HDR GEI JOINT VENTURE
- FOLSOM, CA 95630
- Other
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $27.2M
- Awards on record
- 12
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
HDR GEI JOINT VENTURE has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About HDR GEI JOINT VENTURE
- Headquarters
- FOLSOM, CA 95630
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIEQ8XGH3KVER6
- CAGE8J2Q5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $27.2M
- Awards on record
- 12
- Top funding agencies
- Department of the Army
Awards
W912PL25F0026
Recompete 18+ mo: Potential end Dec 26, 2029 (37 months away)FY25 GEOTECH MATOC MINIMUM GUARANTEE
Department of Defense · Department of the Army
- Obligated
- $1K
- Period of performance
- Dec 27, 2024 – Dec 26, 2029
W9123825FA010
Recompete 18+ mo: Potential end Jul 10, 2029 (31 months away)PROJECT TITLE AND LOCATION: FOLSOM DAM RAISE PROJECT, MAIN DAM SPILLWAY EDC, FOLSOM, CALIFORNIA
Department of Defense · Department of the Army
- Obligated
- $383.1K
- Period of performance
- Jul 11, 2025 – Jul 10, 2029
W9123823F0015
Recompete 12–18 mo: Potential end Mar 31, 2028 (16 months away)PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES (ARCF) 2016 PROJECT, CIVIL AND FISH PASSAGE ENGINEERING DURING CONSTRUCTION…
Department of Defense · Department of the Army
- Obligated
- $6.5M
- Period of performance
- Apr 14, 2023 – Mar 31, 2028
W9123824F0002
Recompete 12–18 mo: Potential end Nov 30, 2027 (12 months away)PROJECT TITLE AND LOCATION: CROSSOVER AND RUN-AROUND TRACKS, MILITARY OCEAN TERMINAL CONCORD (MOTCO), CONCORD, CA
Department of Defense · Department of the Army
- Obligated
- $1.4M
- Period of performance
- Dec 7, 2023 – Nov 30, 2027
W9123825FA043
Recompete 12–18 mo: Potential end Nov 27, 2027 (12 months away)WATER CONTROL MANUAL (WCM) UPDATES FOR OROVILLE DAM, OROVILLE, CA AND NEW BULLARDS BAR DAM, DOBBINS, CA FY25
Department of Defense · Department of the Army
- Obligated
- $2M
- Period of performance
- Sep 22, 2025 – Nov 27, 2027
W9123825F0080
Recompete 6–12 mo: Potential end Jul 7, 2027 (7 months away)PROJECT TITLE AND LOCATION: SAN JOAQUIN RIVER BASIN, LOWER SAN JOAQUIN RIVER, FOURTEEN MILE SLOUGH CLOSURE STRUCTURE (FM_50L) STOCKTON,…
Department of Defense · Department of the Army
- Obligated
- $4M
- Period of performance
- Apr 16, 2025 – Jul 7, 2027
W9123824F0004
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)PROJECT TITLE AND LOCATION: MITIGATION DESIGN OF THE URRUTIA HABITAT RESTORATION AND ENHANCEMENT PROJECT ON THE LOWER AMERICAN RIVER IN…
Department of Defense · Department of the Army
- Obligated
- $3.7M
- Period of performance
- Nov 3, 2023 – May 31, 2027
W9123822F0004
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH A, CIVIL ENGINEERING SERVICES DURING CONSTRUCTION,…
Department of Defense · Department of the Army
- Obligated
- $1.2M
- Period of performance
- Nov 12, 2021 – May 31, 2027
W9123824F0047
Completed: Period of performance ended Sep 27, 2026PROJECT TITLE AND LOCATION: PROGRAMMATIC BASELINE WATER CONTROL MANUAL (WCM) UPDATES FOR BLACK BUTTE DAM, HIDDEN DAM, NEW HOGAN DAM,…
Department of Defense · Department of the Army
- Obligated
- $4.6M
- Period of performance
- Jul 23, 2024 – Sep 27, 2026
W912P723F0030
Completed: Period of performance ended May 11, 2026GOLDEN GATE NATIONAL CEMETERY ROAD IMPROVEMENT DESIGN
Department of Defense · Department of the Army
- Obligated
- $797.6K
- Period of performance
- Sep 1, 2023 – May 11, 2026
W912P722F0005
Completed: Period of performance ended Mar 13, 2026DESIGN OF IRRIGATION SYSTEM FOR GOLDEN GATE NATIONAL CEMETERY
Department of Defense · Department of the Army
- Obligated
- $1.3M
- Period of performance
- Apr 25, 2022 – Mar 13, 2026
W9123823F0060
Completed: Period of performance ended Oct 31, 2025PROJECT TITLE: PREPARATION OF WATER CONTROL MANUAL UPDATE MANAGEMENT PLANS FOR MULTIPLE DAMS TRUCKEE RIVER BASIN RESERVOIRS, NV&CA/PINE…
Department of Defense · Department of the Army
- Obligated
- $1.3M
- Period of performance
- Sep 8, 2023 – Oct 31, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W912PL25F0026 under W912PL25D0018 FY25 GEOTECH MATOC MINIMUM GUARANTEE | Department of Defense · Department of the Army | 541330 · C213ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | $1K | Dec 27, 2024 – Dec 26, 2029 | Recompete 18+ mo: Potential end Dec 26, 2029 (37 months away) |
