SCHULTE CONSTRUCTION, INC.
- IBERIA, MO 65486-8211
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $3.1M
- Awards on record
- 37
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
SCHULTE CONSTRUCTION, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About SCHULTE CONSTRUCTION, INC.
- Headquarters
- IBERIA, MO 65486-8211
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIE657TKHJUTG9
- CAGE1UF93
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $3.1M
- Awards on record
- 37
- Top funding agencies
- Department of the Army
25 most recent of 37 awards
W911S726FA202
Recompete < 6 mo: Potential end Jan 26, 2027 (2 months away)THE WORK TO BE PERFORMED WILL INCLUDE, PLACE CONCRETE PADS WITH WALLS FOR 6 PORTA POTTY ON RANGES…
Department of Defense · Department of the Army
- Obligated
- $231.5K
- Period of performance
- Jul 27, 2026 – Jan 26, 2027
W911S726FA203
Recompete < 6 mo: Potential end Nov 27, 2026 (under a month away)THE WORK TO BE PERFORMED WILL INCLUDE, REMOVE OLD ASPHALT BY BASEMENT DOOR, NORTH/EAST SIDE. PLACE SMALL WALL AND SWELL FOR STORM WATER…
Department of Defense · Department of the Army
- Obligated
- $6K
- Period of performance
- Jul 27, 2026 – Nov 27, 2026
W911S726FA120
Completed: Period of performance ended Nov 1, 2026CONTRACTOR SHALL REMOVE EXCESS BUILT UP SOIL AND SHAPE DITCH ALLOWING FOR BETTER RUN OFF. REMOVE CONCRETE SIDEWALK AND REPLACE CULVERT AT…
Department of Defense · Department of the Army
- Obligated
- $8K
- Period of performance
- Apr 30, 2026 – Nov 1, 2026
W911S725FA345
Completed: Period of performance ended Oct 1, 2026DEMO AND REPLACE CONCRETE AT BLDGS. 815, 816, 817, 818, 819. NEW CURB, GUTTER, AND CONCRETE FLUME (DITCH).
Department of Defense · Department of the Army
- Obligated
- $393K
- Period of performance
- Sep 30, 2025 – Oct 1, 2026
W911S725FA346
Completed: Period of performance ended Oct 1, 2026DEMO AND REPLACE CONCRETE AT BLDGS. 826, 827, 828.
Department of Defense · Department of the Army
- Obligated
- $395K
- Period of performance
- Sep 30, 2025 – Oct 1, 2026
W911S725FA347
Completed: Period of performance ended Oct 1, 2026DEMO AND REPLACE CONCRETE AT BLDGS. 829, 830, 831, 832, 835. CURB, GUTTER, AND STEPS.
Department of Defense · Department of the Army
- Obligated
- $367.1K
- Period of performance
- Sep 30, 2025 – Oct 1, 2026
W911S725FA302
Completed: Period of performance ended Aug 31, 2026REPAIR SIDE STREETS AT RV PARK ON INDIANA AVE.
Department of Defense · Department of the Army
- Obligated
- $124.9K
- Period of performance
- Sep 10, 2025 – Aug 31, 2026
W911S725FA348
Completed: Period of performance ended Aug 1, 2026DEMO AND REPLACE CONCRETE AT BLDGS. 580A, 600MP, 800MP, 885, BUCKEYE, INDIANA. NEW CURB, GUTTER, CONCRETE, AND BOLLARDS.
Department of Defense · Department of the Army
- Obligated
- $115K
- Period of performance
- Sep 30, 2025 – Aug 1, 2026
W911S725FA334
Completed: Period of performance ended Jun 5, 2026BLDG. 408 PLAYGROUND SWING CONCRETE BORDER
Department of Defense · Department of the Army
- Obligated
- $31.8K
- Period of performance
- Oct 6, 2025 – Jun 5, 2026
W911S725FA364
Completed: Period of performance ended Jun 5, 2026PLACE CONCRETE PAD ALONG BLDG. 2200. EXCAVATE FOUR FOOTERS APPROXIMATELY 18 INCHES IN DEPTH FOR A FUTURE 20.5 X 12.5 STRUCTURE.
