026 |
N5005426P0041 USS BAINBRIDGE- (DDG-96) SURFACE SHIP COMPOSITE FALSE DECK PANELS / PART# 70424-000002 / 60 EACH, (48 X 96 X 0.56 PANEL WITH LONMAT M05.6) | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $78.8K | Jan 14, 2026 – Mar 18, 2026 | Completed: Period of performance ended Mar 18, 2026 |
N0040625PS512 PANEL, FALSE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE, WITH LONMAT FLOORING WEAR SURFACE, SPEC: MIL-PRF-32664, TYPE I,… | Department of Defense · Department of the Navy | 326199 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $64.8K | Sep 10, 2025 – Dec 10, 2025 | Completed: Period of performance ended Dec 10, 2025 |
N5523625P0068 SWRMC CODE 410A - USS RUSSELL (DDG-59) FALSE DECK PANELS | Department of Defense · Department of the Navy | 326199 · 7220FLOOR COVERINGS | $67.7K | Jul 15, 2025 – Dec 8, 2025 | Completed: Period of performance ended Dec 8, 2025 |
N5005425P0412 USS LABOON (DDG-58) 48 X 96 PHENOLIC COMPOSITE FALSE DECK PANELS (110 EA P/N 70424-000002-96 / NSN 2040-01-727-2423) | Department of Defense · Department of the Navy | 336611 · 2040MARINE HARDWARE AND HULL ITEMS | $143.8K | Aug 25, 2025 – Dec 5, 2025 | Completed: Period of performance ended Dec 5, 2025 |
N0040625PS168 PANEL, FLASE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE WITH LONMAT FLOORING WEAR SURFACESPEC: MIL-PRF-32664, TYPE I,… | Department of Defense · Department of the Navy | 326199 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $62K | Jun 3, 2025 – Sep 3, 2025 | Completed: Period of performance ended Sep 3, 2025 |
N0040625PS216 FLASE DECK PANEL, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE WITH LONMAT FLOORING WEAR SURFACE | Department of Defense · Department of the Navy | 326199 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $12.8K | Jun 16, 2025 – Aug 5, 2025 | Completed: Period of performance ended Aug 5, 2025 |
N0040625PS207 PANEL FALSE DECK COMPOSITE | Department of Defense · Department of the Navy | 336611 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $26.1K | Jun 18, 2025 – Jul 15, 2025 | Completed: Period of performance ended Jul 15, 2025 |
N0040625PS167 PANEL, FALSE DECK PANEL, FALSE DECK, COMPOSITE, CO-CURED BALSA CORE AND PHENOLIC COMPOSITE, WITH LONMAT FLOORING WEAR SURFACESPEC:… | Department of Defense · Department of the Navy | 326199 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $11.3K | Jun 2, 2025 – Jun 27, 2025 | Completed: Period of performance ended Jun 27, 2025 |
N0040625PS074 PANEL, FALSE DECK, COMPOSIT, CO-CURED BALSA CORE AND PHENOLIC COMPPOSITE, WITH LONMAT FLOORING WEAR SURFACE SPEC: MIL-PRF32664, TYPE I,… | Department of Defense · Department of the Navy | 336611 · 9330PLASTICS FABRICATED MATERIALS | $16.3K | Apr 28, 2025 – Jun 4, 2025 | Completed: Period of performance ended Jun 4, 2025 |
N5523625P0003 410A LLTM FALSE DECK PANELS, SCREWS & FERRULES (USS GREENBAY) | Department of Defense · Department of the Navy | 326199 · 7220FLOOR COVERINGS | $102.3K | Nov 15, 2024 – Jan 6, 2025 | Completed: Period of performance ended Jan 6, 2025 |
N5523625P0005 CODE 410A SAP - TO PROCURE FALSE DECK PANELS IN SUPPORT OF THE USS HALSEY (DDG-97) | Department of Defense · Department of the Navy | 326199 · 2090MISCELLANEOUS SHIP AND MARINE EQUIPMENT | $115.6K | Nov 26, 2024 – Dec 30, 2024 | Completed: Period of performance ended Dec 30, 2024 |
N0040624P0351 PANEL FALSE DECK FOR SRF-JAPAN | Department of Defense · Department of the Navy | 326199 · 9330PLASTICS FABRICATED MATERIALS | $233.6K | Mar 21, 2024 – May 7, 2024 | Completed: Period of performance ended May 7, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 326130Title not in the curated listPrimarySmall business under this code’s size standard
- 326199All Other Plastics Product ManufacturingSmall business under this code’s size standard
SAM.gov reports this entity as small under 2 of 2 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
- 9330PLASTICS FABRICATED MATERIALS
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with MILWAUKEE COMPOSITES, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
