RLF & CN JV
Doing business as RLF
- ORLANDO, FL 32814-6422
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $28.6M
- Awards on record
- 16
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
RLF & CN JV has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About RLF & CN JV
- Headquarters
- ORLANDO, FL 32814-6422
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIFKRWWL8UMN47
- CAGE9L6M6
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $28.6M
- Awards on record
- 16
- Top funding agencies
- Department of the Navy
Awards
N6247025F4019
Recompete 18+ mo: Potential end Dec 30, 2029 (37 months away)P1701 FUEL STORAGE FACILITIES
Department of Defense · Department of the Navy
- Obligated
- $963.9K
- Period of performance
- May 9, 2025 – Dec 30, 2029
N6247025F0103
Recompete 18+ mo: Potential end Jun 30, 2028 (19 months away)A-E DESIGN SERVICES FOR FY25 MILCON PROJECT P-300 OPERATING STORAGE, JET FUEL SYSTEM AVIANO AIR BASE, AVIANO, ITALY
Department of Defense · Department of the Navy
- Obligated
- $3.4M
- Period of performance
- Aug 29, 2025 – Jun 30, 2028
N6247025F0099
Recompete 6–12 mo: Potential end Sep 28, 2027 (10 months away)ENGINEER SERVICES TO DEVELOP DESIGN-BUILD RFP FOR DEMOLITION OF NNSY BL-172, SIOP
Department of Defense · Department of the Navy
- Obligated
- $871.3K
- Period of performance
- Sep 12, 2025 – Sep 28, 2027
N6247024F4074
Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)FISCAL YEAR 2019 MILITARY CONSTRUCTION P256: SHIPS MAINTENANCE FACILITY, POST CONSTRUCTION AWARD SERVICES
Department of Defense · Department of the Navy
- Obligated
- $389.5K
- Period of performance
- May 15, 2024 – Aug 31, 2027
N6247025F0020
Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)DD2 CAISSON CERTIFICATION AND OVERHAUL
Department of Defense · Department of the Navy
- Obligated
- $1.5M
- Period of performance
- Jul 24, 2025 – Jul 31, 2027
N6247025F0100
Recompete < 6 mo: Potential end Mar 10, 2027 (3 months away)P005 OPERATION STORAGE, JET FUEL SYSTEM MORON SPAIN
Department of Defense · Department of the Navy
- Obligated
- $3.5M
- Period of performance
- Sep 11, 2025 – Mar 10, 2027
N6247025F0106
Recompete < 6 mo: Potential end Feb 6, 2027 (2 months away)SIOP NNSY BUILDING M22 STRUCTURAL, CIVIL, AND FUTURE MEDICAL FACILITY STUDIES.
Department of Defense · Department of the Navy
- Obligated
- $1.6M
- Period of performance
- Sep 15, 2025 – Feb 6, 2027
N3319126F0014
Recompete < 6 mo: Potential end Dec 19, 2026 (1 month away)P139 MICROGRID AND SCADA
Department of Defense · Department of the Navy
- Obligated
- $2.2M
- Period of performance
- Dec 17, 2025 – Dec 19, 2026
N4008025F4189
Completed: Period of performance ended Sep 30, 2026P664 FME LAB DB RFP, NMIC SUITLAND MD
Department of Defense · Department of the Navy
- Obligated
- $1.6M
- Period of performance
- Aug 20, 2025 – Sep 30, 2026
N6247024F4170
Completed: Period of performance ended Sep 30, 2026DRY DOCK 2 WATERFRONT PRODUCTION FACILITY, PORTSMOUTH NAVAL SHIPYARD KITTERY MAINE
Department of Defense · Department of the Navy
- Obligated
- $3.4M
- Period of performance
- Sep 20, 2024 – Sep 30, 2026
N6247026F0023
Completed: Period of performance ended Sep 14, 2026PRELIMINARY DESIGN AUTHORITY (PDA) FOR P347, PV INSTALLATION OVER EXISTING WATER CANAL.
Department of Defense · Department of the Navy
- Obligated
- $1.1M
- Period of performance
- Apr 9, 2026 – Sep 14, 2026
N6247026F0022
Completed: Period of performance ended Sep 14, 2026PRELIMINARY DESIGN AUTHORITY (PDA) FOR P346, BATTERY ENERGY STORAGE SYSTEM.
