HDR ENGINEERING, INC.
- FOLSOM, CA 95630-8712
- hdrinc.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $25.9M
- Awards on record
- 14
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
HDR ENGINEERING, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About HDR ENGINEERING, INC.
- Headquarters
- FOLSOM, CA 95630-8712
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIEZA9LBXQWZB7
- CAGE4FZ86
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $25.9M
- Awards on record
- 14
- Top funding agencies
- Department of the Army
Awards
W9123821F0019
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH I, CONTRACT 2, DESIGN AND ENGINEERING SERVICES DURING…
Department of Defense · Department of the Army
- Obligated
- $992K
- Period of performance
- Jan 29, 2021 – May 31, 2027
W9123821F0065
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH D, HIGHWAY 99, DESIGN, SUTTER COUNTY, CALIFORNIA (FULL…
Department of Defense · Department of the Army
- Obligated
- $996.7K
- Period of performance
- Jul 21, 2021 – Dec 31, 2026
W9123822F0047
Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)PROJECT TITLE AND LOCATION: FOLSOM DAM SURCHARGE OPERATIONS UPDATE, FOLSOM, CA (2022).
Department of Defense · Department of the Army
- Obligated
- $940.4K
- Period of performance
- Aug 18, 2022 – Dec 30, 2026
W912HQ22P0066
Recompete < 6 mo: Potential end Dec 14, 2026 (1 month away)PROFESSIONAL SERVICES FOR HYDROLOGIC ENGINEERING CENTER RIVER ANALYSIS SYSTEM (HEC-RAS) SUPPORT
Department of Defense · Department of the Army
- Obligated
- $163.8K
- Period of performance
- Jun 10, 2022 – Dec 14, 2026
W9123825F0064
Completed: Period of performance ended Oct 30, 2026PROJECT TITLE AND LOCATION: FY26 MILCON, MC-130J HANGAR/AIRCRAFT MAINTENANCE UNIT (AMU), DAVIS-MONTHAN AFB, AZ. (100% DESIGN D-B-B)
Department of Defense · Department of the Army
- Obligated
- $9.6M
- Period of performance
- Dec 20, 2024 – Oct 30, 2026
W9123820F0082
Completed: Period of performance ended Jun 30, 2026PROJECT TITLE AND LOCATION: OROVILLE DAM, OROVILLE, CA AND NEW BULLARDS BAR DAM, DOBBINS, CA WATER CONTROL MANUAL (WCM) UPDATES PLANNING.
Department of Defense · Department of the Army
- Obligated
- $3.4M
- Period of performance
- Jun 17, 2020 – Jun 30, 2026
W912P721F0053
Completed: Period of performance ended Sep 10, 2025SOUTH SAN FRANCISCO BAY SHORELINE PEDESTRIAN BRIDGE PROJECT, USACE SAN FRANCISCO DISTRICT, ALVISO, CALIFORNIA.
Department of Defense · Department of the Army
- Obligated
- $32.7K
- Period of performance
- Sep 10, 2021 – Sep 10, 2025
W9123822P0030
Completed: Period of performance ended Mar 31, 2025YUBA BIOLOGICAL ASSESSMENT TECH
Department of Defense · Department of the Army
- Obligated
- $625K
- Period of performance
- Jul 8, 2022 – Mar 31, 2025
W9123820C0037
Completed: Period of performance ended Mar 31, 2025BIOLOGICAL ASSESSMENT SUPPLEMENTS, YUBA RIVER, CA
Department of Defense · Department of the Army
- Obligated
- $751.9K
- Period of performance
- Sep 23, 2020 – Mar 31, 2025
W912P722F0006
Completed: Period of performance ended Mar 1, 2025LAKE MENDOCINO (CVD) WATER CONTROL MANUAL
Department of Defense · Department of the Army
- Obligated
- $799.7K
- Period of performance
- Jan 10, 2022 – Mar 1, 2025
W9123818F0100
Completed: Period of performance ended Jan 30, 2025IGF::OT::IGF PROJECT TITLE AND LOCATION: D5 MISSILE MOTOR RECEIPT/STORAGE FACILITIES, UTAH TEST AND TRAINING RANGE
Department of Defense · Department of the Army
- Obligated
- $5.6M
- Period of performance
- Jun 28, 2018 – Jan 30, 2025
W9123819F0059
Completed: Period of performance ended Jun 15, 2024PROJECT TITLE AND LOCATION: CONSTRUCTION PHASE SERVICES FOR SUTTER BASIN FRMP, CYPRESS AVE TO TUDOR ROAD, SUTTER COUNTY.
