MICROLINK DEVICES INC
- NILES, IL 60714-3301
- mldevices.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $40.9M
- Awards on record
- 10
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
MICROLINK DEVICES INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About MICROLINK DEVICES INC
- Headquarters
- NILES, IL 60714-3301
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIDHJPU2QYVQK7
- CAGE1TQQ7
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $40.9M
- Awards on record
- 10
- Top funding agencies
- Department of the Air Force · National Aeronautics and Space Administration · Department of the Army
Awards
FA945325CX021
Recompete 18+ mo: Potential end Jul 17, 2029 (32 months away)LIGHTWEIGHT ADVANCED SPACE POWER TECHNOLOGY (LASP)
Department of Defense · Department of the Air Force
- Obligated
- $5.3M
- Period of performance
- Jul 17, 2025 – Jul 17, 2029
80NSSC27C0038
Recompete 18+ mo: Potential end Oct 31, 2028 (23 months away)SBIR 2025-II
National Aeronautics and Space Administration
- Obligated
- $1.3M
- Period of performance
- Nov 1, 2026 – Oct 31, 2028
80NSSC25C0431
Recompete 6–12 mo: Potential end Aug 11, 2027 (8 months away)PY25 SBIR/STTR CCRPP - FLEXIBLE SOLAR MODULES WITH PERFORMANCE-ENHANCING, LOW-COST PRISMATIC ENCAPSULATION
National Aeronautics and Space Administration
- Obligated
- $1.5M
- Period of performance
- Aug 12, 2025 – Aug 11, 2027
80NSSC25C0256
Completed: Period of performance ended Oct 28, 2026STTR PHASE I RADIATION RESISTANT SOLAR AND LASER POWER CONVERTER FOR LUNAR APPLICATIONS
National Aeronautics and Space Administration
- Obligated
- $150K
- Period of performance
- Sep 29, 2025 – Oct 28, 2026
FA945322C0004
Completed: Period of performance ended Oct 13, 2026E014042 LOW COST POWER PANELS ARA BAA
Department of Defense · Department of the Air Force
- Obligated
- $25.2M
- Period of performance
- Nov 10, 2021 – Oct 13, 2026
FA945322CA018
Completed: Period of performance ended Aug 10, 2026SPACE QUALIFICATION OF LOW-COST, LIGHT-WEIGHT AND FLEXIBLE POWER MODULES FOR SPACE APPLICATIONS POWER MODULES.
Department of Defense · Department of the Air Force
- Obligated
- $4.5M
- Period of performance
- May 6, 2022 – Aug 10, 2026
80NSSC25C0257
Completed: Period of performance ended Mar 27, 2026SBIR I ULTRA-THIN FLEXIBLE INGAP SOLAR ARRAYS EMBEDDED IN SOLAR SAILS FOR POWER GENERATION
National Aeronautics and Space Administration
- Obligated
- $150K
- Period of performance
- Sep 29, 2025 – Mar 27, 2026
W912CG23C0012
Completed: Period of performance ended Apr 30, 2025NEW DARPA SBIR PHASE II CONTRACT SOLICITATION AF221-DCSO1
Department of Defense · Department of the Army
- Obligated
- $1.5M
- Period of performance
- Dec 8, 2022 – Apr 30, 2025
80NSSC21C0479
Completed: Period of performance ended Oct 15, 2024FLEXIBLE SOLAR MODULES WITH LOW-COST PRISMATIC ENCAPSULATION
National Aeronautics and Space Administration
- Obligated
- $1.1M
- Period of performance
- Jul 16, 2021 – Oct 15, 2024
W911QY24P0037
Completed: Period of performance ended Sep 28, 2024STTR PH I - PROPOSAL NO: A23B-T023-0061
Department of Defense · Department of the Army
- Obligated
- $197K
- Period of performance
- Mar 29, 2024 – Sep 28, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
FA945325CX021 LIGHTWEIGHT ADVANCED SPACE POWER TECHNOLOGY (LASP) | Department of Defense · Department of the Air Force | 541715 · AC32NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; APPLIED RESEARCH | $5.3M | Jul 17, 2025 – Jul 17, 2029 | Recompete 18+ mo: Potential end Jul 17, 2029 (32 months away) |
80NSSC27C0038 SBIR 2025-II | National Aeronautics and Space Administration | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $1.3M | Nov 1, 2026 – Oct 31, 2028 | Recompete 18+ mo: Potential end Oct 31, 2028 (23 months away) |
80NSSC25C0431 PY25 SBIR/STTR CCRPP - FLEXIBLE SOLAR MODULES WITH PERFORMANCE-ENHANCING, LOW-COST PRISMATIC ENCAPSULATION | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $1.5M | Aug 12, 2025 – Aug 11, 2027 | Recompete 6–12 mo: Potential end Aug 11, 2027 (8 months away)AI brief for award 80NSSC25C0431Bid team for the recompete of award 80NSSC25C0431 |
80NSSC25C0256 STTR PHASE I RADIATION RESISTANT SOLAR AND LASER POWER CONVERTER FOR LUNAR APPLICATIONS | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Sep 29, 2025 – Oct 28, 2026 | Completed: Period of performance ended Oct 28, 2026 |
