BRUCH & BRUCH CONSTRUCTION, INC
- PORT ANGELES, WA 98363-9458
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $6.2M
- Awards on record
- 7
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
BRUCH & BRUCH CONSTRUCTION, INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About BRUCH & BRUCH CONSTRUCTION, INC
- Headquarters
- PORT ANGELES, WA 98363-9458
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIE6SDFSH9YLK9
- CAGE1FKG9
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $6.2M
- Awards on record
- 7
- Top funding agencies
- Federal Highway Administration · Forest Service · National Park Service
Awards
1240BJ26F0016
Completed: Period of performance ended Oct 30, 2026PLACEMENT OF AGGREGATE SURFACING WHICH INCLUDES PREPARING ROADWAY SURFACE, HAULING, PLACING COMPACTING AND FINISHING CRUSHED AGGREGATE…
Department of Agriculture · Forest Service
- Obligated
- $498.4K
- Period of performance
- Jul 7, 2026 – Oct 30, 2026
69056726C000006
Completed: Period of performance ended Oct 20, 2026FUNDS CONSTRUCTION PROJECT WA ERFO FS OLYMP609 2022-1(1), OLYMPIC FS ERFO REPAIRS 2022. WORK INCLUDES ROADWAY RECONSTRUCTION, CULVERT…
Department of Transportation · Federal Highway Administration
- Obligated
- $3.8M
- Period of performance
- Jan 26, 2026 – Oct 20, 2026
1240BH23F0109
Completed: Period of performance ended Feb 21, 2025ROAD CONSTRUCTION R6 IDIQ GIFFORD PINCHOT AND OLYMPIC NATIONAL FORESTS - 29 RD OLYMPIC SEED TASK ORDER
Department of Agriculture · Forest Service
- Obligated
- $629.9K
- Period of performance
- Sep 27, 2023 – Feb 21, 2025
1240BJ24F0039
Completed: Period of performance ended Nov 1, 2024THIS PROJECT CONSISTS OF ROADWAY RECONDITIONING, ASPHALT PLACEMENT, AND TEMPORARY TRAFFIC CONTROL IN PREPARATION OF THE TRAVELED WAY FOR…
Department of Agriculture · Forest Service
- Obligated
- $1.2M
- Period of performance
- Aug 15, 2024 – Nov 1, 2024
140P8323F0047
Completed: Period of performance ended Nov 30, 2023EPREF, BPA CALL NUMBER 50B FOR QUARRY SPALLS, BALLAST JAW RUN 2-1/2" MINUS, AND CRUSHED SURFACING BASE COURSE 1-1/4" MINUS, MULTIPLE…
Department of the Interior · National Park Service
- Obligated
- $62.8K
- Period of performance
- Sep 1, 2023 – Nov 30, 2023
140P8323F0052
Completed: Period of performance ended Nov 30, 2023THIS BPA CALL NO. 54 IS AWARDED IN ACCORDANCE WITH THE TERMS OF BPA NO. 140P8318A0003/P0007, INCORPORATED HEREIN. DELIVERIES TO HOH PIT…
Department of the Interior · National Park Service
- Obligated
- $23.7K
- Period of performance
- Sep 1, 2023 – Nov 30, 2023
69056723C000019
Completed: Period of performance ended Oct 12, 2023WA FLAP JEFFER 150009(1), UNDI ROAD BYPASS IMPROVEMENTS. GRADING, DRAINAGE, BASE, CHIP SEAL IN JEFFERSON AND CLALLAM COUNTIES, WA
Department of Transportation · Federal Highway Administration
- Obligated
- $1.4M
- Period of performance
- Jun 13, 2023 – Oct 12, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
1240BJ26F0016 under 1240BH23D0035 PLACEMENT OF AGGREGATE SURFACING WHICH INCLUDES PREPARING ROADWAY SURFACE, HAULING, PLACING COMPACTING AND FINISHING CRUSHED AGGREGATE… | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $498.4K | Jul 7, 2026 – Oct 30, 2026 | Completed: Period of performance ended Oct 30, 2026 |
69056726C000006 FUNDS CONSTRUCTION PROJECT WA ERFO FS OLYMP609 2022-1(1), OLYMPIC FS ERFO REPAIRS 2022. WORK INCLUDES ROADWAY RECONSTRUCTION, CULVERT… | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $3.8M | Jan 26, 2026 – Oct 20, 2026 | Completed: Period of performance ended Oct 20, 2026 |
1240BH23F0109 under 1240BH23D0035 ROAD CONSTRUCTION R6 IDIQ GIFFORD PINCHOT AND OLYMPIC NATIONAL FORESTS - 29 RD OLYMPIC SEED TASK ORDER | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $629.9K | Sep 27, 2023 – Feb 21, 2025 | Completed: Period of performance ended Feb 21, 2025 |
1240BJ24F0039 under 1240BH23D0035 THIS PROJECT CONSISTS OF ROADWAY RECONDITIONING, ASPHALT PLACEMENT, AND TEMPORARY TRAFFIC CONTROL IN PREPARATION OF THE TRAVELED WAY FOR… | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.2M | Aug 15, 2024 – Nov 1, 2024 | Completed: Period of performance ended Nov 1, 2024 |
140P8323F0047 under 140P8318A0003 EPREF, BPA CALL NUMBER 50B FOR QUARRY SPALLS, BALLAST JAW RUN 2-1/2" MINUS, AND CRUSHED SURFACING BASE COURSE 1-1/4" MINUS, MULTIPLE… | Department of the Interior · National Park Service | 212321 · 5610MINERAL CONSTRUCTION MATERIALS, BULK | $62.8K | Sep 1, 2023 – Nov 30, 2023 | Completed: Period of performance ended Nov 30, 2023 |
140P8323F0052 under 140P8318A0003 THIS BPA CALL NO. 54 IS AWARDED IN ACCORDANCE WITH THE TERMS OF BPA NO. 140P8318A0003/P0007, INCORPORATED HEREIN. DELIVERIES TO HOH PIT… | Department of the Interior · National Park Service | 212321 · 5610MINERAL CONSTRUCTION MATERIALS, BULK | $23.7K | Sep 1, 2023 – Nov 30, 2023 | Completed: Period of performance ended Nov 30, 2023 |
69056723C000019 WA FLAP JEFFER 150009(1), UNDI ROAD BYPASS IMPROVEMENTS. GRADING, DRAINAGE, BASE, CHIP SEAL IN JEFFERSON AND CLALLAM COUNTIES, WA | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.4M | Jun 13, 2023 – Oct 12, 2023 | Completed: Period of performance ended Oct 12, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237310Highway, Street, and Bridge ConstructionPrimarySmall business under this code’s size standard
- 212319Title not in the curated listSmall business under this code’s size standard
- 212321Title not in the curated listSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 484220Specialized Freight (except Used Goods) Trucking, LocalSmall business under this code’s size standard
SAM.gov reports this entity as small under 4 of 5 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with BRUCH & BRUCH CONSTRUCTION, INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
