CUSA CONSULTING LLC
Doing business as CUSA CONSULTING
- HAMPTON, NH 03842
- cusaconsulting.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Women-Owned Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $65.7M
- Awards on record
- 111
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
CUSA CONSULTING LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About CUSA CONSULTING LLC
- Headquarters
- HAMPTON, NH 03842
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIE2W6TRUP2FA8
- CAGE1YRY5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $65.7M
- Awards on record
- 111
- Top funding agencies
- Federal Aviation Administration
25 most recent of 111 awards
6973GH26F01372
Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)TRAVEL, SITE SURVEY REPORT AND DESIGNS FOR THE DC BUS DEMO ONLY BASELINE FOR MEMPHIS, TN (MEME) RCAG JCN: 26002752
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Sep 7, 2026 – Sep 30, 2027
6973GH25F01356
Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)SITE SURVEY TRAVEL, REPORT AND DESIGN FOR OUTDOOR EG WITH SUBBASE TANK AT STEWART AIRPORT, NY (SWF) ALS JCN:19006023
Department of Transportation · Federal Aviation Administration
- Obligated
- $30.9K
- Period of performance
- Sep 9, 2025 – Aug 31, 2027
6973GH26F01369
Recompete 6–12 mo: Potential end Aug 30, 2027 (9 months away)SITE SURVEY, TRAVEL AND SITE SURVEY REPORT FOR THE DC BUS DEMO ONLY AT LONDON, KY (LOZA) RCAG JCN: 26003843
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Sep 7, 2026 – Aug 30, 2027
6973GH25F01256
Recompete 6–12 mo: Potential end Aug 29, 2027 (9 months away)F&E FUNDED DESIGN POWER HARDENING, SITE SPECIFIC: GREAT INAGUA, BH (ZIN) RCAG, JCN:25015111, PER ELD PMO.
Department of Transportation · Federal Aviation Administration
- Obligated
- $793.9K
- Period of performance
- Aug 15, 2025 – Aug 29, 2027
6973GH26F00166
Recompete 6–12 mo: Potential end Aug 18, 2027 (9 months away)F&E FUNDED INTEGRATION - (SJU) MICROGRID-ERMS INTEGRATION SUPPORT, SITE SPECIFIC: SAN JUAN, PR (SJU), JCN:22003195, PER AES/ERMS PMO.
Department of Transportation · Federal Aviation Administration
- Obligated
- $89.3K
- Period of performance
- Dec 8, 2025 – Aug 18, 2027
6973GH24F01117
Recompete 6–12 mo: Potential end Jul 9, 2027 (7 months away)21002784 ELD BIL SEATTLE, WASHINGTON (SEA) WSA IN THE AMOUNT OF $55,381.20 FOR THE CUSA CONSULTING, LLC DESIGN PROJECT.
Department of Transportation · Federal Aviation Administration
- Obligated
- $543.7K
- Period of performance
- Jul 8, 2024 – Jul 9, 2027
6973GH26F01231
Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)ACEPS II PHASE 2 BOSTON ARTCC (ZBW) PERMANENT DESIGN, BASED ON THE RE-DESIGN SCOPE OF WORK DATED APRIL 13, 2026. ADDITIONALLY, DESIGNING…
Department of Transportation · Federal Aviation Administration
- Obligated
- $1.4M
- Period of performance
- Aug 10, 2026 – Jun 30, 2027
6973GH25C00069
Recompete 6–12 mo: Potential end Jun 24, 2027 (7 months away)SAIPAN ASR SITE AND EQUIPMENT BUILDING CONSTRUCTION PROJECT PHASE 1
Department of Transportation · Federal Aviation Administration
- Obligated
- $6.6M
- Period of performance
- Feb 4, 2025 – Jun 24, 2027
6973GH27F00044
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)IIJA LPGBS MODERNIZATION, CO-LOCATION UPGRADE OF EG-UPS POWER SYSTEMS WITH NDP AT SAIPAN OBYAN, GU JCN: 26005295
Department of Transportation · Federal Aviation Administration
- Obligated
- $56.8K
- Period of performance
- Oct 29, 2026 – Apr 30, 2027
6973GH26F01407
