PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
- MENTOR, OH 44060-1837
- pinnacleconstruction.bz (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $89M
- Awards on record
- 35
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
- Headquarters
- MENTOR, OH 44060-1837
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIDRLTAXYFZBK8
- CAGE3V7Z3
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $89M
- Awards on record
- 35
- Top funding agencies
- National Aeronautics and Space Administration · Public Buildings Service · Department of the Air Force
25 most recent of 35 awards
80GSFC26F7042
Recompete 12–18 mo: Potential end Dec 23, 2027 (13 months away)UPGRADE DOMESTIC WATER SYSTEM, PHASE 1
National Aeronautics and Space Administration
- Obligated
- $6.5M
- Period of performance
- Sep 29, 2026 – Dec 23, 2027
80GRC026F7053
Recompete 12–18 mo: Potential end Nov 16, 2027 (12 months away)PROJECT 33294 FY26 STEAM MANHOLE REPAIRS
National Aeronautics and Space Administration
- Obligated
- $567.1K
- Period of performance
- Aug 18, 2026 – Nov 16, 2027
80GRC024F0070
Recompete 6–12 mo: Potential end Aug 30, 2027 (9 months away)PROJECT 33153 B37 CONVERT MOTORS FOR POWER FACTOR CORRECTION.
National Aeronautics and Space Administration
- Obligated
- $407.7K
- Period of performance
- Aug 30, 2024 – Aug 30, 2027
80GRC026F7046
Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)ERB & B64 BASEMENT PIPING REPLACEMENT
National Aeronautics and Space Administration
- Obligated
- $2.5M
- Period of performance
- Jul 20, 2026 – Jul 31, 2027
80GRC025F7063
Recompete 6–12 mo: Potential end Jun 10, 2027 (6 months away)PROJECT 33233 ATF CRYOGENIC FACILITY
National Aeronautics and Space Administration
- Obligated
- $9.5M
- Period of performance
- Sep 22, 2025 – Jun 10, 2027
47PE5626F0276
Recompete 6–12 mo: Potential end May 30, 2027 (6 months away)AWARD - GARAGE DRAINAGE SYSTEM REPAIR FOR THE JOHN WELD PECK FEDERAL BUILDING, 550 MAIN STREET, CINCINNATI, OH
General Services Administration · Public Buildings Service
- Obligated
- $856.5K
- Period of performance
- May 26, 2026 – May 30, 2027
47PB5226C0006
Recompete < 6 mo: Potential end May 4, 2027 (5 months away)INTERIOR RENOVATION FOR THE DEPARTMENT OF STATE, PASSPORT OFFICE ON THE 2ND AND 3RD FLOORS OF THE JOHN WELD PECK FEDERAL BUILDING IN…
General Services Administration · Public Buildings Service
- Obligated
- $7.5M
- Period of performance
- Feb 17, 2026 – May 4, 2027
80GRC026F7012
Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)PROJECT 29835 REPAIR STORM SEWERS PHASE 3
National Aeronautics and Space Administration
- Obligated
- $6.1M
- Period of performance
- Feb 24, 2026 – Mar 31, 2027
W50S8Q25CA001
Recompete < 6 mo: Potential end Nov 13, 2026 (under a month away)ANG SEEKS BIDS TO MODERNIZE BLDG 128: HVAC, POWER, IDS (ADVANTOR COMPATIBLE), INTERIOR REMODEL, RF SHIELDING, BATH RENOVATION, SEWER…