FA945322C0004 E014042 LOW COST POWER PANELS ARA BAA | Department of Defense · Department of the Air Force | 541715 · AC22NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; APPLIED RESEARCH | $25.2M | Nov 10, 2021 – Oct 13, 2026 | Completed: Period of performance ended Oct 13, 2026 |
FA945322CA018 SPACE QUALIFICATION OF LOW-COST, LIGHT-WEIGHT AND FLEXIBLE POWER MODULES FOR SPACE APPLICATIONS POWER MODULES. | Department of Defense · Department of the Air Force | 541715 · AR12SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; APPLIED RESEARCH | $4.5M | May 6, 2022 – Aug 10, 2026 | Completed: Period of performance ended Aug 10, 2026 |
80NSSC25C0257 SBIR I ULTRA-THIN FLEXIBLE INGAP SOLAR ARRAYS EMBEDDED IN SOLAR SAILS FOR POWER GENERATION | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Sep 29, 2025 – Mar 27, 2026 | Completed: Period of performance ended Mar 27, 2026 |
W912CG23C0012 NEW DARPA SBIR PHASE II CONTRACT SOLICITATION AF221-DCSO1 | Department of Defense · Department of the Army | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $1.5M | Dec 8, 2022 – Apr 30, 2025 | Completed: Period of performance ended Apr 30, 2025 |
80NSSC21C0479 FLEXIBLE SOLAR MODULES WITH LOW-COST PRISMATIC ENCAPSULATION | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $1.1M | Jul 16, 2021 – Oct 15, 2024 | Completed: Period of performance ended Oct 15, 2024 |
W911QY24P0037 STTR PH I - PROPOSAL NO: A23B-T023-0061 | Department of Defense · Department of the Army | 541715 · AJ12GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; APPLIED RESEARCH | $197K | Mar 29, 2024 – Sep 28, 2024 | Completed: Period of performance ended Sep 28, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 99 awards
- Total awarded
- $38,253,763
- By phase
- SBIR Phase I: 51
- SBIR Phase II: 25
- STTR Phase I: 16
- STTR Phase II: 7
- By agency
- Department of Defense: 48
- National Aeronautics and Space Administration: 40
- National Science Foundation: 6
- Department of Energy: 5
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2025: 2
- 2024: 1
- 2023: 1
- 2022: 5
- 2021: 4
- 2020: 4
- 2019: 4
- 2018: 5
- 2017: 7
- 2016: 7
- 2015: 9
- 2014: 9
- 2013: 5
- 2012: 5
- 2011: 6
- 2010: 2
- 2009: 7
- 2008: 6
- 2007: 4
- 2006: 1
- 2005: 1
- 2003: 2
- 2002: 1
- 2001: 1
Awards (most recent first)
Radiation Resistant Solar and Laser Power Converter for Lunar Applications
STTR Phase I · National Aeronautics and Space Administration · 2025 · $150,000
Sep 16, 2025 – Oct 28, 2026
Solicitation STTR 2025-I (2025) · Topic T3 · Research partner: Rochester Institute Of Technology
Ultra-Thin, Flexible InGaP Solar Arrays Embedded In Solar Sails for Power Generation
SBIR Phase I · National Aeronautics and Space Administration · 2025 · $150,000
Sep 15, 2025 – Mar 27, 2026
Solicitation SBIR 2025-I (2025) · Topic Z-GO
Laser Power Beaming to Sustain Small UAVs using ~1070 nm Source and Receiver
STTR Phase I · Department of Defense (Army) · 2024 · $197,000
Mar 1, 2024 – Sep 28, 2024
Solicitation 23.B (2023) · Topic A23B-T023 · Research partner: University of California Santa Barbara
High Efficiency GaN HBT for X-band Satellite Radar
SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2023 · $1,500,000
Dec 8, 2022 – Jul 7, 2024
- Direct to Phase II
Solicitation X22.1 (2022) · Topic AF221-DCSO1
Heteroepitaxy of QCL lasers
STTR Phase I · Department of Defense (Navy) · 2022 · $140,000
Aug 3, 2022 – Jan 17, 2023
Solicitation 22.A (2022) · Topic N22A-T007 · Research partner: University of Wisconsin
Array for High Efficiency Power Beaming
SBIR Phase I · National Aeronautics and Space Administration · 2022 · $150,000
Jul 5, 2022 – Jan 25, 2023
Solicitation SBIR_22_P1 (2022) · Topic Z1
High Performance Radiation Hard Solar Power (STRATFI)
SBIR Phase II · Department of Defense (Air Force) · 2022 · $4,500,000
May 6, 2022 – Aug 8, 2024
- Direct to Phase II
Solicitation X21.1 (2021) · Topic AF211-DCSO1
High Efficiency IMM solar cells using digital nano patterning
STTR Phase II · Department of Defense (Air Force) · 2022 · $750,000
Mar 10, 2022 – Jun 12, 2023
Solicitation X21.A (2021) · Topic AF21A-TCSO1 · Research partner: UNLV
Surface Texturing of Flexible Solar Array Blankets for Stratosonde