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)EG SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 INDOOR EG BASELINE FOR SEATTLE, WA (SEAC) RCAG JCN:1506486
Department of Transportation · Federal Aviation Administration
- Obligated
- $36.7K
- Period of performance
- Sep 10, 2026 – Apr 30, 2027
6973GH26F01410
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)SITE SURVEY TRAVEL, REPORT AND DESIGNS FOR THE 2025 OUTDOOR EG BASELINE AT MILWAUKEE, WI (MKEH) GS JCN: 236164
Department of Transportation · Federal Aviation Administration
- Obligated
- $30.9K
- Period of performance
- Sep 10, 2026 – Apr 30, 2027
6973GH26F01411
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)SITE SURVEY TRAVEL, REPORT AND DESIGNS FOR THE 2024 DC BUS DEMO ONLY BASELINE AT SAINT ALBANS, ME (BGRB) RCAG JCN: 26003839
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Sep 10, 2026 – Apr 30, 2027
6973GH26F01412
Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)SITE SURVEY TRAVEL, REPORT AND DESIGN FOR 2024 DC BUE DEMO ONLY BASELINE FOR COLUMBIA, ME (QEB) RCAG JCN: 26003841
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Sep 10, 2026 – Apr 30, 2027
6973GH25F01227
Recompete < 6 mo: Potential end Apr 15, 2027 (5 months away)F&E FUNDED DESIGN POWER HARDENING SYSTEM, SITE SPECIFIC: GEORGETOWN, GRAND TURKS ISLAND (FK7) ATCBI JCN: 25015097, PER ELD PMO.
Department of Transportation · Federal Aviation Administration
- Obligated
- $345.2K
- Period of performance
- Aug 11, 2025 – Apr 15, 2027
6973GH26F00267
Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT GADSDEN, AL (GAD) RCAG JCN: 24016476
Department of Transportation · Federal Aviation Administration
- Obligated
- $156.8K
- Period of performance
- Jan 14, 2026 – Mar 31, 2027
6973GH26F00714
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)F&E FUNDED INSTALLATION - ELD MEDIUM VOLTAGE EQUIPMENT ELEVATION AT (MIA)ELD IN MIAMI, FL, MIAMI INTERNATIONAL AIRPORT, JCN: 25020578
Department of Transportation · Federal Aviation Administration
- Obligated
- $290.5K
- Period of performance
- Apr 21, 2026 – Dec 31, 2026
6973GH25F00712
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)IIJA FUNDS. ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS AT COLUMBUS, MS (UBS) RCAG JCN 24016509
Department of Transportation · Federal Aviation Administration
- Obligated
- $240.3K
- Period of performance
- Apr 14, 2025 – Dec 31, 2026
6973GH24F01210
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT MANCHESTER, NH (MHTA) ALS JCN:…
Department of Transportation · Federal Aviation Administration
- Obligated
- $388.7K
- Period of performance
- Jul 30, 2024 – Dec 31, 2026
6973GH23F01806
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)BIL FUNDING, SITE SURVEY, DESIGN, AND INSTALLATION FOR EG REPLACEMENT FOR CHESTERFIELD, MO (SUS) ATCT JCN: 19003451
Department of Transportation · Federal Aviation Administration
- Obligated
- $541.9K
- Period of performance
- Sep 5, 2023 – Dec 31, 2026
6973GH25F01070
Completed: Period of performance ended Nov 6, 2026CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) CONSTRUCTION AT FT LAUDERDALE FL FLL ATCT JCN: 25016389
Department of Transportation · Federal Aviation Administration
- Obligated
- $1.1M
- Period of performance
- Aug 6, 2025 – Nov 6, 2026
6973GH26F00134
Completed: Period of performance ended Nov 2, 2026NAVAID AND IIJA FUNDED MALSR TOWER REPLACEMENT/INSTALLATION, SITE SPECIFIC: ALBANY, NY (DEJ) MALSR JCN: 23001675 - 808603, PER ELD PMO.
