M4 ENGINEERING, INC.
Doing business as M4 ENGINEERING INC
- LONG BEACH, CA 90807-2683
- m4-engineering.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $17.5M
- Awards on record
- 18
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
M4 ENGINEERING, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About M4 ENGINEERING, INC.
- Headquarters
- LONG BEACH, CA 90807-2683
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIDM3EW67JLQM1
- CAGE3LGZ2
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $17.5M
- Awards on record
- 18
- Top funding agencies
- National Aeronautics and Space Administration · Missile Defense Agency · Department of the Air Force
Awards
FA820325C0022
Recompete 18+ mo: Potential end Mar 31, 2029 (28 months away)A AS LANDING GEAR ENGINEERING SERVICES ANALYSIS
Department of Defense · Department of the Air Force
- Obligated
- $1.9M
- Period of performance
- Sep 29, 2025 – Mar 31, 2029
80NSSC27C0049
Recompete 18+ mo: Potential end Nov 3, 2028 (23 months away)SBIR PHASE II - PYFOIL81: ROTORCRAFT DESIGN TOOL AIRFOIL TABLE GENERATOR
National Aeronautics and Space Administration
- Obligated
- $1.3M
- Period of performance
- Nov 4, 2026 – Nov 3, 2028
HQ086026CE014
Recompete 18+ mo: Potential end Jul 14, 2028 (20 months away)SBIR PH 2 ADVANCED CARBON-CARBON COMPOSITES FOR AEROSPACE STRUCTURES
Department of Defense · Missile Defense Agency
- Obligated
- $4.9M
- Period of performance
- Jul 15, 2026 – Jul 14, 2028
80NSSC26C0443
Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)PHASE III - IXGEN,
National Aeronautics and Space Administration
- Obligated
- $250K
- Period of performance
- Sep 30, 2026 – Sep 30, 2027
80NSSC25C0005
Recompete 6–12 mo: Potential end Jul 9, 2027 (7 months away)PHASE II SBIR 80NSSC25C0005 UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDED VERSION CONTROL
National Aeronautics and Space Administration
- Obligated
- $850K
- Period of performance
- Jul 10, 2025 – Jul 9, 2027
80NSSC26C0268
Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)SBIR PHASE I AGENTIC FRAMEWORK FOR PRECISION COMPOSITE OPTOMECHANICAL HARDWARE
National Aeronautics and Space Administration
- Obligated
- $225K
- Period of performance
- Sep 30, 2026 – Mar 30, 2027
N6833523C0317
Completed: Period of performance ended Aug 4, 2026RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
- Obligated
- $1.3M
- Period of performance
- Aug 8, 2023 – Aug 4, 2026
N6833526C0029
Completed: Period of performance ended Apr 20, 2026RESEARCH AND DEVELOPMENT.
Department of Defense · Department of the Navy
- Obligated
- $140K
- Period of performance
- Oct 14, 2025 – Apr 20, 2026
80NSSC25C0243
Completed: Period of performance ended Mar 27, 2026SBIR I PYFOIL81: ROTORCRAFT DESIGN TOOL AIRFOIL TABLE GENERATOR
National Aeronautics and Space Administration
- Obligated
- $150K
- Period of performance
- Sep 29, 2025 – Mar 27, 2026
HQ086024C7611
Completed: Period of performance ended Mar 6, 2026STTR PHASE II R&D
Department of Defense · Missile Defense Agency
- Obligated
- $1.5M
- Period of performance
- Mar 7, 2024 – Mar 6, 2026
80NSSC24CA025
Completed: Period of performance ended Jan 28, 2026STTR PHASE II TOPOLOGY OPTIMIZATION FOR DESIGN OF HIGHLY TAILORED COMPOSITES FOR AFP MANUFACTURING
National Aeronautics and Space Administration
- Obligated
- $850K
- Period of performance
- Jan 29, 2024 – Jan 28, 2026
N6833525C0447
Completed: Period of performance ended Dec 29, 2025RESEARCH AND DEVELOPMENT.