Department of Defense · Department of the Army
- Obligated
- $8.1K
- Period of performance
- Sep 30, 2025 – Jun 5, 2026
W911S726FA084
Completed: Period of performance ended Apr 12, 2026THE PURPOSE OF THIS TASK ORDER IS TO REIMBURSE P AND P BONDS FOR DELIVERY ORDER #S - W911S725FA334, 25FA302, 25FA345, 25FA346, 25FA347,…
Department of Defense · Department of the Army
- Obligated
- $16.5K
- Period of performance
- Mar 12, 2026 – Apr 12, 2026
W911S725FA358
Completed: Period of performance ended Apr 1, 2026PLACE 8-INCH THICK CONCRETE PAD ON DIRT LOT SURROUNDING BLDG. 5052. TOTAL PAD AREA IS 13,868 SQ. FT.
Department of Defense · Department of the Army
- Obligated
- $169.9K
- Period of performance
- Sep 30, 2025 – Apr 1, 2026
W911S725FA272
Completed: Period of performance ended Jan 12, 2026REPLACE CULVERTS SOUTH OF BLDGS. 614 + 615.
Department of Defense · Department of the Army
- Obligated
- $75K
- Period of performance
- Aug 13, 2025 – Jan 12, 2026
W911S725FA248
Completed: Period of performance ended Oct 27, 2025RANGE 14 - CONSTRUCT WALKWAY + STEPS
Department of Defense · Department of the Army
- Obligated
- $24.5K
- Period of performance
- Jul 28, 2025 – Oct 27, 2025
W911S725FA266
Completed: Period of performance ended Oct 8, 2025REPAIR SIDEWALKS AT BLDG. 318
Department of Defense · Department of the Army
- Obligated
- $7.3K
- Period of performance
- Aug 8, 2025 – Oct 8, 2025
W911S725FA267
Completed: Period of performance ended Oct 8, 2025REPAIR SIDEWALKS AT BLDG. 5465
Department of Defense · Department of the Army
- Obligated
- $4.6K
- Period of performance
- Aug 8, 2025 – Oct 8, 2025
W911S725FA054
Completed: Period of performance ended Jul 23, 2025PLACE CONCRETE PAD FOR MAILBOXES ON DEPUTY STREET
Department of Defense · Department of the Army
- Obligated
- $1.4K
- Period of performance
- Mar 24, 2025 – Jul 23, 2025
W911S725FA155
Completed: Period of performance ended Jul 13, 2025BLDG. 1785 POUR STATIC DISPLAY PAD
Department of Defense · Department of the Army
- Obligated
- $5.3K
- Period of performance
- May 15, 2025 – Jul 13, 2025
W911S725FA097
Completed: Period of performance ended Jul 10, 20255074 PARKING LOT REPAIR
Department of Defense · Department of the Army
- Obligated
- $34.5K
- Period of performance
- Apr 10, 2025 – Jul 10, 2025
W911S725FA016
Completed: Period of performance ended Jun 15, 2025REPAIR ALL SIDEWALKS AT BLDG. 470.