Department of Transportation · Federal Aviation Administration
- Obligated
- $2.1M
- Period of performance
- Dec 11, 2025 – Nov 2, 2026
6973GH26F00535
Completed: Period of performance ended Oct 31, 2026IIJA FUNDS. SITE SPECIFIC COST FOR THE EG, FST AND ERMS FUNDING AT BARROW, AK (BRW) VOR JCN:22002684
Department of Transportation · Federal Aviation Administration
- Obligated
- $713K
- Period of performance
- Mar 12, 2026 – Oct 31, 2026
6973GH26F00268
Completed: Period of performance ended Oct 31, 2026EG FUNDED.EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT HUNTSVILLE, AL (HSVD) RTR…
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Jan 15, 2026 – Oct 31, 2026
6973GH26F00273
Completed: Period of performance ended Oct 31, 2026EG FUNDED. EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT TUPELO, MS (TUP) RCAG JCN:…
Department of Transportation · Federal Aviation Administration
- Obligated
- $17.9K
- Period of performance
- Jan 15, 2026 – Oct 31, 2026
6973GH26F00255
Completed: Period of performance ended Oct 31, 2026EG FUNDED. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECTS AT PITTSBURGH, PA (LXBB) LOC JCN: 19007407
Department of Transportation · Federal Aviation Administration
- Obligated
- $30.9K
- Period of performance
- Jan 12, 2026 – Oct 31, 2026
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
6973GH26F01372 under 6973GH22D00010 TRAVEL, SITE SURVEY REPORT AND DESIGNS FOR THE DC BUS DEMO ONLY BASELINE FOR MEMPHIS, TN (MEME) RCAG JCN: 26002752 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Sep 7, 2026 – Sep 30, 2027 | Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)AI brief for award 6973GH26F01372Bid team for the recompete of award 6973GH26F01372 |
6973GH25F01356 under 6973GH22D00010 SITE SURVEY TRAVEL, REPORT AND DESIGN FOR OUTDOOR EG WITH SUBBASE TANK AT STEWART AIRPORT, NY (SWF) ALS JCN:19006023 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $30.9K | Sep 9, 2025 – Aug 31, 2027 | Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)AI brief for award 6973GH25F01356Bid team for the recompete of award 6973GH25F01356 |
6973GH26F01369 under 6973GH22D00010 SITE SURVEY, TRAVEL AND SITE SURVEY REPORT FOR THE DC BUS DEMO ONLY AT LONDON, KY (LOZA) RCAG JCN: 26003843 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Sep 7, 2026 – Aug 30, 2027 | Recompete 6–12 mo: Potential end Aug 30, 2027 (9 months away)AI brief for award 6973GH26F01369Bid team for the recompete of award 6973GH26F01369 |
6973GH25F01256 under 6973GH22D00010 F&E FUNDED DESIGN POWER HARDENING, SITE SPECIFIC: GREAT INAGUA, BH (ZIN) RCAG, JCN:25015111, PER ELD PMO. | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $793.9K | Aug 15, 2025 – Aug 29, 2027 | Recompete 6–12 mo: Potential end Aug 29, 2027 (9 months away)AI brief for award 6973GH25F01256Bid team for the recompete of award 6973GH25F01256 |
6973GH26F00166 under 6973GH22D00010 F&E FUNDED INTEGRATION - (SJU) MICROGRID-ERMS INTEGRATION SUPPORT, SITE SPECIFIC: SAN JUAN, PR (SJU), JCN:22003195, PER AES/ERMS PMO. | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $89.3K | Dec 8, 2025 – Aug 18, 2027 | Recompete 6–12 mo: Potential end Aug 18, 2027 (9 months away)AI brief for award 6973GH26F00166Bid team for the recompete of award 6973GH26F00166 |
6973GH24F01117 under 6973GH22D00010 21002784 ELD BIL SEATTLE, WASHINGTON (SEA) WSA IN THE AMOUNT OF $55,381.20 FOR THE CUSA CONSULTING, LLC DESIGN PROJECT. | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $543.7K | Jul 8, 2024 – Jul 9, 2027 | Recompete 6–12 mo: Potential end Jul 9, 2027 (7 months away)AI brief for award 6973GH24F01117Bid team for the recompete of award 6973GH24F01117 |