Department of Defense · Department of the Army
- Obligated
- $2M
- Period of performance
- Jul 10, 2019 – Jun 15, 2024
W9123821F0020
Completed: Period of performance ended Jun 30, 2023PROJECT TITLE AND LOCATION: TECHNICAL SUPPORT FOR PALEOFLOOD ANALYSIS OF THE FEATHER RIVER, OROVILLE DAM, CA.
Department of Defense · Department of the Army
- Obligated
- $100.4K
- Period of performance
- Jan 29, 2021 – Jun 30, 2023
W912P720F0008
Completed: Period of performance ended May 31, 2023THE SHORELINE PROJECT IS A MULTI-PURPOSE PROJECT THAT WILL CONSTRUCT APPROXIMATELY 19,800 FEET (3.8 MILES) OF FLOOD RISK REDUCTION LEVEES…
Department of Defense · Department of the Army
- Obligated
- $395.4K
- Period of performance
- Nov 29, 2019 – May 31, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W9123821F0019 under W912P716D0003 PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH I, CONTRACT 2, DESIGN AND ENGINEERING SERVICES DURING… | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $992K | Jan 29, 2021 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award W9123821F0019Bid team for the recompete of award W9123821F0019 |
W9123821F0065 under W912P716D0003 PROJECT TITLE AND LOCATION: AMERICAN RIVER COMMON FEATURES, NATOMAS BASIN REACH D, HIGHWAY 99, DESIGN, SUTTER COUNTY, CALIFORNIA (FULL… | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $996.7K | Jul 21, 2021 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award W9123821F0065Bid team for the recompete of award W9123821F0065 |
W9123822F0047 under W912P717D0003 PROJECT TITLE AND LOCATION: FOLSOM DAM SURCHARGE OPERATIONS UPDATE, FOLSOM, CA (2022). | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $940.4K | Aug 18, 2022 – Dec 30, 2026 | Recompete < 6 mo: Potential end Dec 30, 2026 (1 month away)AI brief for award W9123822F0047Bid team for the recompete of award W9123822F0047 |
W912HQ22P0066 PROFESSIONAL SERVICES FOR HYDROLOGIC ENGINEERING CENTER RIVER ANALYSIS SYSTEM (HEC-RAS) SUPPORT | Department of Defense · Department of the Army | 541714 · R499SUPPORT- PROFESSIONAL: OTHER | $163.8K | Jun 10, 2022 – Dec 14, 2026 | Recompete < 6 mo: Potential end Dec 14, 2026 (1 month away)AI brief for award W912HQ22P0066Bid team for the recompete of award W912HQ22P0066 |
W9123825F0064 under W9123823D0003 PROJECT TITLE AND LOCATION: FY26 MILCON, MC-130J HANGAR/AIRCRAFT MAINTENANCE UNIT (AMU), DAVIS-MONTHAN AFB, AZ. (100% DESIGN D-B-B) | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $9.6M | Dec 20, 2024 – Oct 30, 2026 | Completed: Period of performance ended Oct 30, 2026 |
W9123820F0082 under W9123815D0004 PROJECT TITLE AND LOCATION: OROVILLE DAM, OROVILLE, CA AND NEW BULLARDS BAR DAM, DOBBINS, CA WATER CONTROL MANUAL (WCM) UPDATES PLANNING. | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $3.4M | Jun 17, 2020 – Jun 30, 2026 | Completed: Period of performance ended Jun 30, 2026 |
W912P721F0053 under W912P716D0003 SOUTH SAN FRANCISCO BAY SHORELINE PEDESTRIAN BRIDGE PROJECT, USACE SAN FRANCISCO DISTRICT, ALVISO, CALIFORNIA. | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $32.7K | Sep 10, 2021 – Sep 10, 2025 | Completed: Period of performance ended Sep 10, 2025 |
W9123822P0030 YUBA BIOLOGICAL ASSESSMENT TECH | Department of Defense · Department of the Army | 541690 · R499SUPPORT- PROFESSIONAL: OTHER | $625K | Jul 8, 2022 – Mar 31, 2025 | Completed: Period of performance ended Mar 31, 2025 |