SBIR Phase II · Department of Defense (Air Force) · 2022 · $750,000
Oct 21, 2021 – Jan 23, 2023
- Direct to Phase II
Solicitation X21.1 (2021) · Topic AF211-DCSO1
Flexible Solar Modules with Low-Cost Prismatic Encapsulation
SBIR Phase II · National Aeronautics and Space Administration · 2021 · $750,000
Jul 16, 2021 – Jul 15, 2023
Solicitation SBIR_20_P2 (2020) · Topic S3
High Efficiency IMM solar cells using digital nano patterning
STTR Phase I · Department of Defense (Air Force) · 2021 · $50,000
Apr 15, 2021 – Jul 19, 2021
Solicitation X21.A (2021) · Topic AF21A-TCSO1 · Research partner: UNLV
Flexible Cell Protection on Flexible, Light-Weight, Radiation Tolerant Solar Cells
SBIR Phase II · Department of Defense (Air Force) · 2021 · $750,000
Mar 8, 2021 – Mar 15, 2022
Solicitation year 2020 · Topic J201-CSO1
Advanced High Specific Energy Power Systems for EVTOL
STTR Phase I · Department of Defense (Air Force) · 2021 · $150,000
Dec 18, 2020 – Jun 18, 2021
Solicitation X20.D (2020) · Topic AFX20D-TCSO1 · Research partner: University of Illinois at Urbana Champaign
Textured Solar Array
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $124,570
Aug 28, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic S3
Application of Distributed Bragg Reflector for Improved Radiation Tolerance of IMM Solar Cells
SBIR Phase II · Department of Defense (Air Force) · 2020 · $1,000,000
Jun 30, 2020 – Jun 30, 2022
- Direct to Phase II
Solicitation X20.R (2020) · Topic AF20R-DCSO1
Alternate Cover-Glass on Flexible, Light-Weight, Radiation Tolerant Solar Cells
SBIR Phase I · Department of Defense (Air Force) · 2020 · $50,000
Mar 9, 2020 – Jun 9, 2020
Solicitation X20.1 (2020) · Topic J201-CSO1
Advanced Solar Cells for Satellite Applications
SBIR Phase I · Department of Defense (Air Force) · 2020 · $50,000
Dec 12, 2019 – Dec 12, 2020
Solicitation DoD SBIR X19.2 (2020) · Topic AF193-CSO1
High Specific Power Radiation Hard Bifacial Back Metal Mirror Solar Cells for Flex Arrays
SBIR Phase I · National Aeronautics and Space Administration · 2019 · $125,000
Aug 19, 2019 – Feb 18, 2020
Solicitation SBIR_19_P1 (2019) · Topic S3
Unmanned Aerial Systems Pitch Day
SBIR Phase I · Department of Defense (Air Force) · 2019 · $75,000
Jul 24, 2019 – Dec 24, 2019
Solicitation 19.2 (2019) · Topic AF192-006
Process to Mitigate Catastrophic Optical Damage to Quantum Cascade Lasers
STTR Phase I · Department of Defense (Navy) · 2019 · $140,000
Jun 17, 2019 – Dec 17, 2019
Solicitation 19.A (2019) · Topic N19A-T004 · Research partner: University of Wisconsin Madison
Integrated Photon Management for Multijunction Solar Cells
SBIR Phase II · Department of Defense (Air Force) · 2019 · $750,000
Nov 28, 2018 – Nov 28, 2020
Solicitation 17.1 (2017) · Topic AF171-072
High Yield, High Efficiency Epitaxial Lift-Off Solar Cells for LILT Applications
SBIR Phase I · National Aeronautics and Space Administration · 2018 · $125,000
Jul 27, 2018 – Feb 15, 2019
Solicitation SBIR_18_P1 (2018) · Topic S3
Lightweight Dual Junction Radiation Hardened Solar Cells
SBIR Phase I · Department of Defense (Air Force) · 2018 · $150,000
Jul 24, 2018 – Jul 24, 2019
Solicitation 2018.1 (2018) · Topic AF181-040
Radiation Tolerant >35% Efficient Phosphide-Based Multi-Junction Solar Cells with Epitaxial Lift-Off
SBIR Phase II · National Aeronautics and Space Administration · 2018 · $750,000
Apr 9, 2018 – Apr 8, 2020
Solicitation SBIR_17_P2 (2017) · Topic S3
Novel, High-Efficiency, Light-weight, Flexible Solar Cells as Electrical Power Generation Source
STTR Phase II · Department of Defense (Navy) · 2018 · $749,999
Mar 26, 2018 – Apr 2, 2020
Solicitation 16.A (2016) · Topic N16A-T006 · Research partner: University of Maryland Unmanned Aircraft Systems Test Site
Showing the 25 most recent of 99 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 334413Semiconductor and Related Device ManufacturingPrimarySmall business under this code’s size standard
- 334419Other Electronic Component ManufacturingSmall business under this code’s size standard
- 541713Research and Development in NanotechnologySmall business under this code’s size standard
SAM.gov reports this entity as small under 3 of 3 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with MICROLINK DEVICES INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