6973GH26F01231 under 6973GH25D00063 ACEPS II PHASE 2 BOSTON ARTCC (ZBW) PERMANENT DESIGN, BASED ON THE RE-DESIGN SCOPE OF WORK DATED APRIL 13, 2026. ADDITIONALLY, DESIGNING… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $1.4M | Aug 10, 2026 – Jun 30, 2027 | Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AI brief for award 6973GH26F01231Bid team for the recompete of award 6973GH26F01231 |
6973GH25C00069 SAIPAN ASR SITE AND EQUIPMENT BUILDING CONSTRUCTION PROJECT PHASE 1 | Department of Transportation · Federal Aviation Administration | 236220 · Y1BCCONSTRUCTION OF RADAR AND NAVIGATIONAL FACILITIES | $6.6M | Feb 4, 2025 – Jun 24, 2027 | Recompete 6–12 mo: Potential end Jun 24, 2027 (7 months away)AI brief for award 6973GH25C00069Bid team for the recompete of award 6973GH25C00069 |
6973GH27F00044 under 6973GH22D00010 IIJA LPGBS MODERNIZATION, CO-LOCATION UPGRADE OF EG-UPS POWER SYSTEMS WITH NDP AT SAIPAN OBYAN, GU JCN: 26005295 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $56.8K | Oct 29, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH27F00044Bid team for the recompete of award 6973GH27F00044 |
6973GH26F01407 under 6973GH22D00010 EG SITE SURVEY TRAVEL, REPORT AND DESIGN FOR THE 2025 INDOOR EG BASELINE FOR SEATTLE, WA (SEAC) RCAG JCN:1506486 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $36.7K | Sep 10, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH26F01407Bid team for the recompete of award 6973GH26F01407 |
6973GH26F01410 under 6973GH22D00010 SITE SURVEY TRAVEL, REPORT AND DESIGNS FOR THE 2025 OUTDOOR EG BASELINE AT MILWAUKEE, WI (MKEH) GS JCN: 236164 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $30.9K | Sep 10, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH26F01410Bid team for the recompete of award 6973GH26F01410 |
6973GH26F01411 under 6973GH22D00010 SITE SURVEY TRAVEL, REPORT AND DESIGNS FOR THE 2024 DC BUS DEMO ONLY BASELINE AT SAINT ALBANS, ME (BGRB) RCAG JCN: 26003839 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Sep 10, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH26F01411Bid team for the recompete of award 6973GH26F01411 |
6973GH26F01412 under 6973GH22D00010 SITE SURVEY TRAVEL, REPORT AND DESIGN FOR 2024 DC BUE DEMO ONLY BASELINE FOR COLUMBIA, ME (QEB) RCAG JCN: 26003841 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Sep 10, 2026 – Apr 30, 2027 | Recompete < 6 mo: Potential end Apr 30, 2027 (5 months away)AI brief for award 6973GH26F01412Bid team for the recompete of award 6973GH26F01412 |
6973GH25F01227 under 6973GH22D00010 F&E FUNDED DESIGN POWER HARDENING SYSTEM, SITE SPECIFIC: GEORGETOWN, GRAND TURKS ISLAND (FK7) ATCBI JCN: 25015097, PER ELD PMO. | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $345.2K | Aug 11, 2025 – Apr 15, 2027 | Recompete < 6 mo: Potential end Apr 15, 2027 (5 months away)AI brief for award 6973GH25F01227Bid team for the recompete of award 6973GH25F01227 |
6973GH26F00267 under 6973GH22D00010 EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT GADSDEN, AL (GAD) RCAG JCN: 24016476 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $156.8K | Jan 14, 2026 – Mar 31, 2027 | Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)AI brief for award 6973GH26F00267Bid team for the recompete of award 6973GH26F00267 |
6973GH26F00714 under 6973GH22D00010 F&E FUNDED INSTALLATION - ELD MEDIUM VOLTAGE EQUIPMENT ELEVATION AT (MIA)ELD IN MIAMI, FL, MIAMI INTERNATIONAL AIRPORT, JCN: 25020578 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $290.5K | Apr 21, 2026 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH26F00714Bid team for the recompete of award 6973GH26F00714 |