W9123820C0037 BIOLOGICAL ASSESSMENT SUPPLEMENTS, YUBA RIVER, CA | Department of Defense · Department of the Army | 541690 · F108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION | $751.9K | Sep 23, 2020 – Mar 31, 2025 | Completed: Period of performance ended Mar 31, 2025 |
W912P722F0006 under W912P717D0003 LAKE MENDOCINO (CVD) WATER CONTROL MANUAL | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $799.7K | Jan 10, 2022 – Mar 1, 2025 | Completed: Period of performance ended Mar 1, 2025 |
W9123818F0100 under W9123817D0027 IGF::OT::IGF PROJECT TITLE AND LOCATION: D5 MISSILE MOTOR RECEIPT/STORAGE FACILITIES, UTAH TEST AND TRAINING RANGE | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $5.6M | Jun 28, 2018 – Jan 30, 2025 | Completed: Period of performance ended Jan 30, 2025 |
W9123819F0059 under W9123817D0027 PROJECT TITLE AND LOCATION: CONSTRUCTION PHASE SERVICES FOR SUTTER BASIN FRMP, CYPRESS AVE TO TUDOR ROAD, SUTTER COUNTY. | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2M | Jul 10, 2019 – Jun 15, 2024 | Completed: Period of performance ended Jun 15, 2024 |
W9123821F0020 under W912P717D0003 PROJECT TITLE AND LOCATION: TECHNICAL SUPPORT FOR PALEOFLOOD ANALYSIS OF THE FEATHER RIVER, OROVILLE DAM, CA. | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $100.4K | Jan 29, 2021 – Jun 30, 2023 | Completed: Period of performance ended Jun 30, 2023 |
W912P720F0008 under W912P716D0003 THE SHORELINE PROJECT IS A MULTI-PURPOSE PROJECT THAT WILL CONSTRUCT APPROXIMATELY 19,800 FEET (3.8 MILES) OF FLOOD RISK REDUCTION LEVEES… | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $395.4K | Nov 29, 2019 – May 31, 2023 | Completed: Period of performance ended May 31, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- WSM PACIFIC SIOP, A JOINT VENTURE
UEI LTRAAFDB1H51
$511.9K
Subcontractor to this prime · 1 sub-award · latest Dec 21, 2023
- Department of the Navy
- “DESIGN DEVELOPMENT”
Subcontractors it has used
- CONSTRUCTION COST MANAGEMENT INCORPORATED
UEI KR12Q1ZVKLJ8
$1.5M
Subcontracted by this company · 3 sub-awards · latest May 12, 2026
- Department of the Army
- “UTTR ESTIMATOR CCM CHARRETTE”
- “CONSTRUCTION COST MANAGEMENT SERVICES”
- “AIRCRAFT MAINTENANCE”
- AECOM C&E, INC.
UEI FTSKGJSN8JD1 · not in the directory yet
$1.3M
Subcontracted by this company · 1 sub-award · latest Apr 2, 2024
- Department of the Army
- “RFI AND SUBMITTAL REVIEW”
- GERHART COLE INC
UEI HJBTV3BYL1F9
$287.1K
Subcontracted by this company · 1 sub-award · latest May 15, 2026
- Department of the Army
- “D5 MISSILE MOTOR STORAGE FACILITIES”
- RIVERA HALCROW ENGINEERING LLC
UEI G3L6UH5ZSM43
$196.8K
Subcontracted by this company · 1 sub-award · latest May 28, 2025
- Department of the Army
- “ENGINEERING SERVICES”
- TERRACON CONSULTANTS INC
UEI GNCLMLJU1KB9
$118.7K
Subcontracted by this company · 1 sub-award · latest Oct 22, 2025
- Department of the Army
- “TERRACON FOR MC130J HANGAR DAVIS MONTHAN”
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 236220Commercial and Institutional Building Construction
- 237310Highway, Street, and Bridge Construction
- 238220Plumbing, Heating, and Air-Conditioning Contractors
- 238990All Other Specialty Trade Contractors
- 541310Architectural Services
- 541320Landscape Architectural Services
- 541618Other Management Consulting Services
- 561210Facilities Support Services
- 562910Remediation Services
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with HDR ENGINEERING, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