W9123825FA010 under W9123821D0003 PROJECT TITLE AND LOCATION: FOLSOM DAM RAISE PROJECT, MAIN DAM SPILLWAY EDC, FOLSOM, CALIFORNIA | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $383.1K | Jul 11, 2025 – Jul 10, 2029 | Recompete 18+ mo: Potential end Jul 10, 2029 (31 months away) |
W9123823F0015 under W9123821D0003 PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES (ARCF) 2016 PROJECT, CIVIL AND FISH PASSAGE ENGINEERING DURING CONSTRUCTION… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $6.5M | Apr 14, 2023 – Mar 31, 2028 | Recompete 12–18 mo: Potential end Mar 31, 2028 (16 months away)AI brief for award W9123823F0015Bid team for the recompete of award W9123823F0015 |
W9123824F0002 under W9123821D0003 PROJECT TITLE AND LOCATION: CROSSOVER AND RUN-AROUND TRACKS, MILITARY OCEAN TERMINAL CONCORD (MOTCO), CONCORD, CA | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.4M | Dec 7, 2023 – Nov 30, 2027 | Recompete 12–18 mo: Potential end Nov 30, 2027 (12 months away)AI brief for award W9123824F0002Bid team for the recompete of award W9123824F0002 |
W9123825FA043 under W9123821D0003 WATER CONTROL MANUAL (WCM) UPDATES FOR OROVILLE DAM, OROVILLE, CA AND NEW BULLARDS BAR DAM, DOBBINS, CA FY25 | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2M | Sep 22, 2025 – Nov 27, 2027 | Recompete 12–18 mo: Potential end Nov 27, 2027 (12 months away)AI brief for award W9123825FA043Bid team for the recompete of award W9123825FA043 |
W9123825F0080 under W9123821D0003 PROJECT TITLE AND LOCATION: SAN JOAQUIN RIVER BASIN, LOWER SAN JOAQUIN RIVER, FOURTEEN MILE SLOUGH CLOSURE STRUCTURE (FM_50L) STOCKTON,… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $4M | Apr 16, 2025 – Jul 7, 2027 | Recompete 6–12 mo: Potential end Jul 7, 2027 (7 months away)AI brief for award W9123825F0080Bid team for the recompete of award W9123825F0080 |
W9123824F0004 under W9123821D0003 PROJECT TITLE AND LOCATION: MITIGATION DESIGN OF THE URRUTIA HABITAT RESTORATION AND ENHANCEMENT PROJECT ON THE LOWER AMERICAN RIVER IN… | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $3.7M | Nov 3, 2023 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award W9123824F0004Bid team for the recompete of award W9123824F0004 |
W9123822F0004 under W9123821D0003 PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH A, CIVIL ENGINEERING SERVICES DURING CONSTRUCTION,… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $1.2M | Nov 12, 2021 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award W9123822F0004Bid team for the recompete of award W9123822F0004 |
W9123824F0047 under W9123821D0003 PROJECT TITLE AND LOCATION: PROGRAMMATIC BASELINE WATER CONTROL MANUAL (WCM) UPDATES FOR BLACK BUTTE DAM, HIDDEN DAM, NEW HOGAN DAM,… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $4.6M | Jul 23, 2024 – Sep 27, 2026 | Completed: Period of performance ended Sep 27, 2026 |
W912P723F0030 under W9123821D0003 GOLDEN GATE NATIONAL CEMETERY ROAD IMPROVEMENT DESIGN | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $797.6K | Sep 1, 2023 – May 11, 2026 | Completed: Period of performance ended May 11, 2026 |
W912P722F0005 under W9123821D0003 DESIGN OF IRRIGATION SYSTEM FOR GOLDEN GATE NATIONAL CEMETERY | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.3M | Apr 25, 2022 – Mar 13, 2026 | Completed: Period of performance ended Mar 13, 2026 |
W9123823F0060 under W9123821D0003 PROJECT TITLE: PREPARATION OF WATER CONTROL MANUAL UPDATE MANAGEMENT PLANS FOR MULTIPLE DAMS TRUCKEE RIVER BASIN RESERVOIRS, NV&CA/PINE… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $1.3M | Sep 8, 2023 – Oct 31, 2025 | Completed: Period of performance ended Oct 31, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
No reported sub-awards as a subcontractor.
Subcontractors it has used
- LETTIS CONSULTANTS INTERNATIONAL INC
UEI TLL7DQAA66C9
$191.3K
Subcontracted by this company · 1 sub-award · latest Oct 2, 2025
- Department of the Army
- “SUBCONSULTANT SERVICES”
- GEOSYNTEC CONSULTANTS, INC.
UEI WCDLFALD62W9
$89K
Subcontracted by this company · 1 sub-award · latest Dec 23, 2025
- Department of the Army
- “FOLSOM DAM SPILLWAY EDC”
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with HDR GEI JOINT VENTURE?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