6973GH25F00712 under 6973GH22D00010 IIJA FUNDS. ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND REMOVAL AND DISPOSAL OF AST AND EG SYSTEMS AT COLUMBUS, MS (UBS) RCAG JCN 24016509 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $240.3K | Apr 14, 2025 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH25F00712Bid team for the recompete of award 6973GH25F00712 |
6973GH24F01210 under 6973GH22D00010 BIL: ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT MANCHESTER, NH (MHTA) ALS JCN:… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $388.7K | Jul 30, 2024 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH24F01210Bid team for the recompete of award 6973GH24F01210 |
6973GH23F01806 under 6973GH22D00010 BIL FUNDING, SITE SURVEY, DESIGN, AND INSTALLATION FOR EG REPLACEMENT FOR CHESTERFIELD, MO (SUS) ATCT JCN: 19003451 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $541.9K | Sep 5, 2023 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH23F01806Bid team for the recompete of award 6973GH23F01806 |
6973GH25F01070 under 6973GH22D00010 CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) CONSTRUCTION AT FT LAUDERDALE FL FLL ATCT JCN: 25016389 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $1.1M | Aug 6, 2025 – Nov 6, 2026 | Completed: Period of performance ended Nov 6, 2026 |
6973GH26F00134 under 6973GH22D00010 NAVAID AND IIJA FUNDED MALSR TOWER REPLACEMENT/INSTALLATION, SITE SPECIFIC: ALBANY, NY (DEJ) MALSR JCN: 23001675 - 808603, PER ELD PMO. | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $2.1M | Dec 11, 2025 – Nov 2, 2026 | Completed: Period of performance ended Nov 2, 2026 |
6973GH26F00535 under 6973GH22D00010 IIJA FUNDS. SITE SPECIFIC COST FOR THE EG, FST AND ERMS FUNDING AT BARROW, AK (BRW) VOR JCN:22002684 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $713K | Mar 12, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH26F00268 under 6973GH22D00010 EG FUNDED.EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT HUNTSVILLE, AL (HSVD) RTR… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Jan 15, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH26F00273 under 6973GH22D00010 EG FUNDED. EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR EG PMO LED POWER SYSTEM REPLACEMENT PROJECT AT TUPELO, MS (TUP) RCAG JCN:… | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $17.9K | Jan 15, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
6973GH26F00255 under 6973GH22D00010 EG FUNDED. SITE SURVEY TRAVEL, REPORT AND DESIGN FOR EG PO LED POWER SYSTEM REPLACEMENT PROJECTS AT PITTSBURGH, PA (LXBB) LOC JCN: 19007407 | Department of Transportation · Federal Aviation Administration | 238210 · N059INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $30.9K | Jan 12, 2026 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237130Power and Communication Line and Related Structures ConstructionPrimarySmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 237120Oil and Gas Pipeline and Related Structures ConstructionSmall business under this code’s size standard
- 238210Electrical Contractors and Other Wiring Installation Contractors
- 238220Plumbing, Heating, and Air-Conditioning Contractors
- 541330Engineering Services
- 541611Administrative Management and General Management Consulting Services
- 541614Process, Physical Distribution, and Logistics Consulting Services
- 541690Other Scientific and Technical Consulting Services
SAM.gov reports this entity as small under 3 of 9 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Self-represented in SAM.gov. WOSB and EDWOSB set-asides need SBA certification (13 CFR 127.300); SDVOSB and VOSB need SBA VetCert (13 CFR part 128). Confirm current certification before relying on it.
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with CUSA CONSULTING LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