Department of Defense · Department of the Army
- Obligated
- $129.6K
- Period of performance
- Jan 23, 2025 – Jun 15, 2025
W911S725F0701
Completed: Period of performance ended May 25, 2025REPLACE LOW WATER CROSSING FLW 5
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- Nov 26, 2024 – May 25, 2025
W911S725F0702
Completed: Period of performance ended Apr 25, 2025INSTALL SIDEWALK BLDG. 648
Department of Defense · Department of the Army
- Obligated
- $4.8K
- Period of performance
- Nov 27, 2024 – Apr 25, 2025
W911S724F1511
Completed: Period of performance ended Mar 24, 2025R & R CONCRETE SIDEWALKS BLDG. 3223
Department of Defense · Department of the Army
- Obligated
- $43.1K
- Period of performance
- Sep 25, 2024 – Mar 24, 2025
W911S724F1510
Completed: Period of performance ended Nov 26, 2024BLDG. 9625 INSTALL SIDEWALK
Department of Defense · Department of the Army
- Obligated
- $27K
- Period of performance
- Aug 27, 2024 – Nov 26, 2024
W911S724F1509
Completed: Period of performance ended Nov 4, 2024SIDEWALK & STAIRS BLDG. 980
Department of Defense · Department of the Army
- Obligated
- $14.9K
- Period of performance
- Sep 4, 2024 – Nov 4, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W911S726FA202 under W911S726DA001 THE WORK TO BE PERFORMED WILL INCLUDE, PLACE CONCRETE PADS WITH WALLS FOR 6 PORTA POTTY ON RANGES… | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $231.5K | Jul 27, 2026 – Jan 26, 2027 | Recompete < 6 mo: Potential end Jan 26, 2027 (2 months away)AI brief for award W911S726FA202Bid team for the recompete of award W911S726FA202 |
W911S726FA203 under W911S726DA001 THE WORK TO BE PERFORMED WILL INCLUDE, REMOVE OLD ASPHALT BY BASEMENT DOOR, NORTH/EAST SIDE. PLACE SMALL WALL AND SWELL FOR STORM WATER… | Department of Defense · Department of the Army | 238110 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $6K | Jul 27, 2026 – Nov 27, 2026 | Recompete < 6 mo: Potential end Nov 27, 2026 (under a month away)AI brief for award W911S726FA203Bid team for the recompete of award W911S726FA203 |
W911S726FA120 under W911S726DA001 CONTRACTOR SHALL REMOVE EXCESS BUILT UP SOIL AND SHAPE DITCH ALLOWING FOR BETTER RUN OFF. REMOVE CONCRETE SIDEWALK AND REPLACE CULVERT AT… | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $8K | Apr 30, 2026 – Nov 1, 2026 | Completed: Period of performance ended Nov 1, 2026 |
W911S725FA345 under W911S723D0004 DEMO AND REPLACE CONCRETE AT BLDGS. 815, 816, 817, 818, 819. NEW CURB, GUTTER, AND CONCRETE FLUME (DITCH). | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $393K | Sep 30, 2025 – Oct 1, 2026 | Completed: Period of performance ended Oct 1, 2026 |
W911S725FA346 under W911S723D0004 DEMO AND REPLACE CONCRETE AT BLDGS. 826, 827, 828. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $395K | Sep 30, 2025 – Oct 1, 2026 | Completed: Period of performance ended Oct 1, 2026 |
W911S725FA347 under W911S723D0004 DEMO AND REPLACE CONCRETE AT BLDGS. 829, 830, 831, 832, 835. CURB, GUTTER, AND STEPS. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $367.1K | Sep 30, 2025 – Oct 1, 2026 | Completed: Period of performance ended Oct 1, 2026 |
W911S725FA302 under W911S723D0004 REPAIR SIDE STREETS AT RV PARK ON INDIANA AVE. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $124.9K | Sep 10, 2025 – Aug 31, 2026 | Completed: Period of performance ended Aug 31, 2026 |
W911S725FA348 under W911S723D0004 DEMO AND REPLACE CONCRETE AT BLDGS. 580A, 600MP, 800MP, 885, BUCKEYE, INDIANA. NEW CURB, GUTTER, CONCRETE, AND BOLLARDS. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $115K | Sep 30, 2025 – Aug 1, 2026 | Completed: Period of performance ended Aug 1, 2026 |
W911S725FA334 under W911S723D0004 BLDG. 408 PLAYGROUND SWING CONCRETE BORDER | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $31.8K | Oct 6, 2025 – Jun 5, 2026 | Completed: Period of performance ended Jun 5, 2026 |
W911S725FA364 under W911S723D0004 PLACE CONCRETE PAD ALONG BLDG. 2200. EXCAVATE FOUR FOOTERS APPROXIMATELY 18 INCHES IN DEPTH FOR A FUTURE 20.5 X 12.5 STRUCTURE. | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $8.1K | Sep 30, 2025 – Jun 5, 2026 | Completed: Period of performance ended Jun 5, 2026 |