Department of Defense · Department of the Navy
- Obligated
- $140K
- Period of performance
- Jul 2, 2025 – Dec 29, 2025
80GRC023CA047
Completed: Period of performance ended May 1, 2025NASA MODEL-BASED SYSTEMS ANALYSIS AND ENGINEERING (MBSA&E) FOR THE SUSTAINABLE FLIGHT NATIONAL PARTNERSHIP (SFNP) PHASE 1
National Aeronautics and Space Administration
- Obligated
- $450K
- Period of performance
- Oct 1, 2023 – May 1, 2025
80NSSC24PB365
Completed: Period of performance ended Feb 6, 2025FY24 SBIR PHASE I- UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDED VERSION CONTROL
National Aeronautics and Space Administration
- Obligated
- $150K
- Period of performance
- Aug 7, 2024 – Feb 6, 2025
80NSSC20C0019
Completed: Period of performance ended Jun 16, 2024NOVEL ASE SCALED MODEL DESIGN, FABRICATION, AND TESTING
National Aeronautics and Space Administration
- Obligated
- $1.1M
- Period of performance
- Dec 20, 2019 – Jun 16, 2024
80NSSC20C0210
Completed: Period of performance ended May 24, 2024GENERATIVE ADVERSARIAL NETWORKS FOR REAL-TIME REALISTIC PHYSICS SIMULATIONS
National Aeronautics and Space Administration
- Obligated
- $1.1M
- Period of performance
- Sep 25, 2020 – May 24, 2024
FA864922P0973
Completed: Period of performance ended Feb 6, 2024PHYSICS-BASED STRUCTURAL ANALYSIS MODEL DEVELOPMENT AND INTEGRATION WITH COMPUTATIONAL AIRCRAFT PROTOTYPE SYNTHESES
Department of Defense · Department of the Air Force
- Obligated
- $1.2M
- Period of performance
- May 6, 2022 – Feb 6, 2024
SP470122P0064
Completed: Period of performance ended Feb 28, 2023BASE AWARD FOR SBIR I PROPOSAL L221-007-0129 ENTITLED "RESIN PROCESS RESEARCH & SCALE-UP FOR AEROSPACE CARBON-CARBON COMPOSITE STRUCTURES".
Department of Defense · Defense Logistics Agency
- Obligated
- $100K
- Period of performance
- Aug 31, 2022 – Feb 28, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
FA820325C0022 A AS LANDING GEAR ENGINEERING SERVICES ANALYSIS | Department of Defense · Department of the Air Force | 541330 · 1620AIRCRAFT LANDING GEAR COMPONENTS | $1.9M | Sep 29, 2025 – Mar 31, 2029 | Recompete 18+ mo: Potential end Mar 31, 2029 (28 months away) |
80NSSC27C0049 SBIR PHASE II - PYFOIL81: ROTORCRAFT DESIGN TOOL AIRFOIL TABLE GENERATOR | National Aeronautics and Space Administration | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $1.3M | Nov 4, 2026 – Nov 3, 2028 | Recompete 18+ mo: Potential end Nov 3, 2028 (23 months away) |
HQ086026CE014 SBIR PH 2 ADVANCED CARBON-CARBON COMPOSITES FOR AEROSPACE STRUCTURES | Department of Defense · Missile Defense Agency | 541715 · AC13NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; EXPERIMENTAL DEVELOPMENT | $4.9M | Jul 15, 2026 – Jul 14, 2028 | Recompete 18+ mo: Potential end Jul 14, 2028 (20 months away) |
80NSSC26C0443 PHASE III - IXGEN, | National Aeronautics and Space Administration | 541715 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $250K | Sep 30, 2026 – Sep 30, 2027 | Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)AI brief for award 80NSSC26C0443Bid team for the recompete of award 80NSSC26C0443 |
80NSSC25C0005 PHASE II SBIR 80NSSC25C0005 UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDED VERSION CONTROL | National Aeronautics and Space Administration | 541713 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $850K | Jul 10, 2025 – Jul 9, 2027 | Recompete 6–12 mo: Potential end Jul 9, 2027 (7 months away)AI brief for award 80NSSC25C0005Bid team for the recompete of award 80NSSC25C0005 |