Department of Defense · Department of the Army
- Obligated
- $3.7M
- Period of performance
- Sep 24, 2025 – Nov 13, 2026
FA860124F0056
Completed: Period of performance ended Sep 30, 2026MACC PROJECT 100138 - REPAIR TO RELOCATE/REMOVE ELECTRICAL DISTRIBUTION SWITCH
Department of Defense · Department of the Air Force
- Obligated
- $2.8M
- Period of performance
- May 20, 2024 – Sep 30, 2026
47PF0025C0027
Completed: Period of performance ended Sep 16, 2026NITROGREN GENERATOR AND DRY PIPE REPLACEMENT PROJECT AT THE JOSEPH KINNEARY FEDERAL BUILDING, COLUMBUS, OHIO
General Services Administration · Public Buildings Service
- Obligated
- $1.7M
- Period of performance
- Sep 17, 2025 – Sep 16, 2026
80GRC024F0059
Completed: Period of performance ended Sep 14, 2026PROJECT 33085 REPAIR ANTIQUATED HV CABLE PHASE 2
National Aeronautics and Space Administration
- Obligated
- $7.1M
- Period of performance
- Sep 4, 2024 – Sep 14, 2026
FA860125F0130
Completed: Period of performance ended Jul 7, 2026MACC PROJECT 19-0019 RENOVATE RESEARCH LAB FOR BREWS-C F20654
Department of Defense · Department of the Air Force
- Obligated
- $3M
- Period of performance
- May 30, 2025 – Jul 7, 2026
FA860125F0103
Completed: Period of performance ended Jun 3, 2026MACC PROJECT 21-0325; REPAIR STEAM TUNNEL, AREA B , F6101
Department of Defense · Department of the Air Force
- Obligated
- $1.8M
- Period of performance
- Apr 25, 2025 – Jun 3, 2026
80GRC025F7044
Completed: Period of performance ended Apr 30, 2026PROJECT 33242 B330 LAB GROUNDING.
National Aeronautics and Space Administration
- Obligated
- $159.3K
- Period of performance
- Jul 15, 2025 – Apr 30, 2026
47PF0025F0649
Completed: Period of performance ended Mar 23, 2026DEMOLITION AND ABATEMENT FOR THE DEPARTMENT OF STATE, PASSPORT OFFICE ON THE 2ND AND 3RD FLOORS OF THE JOHN WELD PECK FEDERAL BUILDING IN…
General Services Administration · Public Buildings Service
- Obligated
- $753.7K
- Period of performance
- Sep 18, 2025 – Mar 23, 2026
80GRC020F0194
Completed: Period of performance ended Mar 14, 2026NEAT PUMP RELOCATION
National Aeronautics and Space Administration
- Obligated
- $7.7M
- Period of performance
- Aug 21, 2020 – Mar 14, 2026
80GRC024F0060
Completed: Period of performance ended Feb 16, 2026PROJECT 33172 FY24 HVAC & PLUMBING REPAIRS PHASE 1
National Aeronautics and Space Administration
- Obligated
- $343.1K
- Period of performance
- Aug 20, 2024 – Feb 16, 2026
80GRC023F0088
Completed: Period of performance ended Jan 16, 2026PROJECT 33131 B77 ROOF AND B340 ROOF AND HVAC
National Aeronautics and Space Administration
- Obligated
- $4.1M
- Period of performance
- Aug 2, 2023 – Jan 16, 2026
80GRC024F0049
Completed: Period of performance ended Jul 1, 2025PROJECT 33174 FY24 PAVEMENT MAINTENANCE.