W911S726FA084 under W911S723D0004 THE PURPOSE OF THIS TASK ORDER IS TO REIMBURSE P AND P BONDS FOR DELIVERY ORDER #S - W911S725FA334, 25FA302, 25FA345, 25FA346, 25FA347,… | Department of Defense · Department of the Army | 238110 · Z1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $16.5K | Mar 12, 2026 – Apr 12, 2026 | Completed: Period of performance ended Apr 12, 2026 |
W911S725FA358 under W911S723D0004 PLACE 8-INCH THICK CONCRETE PAD ON DIRT LOT SURROUNDING BLDG. 5052. TOTAL PAD AREA IS 13,868 SQ. FT. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $169.9K | Sep 30, 2025 – Apr 1, 2026 | Completed: Period of performance ended Apr 1, 2026 |
W911S725FA272 under W911S723D0004 REPLACE CULVERTS SOUTH OF BLDGS. 614 + 615. | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $75K | Aug 13, 2025 – Jan 12, 2026 | Completed: Period of performance ended Jan 12, 2026 |
W911S725FA248 under W911S723D0004 RANGE 14 - CONSTRUCT WALKWAY + STEPS | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $24.5K | Jul 28, 2025 – Oct 27, 2025 | Completed: Period of performance ended Oct 27, 2025 |
W911S725FA266 under W911S723D0004 REPAIR SIDEWALKS AT BLDG. 318 | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $7.3K | Aug 8, 2025 – Oct 8, 2025 | Completed: Period of performance ended Oct 8, 2025 |
W911S725FA267 under W911S723D0004 REPAIR SIDEWALKS AT BLDG. 5465 | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $4.6K | Aug 8, 2025 – Oct 8, 2025 | Completed: Period of performance ended Oct 8, 2025 |
W911S725FA054 under W911S723D0004 PLACE CONCRETE PAD FOR MAILBOXES ON DEPUTY STREET | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $1.4K | Mar 24, 2025 – Jul 23, 2025 | Completed: Period of performance ended Jul 23, 2025 |
W911S725FA155 under W911S723D0004 BLDG. 1785 POUR STATIC DISPLAY PAD | Department of Defense · Department of the Army | 238110 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $5.3K | May 15, 2025 – Jul 13, 2025 | Completed: Period of performance ended Jul 13, 2025 |
W911S725FA097 under W911S723D0004 5074 PARKING LOT REPAIR | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $34.5K | Apr 10, 2025 – Jul 10, 2025 | Completed: Period of performance ended Jul 10, 2025 |
W911S725FA016 under W911S723D0004 REPAIR ALL SIDEWALKS AT BLDG. 470. | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $129.6K | Jan 23, 2025 – Jun 15, 2025 | Completed: Period of performance ended Jun 15, 2025 |
W911S725F0701 under W911S723D0004 REPLACE LOW WATER CROSSING FLW 5 | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $0 | Nov 26, 2024 – May 25, 2025 | Completed: Period of performance ended May 25, 2025 |
W911S725F0702 under W911S723D0004 INSTALL SIDEWALK BLDG. 648 | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $4.8K | Nov 27, 2024 – Apr 25, 2025 | Completed: Period of performance ended Apr 25, 2025 |
W911S724F1511 under W911S723D0004 R & R CONCRETE SIDEWALKS BLDG. 3223 | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $43.1K | Sep 25, 2024 – Mar 24, 2025 | Completed: Period of performance ended Mar 24, 2025 |
W911S724F1510 under W911S723D0004 BLDG. 9625 INSTALL SIDEWALK | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $27K | Aug 27, 2024 – Nov 26, 2024 | Completed: Period of performance ended Nov 26, 2024 |
W911S724F1509 under W911S723D0004 SIDEWALK & STAIRS BLDG. 980 | Department of Defense · Department of the Army | 238110 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $14.9K | Sep 4, 2024 – Nov 4, 2024 | Completed: Period of performance ended Nov 4, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 238110Poured Concrete Foundation and Structure ContractorsPrimarySmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 238990All Other Specialty Trade Contractors
SAM.gov reports this entity as small under 2 of 3 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with SCHULTE CONSTRUCTION, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
