
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
BERT CONSTRUCTION INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Awards
FA330026C0007
Completed: Period of performance ended Sep 3, 2026FY26 PNQS 26-3190 -SEWER LINE REPAIR BLDG 155
Department of Defense · Department of the Air Force
FA330026C0008
Completed: Period of performance ended Jun 25, 2026PNQS 269256 -REPAIR DRAIN LINE BLDG 1403
Department of Defense · Department of the Air Force
FA330025C0038
Completed: Period of performance ended May 28, 2026THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR PNQS 25-1844 TRAFFIC…
Department of Defense · Department of the Air Force
FA330025C0037
Completed: Period of performance ended Apr 14, 2026THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR JUBJ 25-1847 REPAIR…
Department of Defense · Department of the Air Force
FA330025C0060
Completed: Period of performance ended Mar 10, 2026REPAIR INTERIOR FLOOR BLDG 1431 IN ACCORDANCE WITH THE SUMMARY OF WORK (SOW) AND SUBJECT TO THE TERMS AND CONDITIONS OF THE CONTRACT.
Department of Defense · Department of the Air Force
FA330025C0053
Completed: Period of performance ended Jan 30, 2026OTS TRAINING SITE CONEX REPAIR: BERT CONSTRUCTION PROPOSAL DATED 11 SEPTEMBER 2025 IS HEREBY INCORPORATED BY REFERENCE.
Department of Defense · Department of the Air Force
FA330025C0052
Completed: Period of performance ended Jan 9, 2026FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH BUILDING 1403 (MAX) PLUMBING - SEWER…
Department of Defense · Department of the Air Force
FA330025C0056
Completed: Period of performance ended Nov 25, 2025CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO COMPLETE THE PAINT AND REFINISHING OF FAITH CHAPEL…
Department of Defense · Department of the Air Force
FA330025C0041
Completed: Period of performance ended Oct 27, 2025FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH MINOR INTERIOR REFRESH, BLDG 800 RM 254…
Department of Defense · Department of the Air Force
FA330025C0023
Completed: Period of performance ended Jun 30, 2025INSTALL 3 POWER LINES AND 4 ELECTRICAL OUTLETS IN BUILDING 714, MAXWELL AFB IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK (SOW).
Department of Defense · Department of the Air Force
FA330024C0054
Completed: Period of performance ended May 2, 2025FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REMOVE CARPET AND FINISH CONCRETE FLOOR IN THE BLDG. 800 BASEMENT AT MAXWELL AFB IAW…
Department of Defense · Department of the Air Force
FA330024C0062
Completed: Period of performance ended Mar 23, 2025AFLCMC HAS A REQUIREMENT TO PURCHASE AND INSTALL CARPET, AS WELL AS TO RENOVATE BOTH BUILDING 892 SUITE 110 AND THE AUDITORIUM.
Department of Defense · Department of the Air Force
FA330024C0055
Completed: Period of performance ended Feb 28, 2025THE WORK COVERED BY THESE SPECIFICATIONS CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS IN…
Department of Defense · Department of the Air Force
FA330024C0025
Completed: Period of performance ended Feb 28, 2025PROJECT TITLE: FY 24 PNQS 24-3706 REPAIR SEWER LINES
Department of Defense · Department of the Air Force
FA330024C0029
Completed: Period of performance ended Feb 11, 2025FY24 PNQS 24-3992 REPLACE LOCALIZER PAD, BLDG. 2076
Department of Defense · Department of the Air Force
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
FA330026C0007 FY26 PNQS 26-3190 -SEWER LINE REPAIR BLDG 155 | Department of Defense · Department of the Air Force | 237110 · J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $140K | Apr 6, 2026 – Sep 3, 2026 | Completed: Period of performance ended Sep 3, 2026 |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
No SBIR/STTR awards on record
Source: SBIR.gov award records · sync date not recorded
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov reports this entity as small under 33 of 37 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
FA330026C0008
PNQS 269256 -REPAIR DRAIN LINE BLDG 1403
| Department of Defense · Department of the Air Force |
| 237110 · Y1NDCONSTRUCTION OF SEWAGE AND WASTE FACILITIES |
| $70K |
| Apr 10, 2026 – Jun 25, 2026 |
Completed: Period of performance ended Jun 25, 2026 |