National Aeronautics and Space Administration
- Obligated
- $245.8K
- Period of performance
- Jul 16, 2024 – Jul 1, 2025
80GRC024F0046
Completed: Period of performance ended Jun 18, 2025PROJECT 33005 B90 DC PANEL REPLACEMENT
National Aeronautics and Space Administration
- Obligated
- $58.9K
- Period of performance
- Jun 28, 2024 – Jun 18, 2025
80GRC020F0207
Completed: Period of performance ended May 30, 2025J6 TRANSFORMER
National Aeronautics and Space Administration
- Obligated
- $4.8M
- Period of performance
- Sep 9, 2020 – May 30, 2025
80GRC024F0048
Completed: Period of performance ended May 2, 2025PROJECT 33195 ALTITUDE EXHAUST SUPPORT BENT REPAIRS
National Aeronautics and Space Administration
- Obligated
- $166.9K
- Period of performance
- Jul 11, 2024 – May 2, 2025
80GRC023F0085
Completed: Period of performance ended May 2, 2025PROJECT 33115 CPS 150PSIG BLOWDOWN- NOISE ABATEMENT
National Aeronautics and Space Administration
- Obligated
- $601.5K
- Period of performance
- Aug 1, 2023 – May 2, 2025
80GRC022F0162
Completed: Period of performance ended Apr 4, 2025GMACC-2 TASK ORDER FOR PROJECT 29918 NEAT WP #1- PINNACLE - NEW AWARD
National Aeronautics and Space Administration
- Obligated
- $1.4M
- Period of performance
- Sep 12, 2022 – Apr 4, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
80GSFC26F7042 under 80GRC020D0012 UPGRADE DOMESTIC WATER SYSTEM, PHASE 1 | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $6.5M | Sep 29, 2026 – Dec 23, 2027 | Recompete 12–18 mo: Potential end Dec 23, 2027 (13 months away)AI brief for award 80GSFC26F7042Bid team for the recompete of award 80GSFC26F7042 |
80GRC026F7053 under 80GRC020D0012 PROJECT 33294 FY26 STEAM MANHOLE REPAIRS | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $567.1K | Aug 18, 2026 – Nov 16, 2027 | Recompete 12–18 mo: Potential end Nov 16, 2027 (12 months away)AI brief for award 80GRC026F7053Bid team for the recompete of award 80GRC026F7053 |
80GRC024F0070 under 80GRC020D0012 PROJECT 33153 B37 CONVERT MOTORS FOR POWER FACTOR CORRECTION. | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $407.7K | Aug 30, 2024 – Aug 30, 2027 | Recompete 6–12 mo: Potential end Aug 30, 2027 (9 months away)AI brief for award 80GRC024F0070Bid team for the recompete of award 80GRC024F0070 |
80GRC026F7046 under 80GRC020D0012 ERB & B64 BASEMENT PIPING REPLACEMENT | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $2.5M | Jul 20, 2026 – Jul 31, 2027 | Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)AI brief for award 80GRC026F7046Bid team for the recompete of award 80GRC026F7046 |
80GRC025F7063 under 80GRC020D0012 PROJECT 33233 ATF CRYOGENIC FACILITY | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $9.5M | Sep 22, 2025 – Jun 10, 2027 | Recompete 6–12 mo: Potential end Jun 10, 2027 (6 months away)AI brief for award 80GRC025F7063Bid team for the recompete of award 80GRC025F7063 |
47PE5626F0276 under 47PF0024D0051 AWARD - GARAGE DRAINAGE SYSTEM REPAIR FOR THE JOHN WELD PECK FEDERAL BUILDING, 550 MAIN STREET, CINCINNATI, OH | General Services Administration · Public Buildings Service | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $856.5K | May 26, 2026 – May 30, 2027 | Recompete 6–12 mo: Potential end May 30, 2027 (6 months away)AI brief for award 47PE5626F0276Bid team for the recompete of award 47PE5626F0276 |
47PB5226C0006 INTERIOR RENOVATION FOR THE DEPARTMENT OF STATE, PASSPORT OFFICE ON THE 2ND AND 3RD FLOORS OF THE JOHN WELD PECK FEDERAL BUILDING IN… | General Services Administration · Public Buildings Service | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $7.5M | Feb 17, 2026 – May 4, 2027 | Recompete < 6 mo: Potential end May 4, 2027 (5 months away)AI brief for award 47PB5226C0006Bid team for the recompete of award 47PB5226C0006 |