80NSSC26C0268 SBIR PHASE I AGENTIC FRAMEWORK FOR PRECISION COMPOSITE OPTOMECHANICAL HARDWARE | National Aeronautics and Space Administration | 541713 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $225K | Sep 30, 2026 – Mar 30, 2027 | Recompete < 6 mo: Potential end Mar 30, 2027 (4 months away)AI brief for award 80NSSC26C0268Bid team for the recompete of award 80NSSC26C0268 |
N6833523C0317 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH | $1.3M | Aug 8, 2023 – Aug 4, 2026 | Completed: Period of performance ended Aug 4, 2026 |
N6833526C0029 RESEARCH AND DEVELOPMENT. | Department of Defense · Department of the Navy | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $140K | Oct 14, 2025 – Apr 20, 2026 | Completed: Period of performance ended Apr 20, 2026 |
80NSSC25C0243 SBIR I PYFOIL81: ROTORCRAFT DESIGN TOOL AIRFOIL TABLE GENERATOR | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Sep 29, 2025 – Mar 27, 2026 | Completed: Period of performance ended Mar 27, 2026 |
HQ086024C7611 STTR PHASE II R&D | Department of Defense · Missile Defense Agency | 541715 · AC13NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; EXPERIMENTAL DEVELOPMENT | $1.5M | Mar 7, 2024 – Mar 6, 2026 | Completed: Period of performance ended Mar 6, 2026 |
80NSSC24CA025 STTR PHASE II TOPOLOGY OPTIMIZATION FOR DESIGN OF HIGHLY TAILORED COMPOSITES FOR AFP MANUFACTURING | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $850K | Jan 29, 2024 – Jan 28, 2026 | Completed: Period of performance ended Jan 28, 2026 |
N6833525C0447 RESEARCH AND DEVELOPMENT. | Department of Defense · Department of the Navy | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $140K | Jul 2, 2025 – Dec 29, 2025 | Completed: Period of performance ended Dec 29, 2025 |
80GRC023CA047 NASA MODEL-BASED SYSTEMS ANALYSIS AND ENGINEERING (MBSA&E) FOR THE SUSTAINABLE FLIGHT NATIONAL PARTNERSHIP (SFNP) PHASE 1 | National Aeronautics and Space Administration | 541715 · AS23TRANSPORTATION R&D SERVICES; AEROSPACE RESEARCH; EXPERIMENTAL DEVELOPMENT | $450K | Oct 1, 2023 – May 1, 2025 | Completed: Period of performance ended May 1, 2025 |
80NSSC24PB365 FY24 SBIR PHASE I- UAM DESIGN SPACE EXPLORATION FRAMEWORK WITH EMBEDDED VERSION CONTROL | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Aug 7, 2024 – Feb 6, 2025 | Completed: Period of performance ended Feb 6, 2025 |
80NSSC20C0019 NOVEL ASE SCALED MODEL DESIGN, FABRICATION, AND TESTING | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $1.1M | Dec 20, 2019 – Jun 16, 2024 | Completed: Period of performance ended Jun 16, 2024 |
80NSSC20C0210 GENERATIVE ADVERSARIAL NETWORKS FOR REAL-TIME REALISTIC PHYSICS SIMULATIONS | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $1.1M | Sep 25, 2020 – May 24, 2024 | Completed: Period of performance ended May 24, 2024 |
FA864922P0973 PHYSICS-BASED STRUCTURAL ANALYSIS MODEL DEVELOPMENT AND INTEGRATION WITH COMPUTATIONAL AIRCRAFT PROTOTYPE SYNTHESES | Department of Defense · Department of the Air Force | 541715 · AC32NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; APPLIED RESEARCH | $1.2M | May 6, 2022 – Feb 6, 2024 | Completed: Period of performance ended Feb 6, 2024 |