FA330025C0038 THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR PNQS 25-1844 TRAFFIC… | Department of Defense · Department of the Air Force | 238210 · J062MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS | $554.6K | Sep 30, 2025 – May 28, 2026 | Completed: Period of performance ended May 28, 2026 |
FA330025C0037 THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR JUBJ 25-1847 REPAIR… | Department of Defense · Department of the Air Force | 238210 · J062MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS | $235.2K | Sep 1, 2025 – Apr 14, 2026 | Completed: Period of performance ended Apr 14, 2026 |
FA330025C0060 REPAIR INTERIOR FLOOR BLDG 1431 IN ACCORDANCE WITH THE SUMMARY OF WORK (SOW) AND SUBJECT TO THE TERMS AND CONDITIONS OF THE CONTRACT. | Department of Defense · Department of the Air Force | 236220 · Z1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $197.5K | Oct 1, 2025 – Mar 10, 2026 | Completed: Period of performance ended Mar 10, 2026 |
FA330025C0053 OTS TRAINING SITE CONEX REPAIR: BERT CONSTRUCTION PROPOSAL DATED 11 SEPTEMBER 2025 IS HEREBY INCORPORATED BY REFERENCE. | Department of Defense · Department of the Air Force | 238390 · 5410PREFABRICATED AND PORTABLE BUILDINGS | $744.9K | Sep 18, 2025 – Jan 30, 2026 | Completed: Period of performance ended Jan 30, 2026 |
FA330025C0052 FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH BUILDING 1403 (MAX) PLUMBING - SEWER… | Department of Defense · Department of the Air Force | 238220 · J045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $61.7K | Oct 1, 2025 – Jan 9, 2026 | Completed: Period of performance ended Jan 9, 2026 |
FA330025C0056 CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO COMPLETE THE PAINT AND REFINISHING OF FAITH CHAPEL… | Department of Defense · Department of the Air Force | 236220 · Z1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $20.3K | Oct 1, 2025 – Nov 25, 2025 | Completed: Period of performance ended Nov 25, 2025 |
FA330025C0041 FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH MINOR INTERIOR REFRESH, BLDG 800 RM 254… | Department of Defense · Department of the Air Force | 236220 · Z1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $93.8K | Sep 8, 2025 – Oct 27, 2025 | Completed: Period of performance ended Oct 27, 2025 |
FA330025C0023 INSTALL 3 POWER LINES AND 4 ELECTRICAL OUTLETS IN BUILDING 714, MAXWELL AFB IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK (SOW). | Department of Defense · Department of the Air Force | 238210 · 5935CONNECTORS, ELECTRICAL | $5.9K | Jun 17, 2025 – Jun 30, 2025 | Completed: Period of performance ended Jun 30, 2025 |
FA330024C0054 FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REMOVE CARPET AND FINISH CONCRETE FLOOR IN THE BLDG. 800 BASEMENT AT MAXWELL AFB IAW… | Department of Defense · Department of the Air Force | 238330 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $361.2K | Oct 15, 2024 – May 2, 2025 | Completed: Period of performance ended May 2, 2025 |
FA330024C0062 AFLCMC HAS A REQUIREMENT TO PURCHASE AND INSTALL CARPET, AS WELL AS TO RENOVATE BOTH BUILDING 892 SUITE 110 AND THE AUDITORIUM. | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $497.5K | Oct 15, 2024 – Mar 23, 2025 | Completed: Period of performance ended Mar 23, 2025 |
FA330024C0055 THE WORK COVERED BY THESE SPECIFICATIONS CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS IN… | Department of Defense · Department of the Air Force | 238350 · Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $51.5K | Oct 15, 2024 – Feb 28, 2025 | Completed: Period of performance ended Feb 28, 2025 |
FA330024C0025 PROJECT TITLE: FY 24 PNQS 24-3706 REPAIR SEWER LINES | Department of Defense · Department of the Air Force | 237110 · Z2NDREPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES | $227.3K | Jul 13, 2024 – Feb 28, 2025 | Completed: Period of performance ended Feb 28, 2025 |
FA330024C0029 FY24 PNQS 24-3992 REPLACE LOCALIZER PAD, BLDG. 2076 | Department of Defense · Department of the Air Force | 238110 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $135.7K | Aug 15, 2024 – Feb 11, 2025 | Completed: Period of performance ended Feb 11, 2025 |
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 12, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 12, 2026