80GRC026F7012 under 80GRC020D0012 PROJECT 29835 REPAIR STORM SEWERS PHASE 3 | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $6.1M | Feb 24, 2026 – Mar 31, 2027 | Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)AI brief for award 80GRC026F7012Bid team for the recompete of award 80GRC026F7012 |
W50S8Q25CA001 ANG SEEKS BIDS TO MODERNIZE BLDG 128: HVAC, POWER, IDS (ADVANTOR COMPATIBLE), INTERIOR REMODEL, RF SHIELDING, BATH RENOVATION, SEWER… | Department of Defense · Department of the Army | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $3.7M | Sep 24, 2025 – Nov 13, 2026 | Recompete < 6 mo: Potential end Nov 13, 2026 (under a month away)AI brief for award W50S8Q25CA001Bid team for the recompete of award W50S8Q25CA001 |
FA860124F0056 under FA860121D0013 MACC PROJECT 100138 - REPAIR TO RELOCATE/REMOVE ELECTRICAL DISTRIBUTION SWITCH | Department of Defense · Department of the Air Force | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $2.8M | May 20, 2024 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
47PF0025C0027 NITROGREN GENERATOR AND DRY PIPE REPLACEMENT PROJECT AT THE JOSEPH KINNEARY FEDERAL BUILDING, COLUMBUS, OHIO | General Services Administration · Public Buildings Service | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $1.7M | Sep 17, 2025 – Sep 16, 2026 | Completed: Period of performance ended Sep 16, 2026 |
80GRC024F0059 under 80GRC020D0012 PROJECT 33085 REPAIR ANTIQUATED HV CABLE PHASE 2 | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $7.1M | Sep 4, 2024 – Sep 14, 2026 | Completed: Period of performance ended Sep 14, 2026 |
FA860125F0130 under FA860121D0013 MACC PROJECT 19-0019 RENOVATE RESEARCH LAB FOR BREWS-C F20654 | Department of Defense · Department of the Air Force | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $3M | May 30, 2025 – Jul 7, 2026 | Completed: Period of performance ended Jul 7, 2026 |
FA860125F0103 under FA860121D0013 MACC PROJECT 21-0325; REPAIR STEAM TUNNEL, AREA B , F6101 | Department of Defense · Department of the Air Force | 236220 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $1.8M | Apr 25, 2025 – Jun 3, 2026 | Completed: Period of performance ended Jun 3, 2026 |
80GRC025F7044 under 80GRC020D0012 PROJECT 33242 B330 LAB GROUNDING. | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $159.3K | Jul 15, 2025 – Apr 30, 2026 | Completed: Period of performance ended Apr 30, 2026 |
47PF0025F0649 under 47PF0024D0051 DEMOLITION AND ABATEMENT FOR THE DEPARTMENT OF STATE, PASSPORT OFFICE ON THE 2ND AND 3RD FLOORS OF THE JOHN WELD PECK FEDERAL BUILDING IN… | General Services Administration · Public Buildings Service | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $753.7K | Sep 18, 2025 – Mar 23, 2026 | Completed: Period of performance ended Mar 23, 2026 |
80GRC020F0194 under 80GRC020D0012 NEAT PUMP RELOCATION | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $7.7M | Aug 21, 2020 – Mar 14, 2026 | Completed: Period of performance ended Mar 14, 2026 |
80GRC024F0060 under 80GRC020D0012 PROJECT 33172 FY24 HVAC & PLUMBING REPAIRS PHASE 1 | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $343.1K | Aug 20, 2024 – Feb 16, 2026 | Completed: Period of performance ended Feb 16, 2026 |
80GRC023F0088 under 80GRC020D0012 PROJECT 33131 B77 ROOF AND B340 ROOF AND HVAC | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $4.1M | Aug 2, 2023 – Jan 16, 2026 | Completed: Period of performance ended Jan 16, 2026 |
80GRC024F0049 under 80GRC020D0012 PROJECT 33174 FY24 PAVEMENT MAINTENANCE. | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $245.8K | Jul 16, 2024 – Jul 1, 2025 | Completed: Period of performance ended Jul 1, 2025 |
80GRC024F0046 under 80GRC020D0012 PROJECT 33005 B90 DC PANEL REPLACEMENT | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $58.9K | Jun 28, 2024 – Jun 18, 2025 | Completed: Period of performance ended Jun 18, 2025 |