SP470122P0064 BASE AWARD FOR SBIR I PROPOSAL L221-007-0129 ENTITLED "RESIN PROCESS RESEARCH & SCALE-UP FOR AEROSPACE CARBON-CARBON COMPOSITE STRUCTURES". | Department of Defense · Defense Logistics Agency | 541715 · AC33NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; EXPERIMENTAL DEVELOPMENT | $100K | Aug 31, 2022 – Feb 28, 2023 | Completed: Period of performance ended Feb 28, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 83 awards
- Total awarded
- $30,897,265
- By phase
- SBIR Phase I: 36
- SBIR Phase II: 20
- STTR Phase I: 19
- STTR Phase II: 8
- By agency
- Department of Defense: 48
- National Aeronautics and Space Administration: 35
- Active projects
- 1 project
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 1 project
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2026: 1
- 2025: 3
- 2024: 3
- 2023: 4
- 2022: 5
- 2021: 4
- 2020: 6
- 2019: 3
- 2018: 2
- 2017: 1
- 2016: 3
- 2015: 5
- 2014: 5
- 2013: 5
- 2012: 3
- 2011: 2
- 2010: 5
- 2009: 4
- 2008: 5
- 2007: 4
- 2006: 4
- 2005: 3
- 2004: 3
Awards (most recent first)
Hypersonic Computational Fluid Dynamics Heat Flux Sub-Models
STTR Phase I · Department of Defense (Navy) · 2026 · $239,999
Oct 14, 2025 – Apr 20, 2026
Solicitation 25.B (2025) · Topic N25B-T033 · Research partner: MIT
PyFoil81: Rotorcraft Design Tool Airfoil Table Generator
SBIR Phase I · National Aeronautics and Space Administration · 2025 · $149,991
Sep 17, 2025 – Mar 27, 2026
Solicitation SBIR 2025-I (2025) · Topic A1
UAM Design Space Exploration Framework with Embedded Version Control
SBIR Phase II · National Aeronautics and Space Administration · 2025 · $849,987
Jul 10, 2025 – Jul 9, 2027
- Active
- Ends Jul 2027
Solicitation SBIR 2024-II (2024) · Topic A1
High-Fidelity Computational Modeling of Fluid-Thermal-Structural Interactions in Hypersonic Air-Breathing Systems
STTR Phase I · Department of Defense (Navy) · 2025 · $139,997
Jul 2, 2025 – Dec 29, 2025
Solicitation 25.A (2025) · Topic N25A-T001 · Research partner: Virginia Tech
UAM Design Space Exploration Framework with Embedded Version Control
SBIR Phase I · National Aeronautics and Space Administration · 2024 · $149,989
Aug 8, 2024 – Feb 6, 2025
Solicitation SBIR-2024-Phase 1 (2024) · Topic A1
Low Cost Carbon-Carbon Development for Hypersonic Flight Systems
STTR Phase II · Department of Defense (Missile Defense Agency) · 2024 · $1,493,773
Mar 7, 2024 – Mar 6, 2026
Solicitation 22.B (2022) · Topic MDA22-T013 · Research partner: Mississippi State University
Topology Optimization for Design of Highly Tailored Composites for AFP Manufacturing
STTR Phase II · National Aeronautics and Space Administration · 2024 · $849,994
Jan 29, 2024 – Jan 28, 2026
Solicitation STTR_22_P2 (2022) · Topic T12 · Research partner: Virginia Tech
Embedded Aircraft Design Geometry in Multidisciplinary Design Optimization Frameworks
SBIR Phase II · Department of Defense (Navy) · 2023 · $1,299,956
Aug 8, 2023 – Aug 4, 2026
Solicitation 22.1 (2022) · Topic N221-004
Unsteady Metric-based Adaptation via Koopman Expansion of the Feature Field
STTR Phase I · National Aeronautics and Space Administration · 2023 · $149,995
Jul 26, 2023 – Sep 2, 2024
Solicitation STTR_23_P1 (2023) · Topic T9 · Research partner: Virginia Tech
Friction Drilling Fasteners for Composite Structures
SBIR Phase I · Department of Defense (Navy) · 2023 · $139,991
Jun 22, 2023 – Dec 22, 2023
Solicitation 23.1 (2023) · Topic N231-026
Low Cost Carbon-Carbon Development for Hypersonic Flight Systems
STTR Phase I · Department of Defense (Missile Defense Agency) · 2023 · $149,991
Nov 23, 2022 – May 22, 2023
Solicitation 22.B (2022) · Topic MDA22-T013 · Research partner: Mississippi State University
Resin Process Research & Scale-up for Aerospace Carbon-Carbon Composite Structures
SBIR Phase I · Department of Defense (Defense Logistics Agency) · 2022 · $99,988
Aug 31, 2022 – Mar 1, 2023
Solicitation 22.2 (2022) · Topic DLA222-007
Underwater Blast Lung Computational Model
SBIR Phase II · Department of Defense (Defense Health Agency) · 2022 · $1,096,364
Aug 18, 2022 – Dec 21, 2024
Solicitation 21.1 (2021) · Topic DHA211-003
Topology Optimization for Design of Highly Tailored Composites for AFP Manufacturing
STTR Phase I · National Aeronautics and Space Administration · 2022 · $149,980
Jul 11, 2022 – Aug 25, 2023
Solicitation STTR_22_P1 (2022) · Topic T12 · Research partner: Virginia Tech
Embedded Aircraft Design Geometry in Multidisciplinary Design Optimization Frameworks
SBIR Phase I · Department of Defense (Navy) · 2022 · $239,977
Jun 29, 2022 – Aug 7, 2023
Solicitation 22.1 (2022) · Topic N221-004
Physics-Based Structural Analysis Model Development and Integration with CAPS
SBIR Phase II · Department of Defense (Air Force) · 2022 · $1,249,994
May 6, 2022 – Feb 6, 2024
- Direct to Phase II
Solicitation X22.1 (2022) · Topic AF221-DCSO1
Underwater Blast Lung Computational Model
SBIR Phase I · Department of Defense (Defense Health Agency) · 2021 · $249,972
Jul 26, 2021 – Feb 25, 2022
Solicitation 21.1 (2021) · Topic DHA211-003
Aeroelasticity and Aeroservoelastic Control
SBIR Phase II · National Aeronautics and Space Administration · 2021 · $749,935
Jul 8, 2021 – Jul 7, 2023
Solicitation SBIR_20_P2 (2020) · Topic A1
Low Cost Carbon-Carbon Composites for Hot Structures
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,619
May 10, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic H5
Design Tools for Advanced Tailorable Composites
STTR Phase I · National Aeronautics and Space Administration · 2021 · $124,956
May 10, 2021 – Jun 19, 2022
Solicitation STTR_21_P1 (2021) · Topic T12 · Research partner: Virginia Tech
Lightweight Conformal Structures
SBIR Phase II · National Aeronautics and Space Administration · 2020 · $749,993
Sep 25, 2020 – Sep 24, 2022
Solicitation SBIR_19_P2 (2019) · Topic Z4
Advanced Propulsion Systems Ground Test Technology
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $124,906
Aug 25, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic H10
Aeroelasticity and Aeroservoelastic Control
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $124,968
Aug 20, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic A1
Finite Element Method (FEM) for Bonded Repair Design
SBIR Phase I · Department of Defense (Air Force) · 2020 · $149,894
Apr 27, 2020 – Apr 27, 2021
Solicitation 19.3 (2019) · Topic AF193-024
Hexahedral Dominant Auto-Mesh Generator
STTR Phase I · Department of Defense (Navy) · 2020 · $140,000
Apr 18, 2020 – Oct 26, 2020
Solicitation 20.A (2020) · Topic N20A-T004 · Research partner: Virginia Tech
Showing the 25 most recent of 83 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 541420Industrial Design ServicesSmall business under this code’s size standard
- 541512Computer Systems Design ServicesSmall business under this code’s size standard
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
SAM.gov reports this entity as small under 2 of 4 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with M4 ENGINEERING, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