80GRC020F0207 under 80GRC020D0012 J6 TRANSFORMER | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $4.8M | Sep 9, 2020 – May 30, 2025 | Completed: Period of performance ended May 30, 2025 |
80GRC024F0048 under 80GRC020D0012 PROJECT 33195 ALTITUDE EXHAUST SUPPORT BENT REPAIRS | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $166.9K | Jul 11, 2024 – May 2, 2025 | Completed: Period of performance ended May 2, 2025 |
80GRC023F0085 under 80GRC020D0012 PROJECT 33115 CPS 150PSIG BLOWDOWN- NOISE ABATEMENT | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $601.5K | Aug 1, 2023 – May 2, 2025 | Completed: Period of performance ended May 2, 2025 |
80GRC022F0162 under 80GRC020D0012 GMACC-2 TASK ORDER FOR PROJECT 29918 NEAT WP #1- PINNACLE - NEW AWARD | National Aeronautics and Space Administration | 236220 · Y1HBCONSTRUCTION OF GOVERNMENT-OWNED GOVERNMENT-OPERATED (GOGO) R&D FACILITIES | $1.4M | Sep 12, 2022 – Apr 4, 2025 | Completed: Period of performance ended Apr 4, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimarySmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237120Oil and Gas Pipeline and Related Structures ConstructionSmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 237210Title not in the curated listSmall business under this code’s size standard
- 237310Highway, Street, and Bridge ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure ContractorsSmall business under this code’s size standard
- 238120Structural Steel and Precast Concrete ContractorsSmall business under this code’s size standard
- 238130Title not in the curated listSmall business under this code’s size standard
- 238140Title not in the curated listSmall business under this code’s size standard
- 238150Title not in the curated listSmall business under this code’s size standard
- 238160Roofing ContractorsSmall business under this code’s size standard
- 238170Title not in the curated listSmall business under this code’s size standard
- 238190Other Foundation, Structure, and Building Exterior ContractorsSmall business under this code’s size standard
- 238210Electrical Contractors and Other Wiring Installation ContractorsSmall business under this code’s size standard
- 238220Plumbing, Heating, and Air-Conditioning ContractorsSmall business under this code’s size standard
- 238290Other Building Equipment ContractorsSmall business under this code’s size standard
- 238310Drywall and Insulation ContractorsSmall business under this code’s size standard
- 238320Painting and Wall Covering ContractorsSmall business under this code’s size standard
- 238330Flooring ContractorsSmall business under this code’s size standard
- 238340Title not in the curated listSmall business under this code’s size standard
- 238350Finish Carpentry ContractorsSmall business under this code’s size standard
- 238390Other Building Finishing ContractorsSmall business under this code’s size standard
- 238910Site Preparation ContractorsSmall business under this code’s size standard
- 238990All Other Specialty Trade Contractors
- 333120Title not in the curated listSmall business under this code’s size standard
- 561210Facilities Support ServicesSmall business under this code’s size standard
- 561591Title not in the curated listSmall business under this code’s size standard
- 561720Janitorial ServicesSmall business under this code’s size standard
- 561730Landscaping Services
- 561790Other Services to Buildings and Dwellings
- 562112Hazardous Waste CollectionSmall business under this code’s size standard
- 562211Hazardous Waste Treatment and DisposalSmall business under this code’s size standard
- 562910Remediation Services
- 562920Materials Recovery FacilitiesSmall business under this code’s size standard
- 812930Title not in the curated listSmall business under this code’s size standard
SAM.gov reports this entity as small under 33 of 38 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