Department of Defense · Department of the Navy
- Obligated
- $485.8K
- Period of performance
- Apr 8, 2026 – Sep 14, 2026
N3319124F4393
Completed: Period of performance ended Apr 20, 2026FY25, MILCON ERCIP, SOUDA BAY- A-E DESIGN SERVICES FOR P999 ADVAN
Department of Defense · Department of the Navy
- Obligated
- $4.9M
- Period of performance
- Sep 23, 2024 – Apr 20, 2026
N6247024F4062
Completed: Period of performance ended Dec 1, 2025HOST NATION PCAS SUPPORT
Department of Defense · Department of the Navy
- Obligated
- $59.2K
- Period of performance
- Aug 29, 2024 – Dec 1, 2025
N4008024F5082
Completed: Period of performance ended Aug 30, 2025P664 FOREIGN MATERIEL EXPLOITATION (FME) LAB PLANNING, ENGINEERIN
Department of Defense · Department of the Navy
- Obligated
- $2.7M
- Period of performance
- Sep 26, 2024 – Aug 30, 2025
N6247023F4195
Completed: Period of performance ended Aug 29, 2024MINIMUM GUARANTEE TASK ORDER
Department of Defense · Department of the Navy
- Obligated
- $0
- Period of performance
- Aug 30, 2023 – Aug 29, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
N6247025F4019 under N6247023D0013 P1701 FUEL STORAGE FACILITIES | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $963.9K | May 9, 2025 – Dec 30, 2029 | Recompete 18+ mo: Potential end Dec 30, 2029 (37 months away) |
N6247025F0103 under N6247023D0013 A-E DESIGN SERVICES FOR FY25 MILCON PROJECT P-300 OPERATING STORAGE, JET FUEL SYSTEM AVIANO AIR BASE, AVIANO, ITALY | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $3.4M | Aug 29, 2025 – Jun 30, 2028 | Recompete 18+ mo: Potential end Jun 30, 2028 (19 months away) |
N6247025F0099 under N6247023D0013 ENGINEER SERVICES TO DEVELOP DESIGN-BUILD RFP FOR DEMOLITION OF NNSY BL-172, SIOP | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $871.3K | Sep 12, 2025 – Sep 28, 2027 | Recompete 6–12 mo: Potential end Sep 28, 2027 (10 months away)AI brief for award N6247025F0099Bid team for the recompete of award N6247025F0099 |
N6247024F4074 under N6247023D0013 FISCAL YEAR 2019 MILITARY CONSTRUCTION P256: SHIPS MAINTENANCE FACILITY, POST CONSTRUCTION AWARD SERVICES | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $389.5K | May 15, 2024 – Aug 31, 2027 | Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)AI brief for award N6247024F4074Bid team for the recompete of award N6247024F4074 |
N6247025F0020 under N6247023D0013 DD2 CAISSON CERTIFICATION AND OVERHAUL | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.5M | Jul 24, 2025 – Jul 31, 2027 | Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)AI brief for award N6247025F0020Bid team for the recompete of award N6247025F0020 |
N6247025F0100 under N6247023D0013 P005 OPERATION STORAGE, JET FUEL SYSTEM MORON SPAIN | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $3.5M | Sep 11, 2025 – Mar 10, 2027 | Recompete < 6 mo: Potential end Mar 10, 2027 (3 months away)AI brief for award N6247025F0100Bid team for the recompete of award N6247025F0100 |
N6247025F0106 under N6247023D0013 SIOP NNSY BUILDING M22 STRUCTURAL, CIVIL, AND FUTURE MEDICAL FACILITY STUDIES. | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.6M | Sep 15, 2025 – Feb 6, 2027 | Recompete < 6 mo: Potential end Feb 6, 2027 (2 months away)AI brief for award N6247025F0106Bid team for the recompete of award N6247025F0106 |
N3319126F0014 under N6247023D0013 P139 MICROGRID AND SCADA | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $2.2M | Dec 17, 2025 – Dec 19, 2026 | Recompete < 6 mo: Potential end Dec 19, 2026 (1 month away)AI brief for award N3319126F0014Bid team for the recompete of award N3319126F0014 |
N4008025F4189 under N6247023D0013 P664 FME LAB DB RFP, NMIC SUITLAND MD | Department of Defense · Department of the Navy | 541330 · C1JBARCHITECT AND ENGINEERING- CONSTRUCTION: TESTING AND MEASUREMENT BUILDINGS | $1.6M | Aug 20, 2025 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
N6247024F4170 under N6247023D0013 DRY DOCK 2 WATERFRONT PRODUCTION FACILITY, PORTSMOUTH NAVAL SHIPYARD KITTERY MAINE | Department of Defense · Department of the Navy | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $3.4M | Sep 20, 2024 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
N6247026F0023 under N6247023D0013 PRELIMINARY DESIGN AUTHORITY (PDA) FOR P347, PV INSTALLATION OVER EXISTING WATER CANAL. | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.1M | Apr 9, 2026 – Sep 14, 2026 | Completed: Period of performance ended Sep 14, 2026 |
N6247026F0022 under N6247023D0013 PRELIMINARY DESIGN AUTHORITY (PDA) FOR P346, BATTERY ENERGY STORAGE SYSTEM. | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $485.8K | Apr 8, 2026 – Sep 14, 2026 | Completed: Period of performance ended Sep 14, 2026 |
N3319124F4393 under N6247023D0013 FY25, MILCON ERCIP, SOUDA BAY- A-E DESIGN SERVICES FOR P999 ADVAN | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $4.9M | Sep 23, 2024 – Apr 20, 2026 | Completed: Period of performance ended Apr 20, 2026 |
N6247024F4062 under N6247023D0013 HOST NATION PCAS SUPPORT | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $59.2K | Aug 29, 2024 – Dec 1, 2025 | Completed: Period of performance ended Dec 1, 2025 |
N4008024F5082 under N6247023D0013 P664 FOREIGN MATERIEL EXPLOITATION (FME) LAB PLANNING, ENGINEERIN | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $2.7M | Sep 26, 2024 – Aug 30, 2025 | Completed: Period of performance ended Aug 30, 2025 |
N6247023F4195 under N6247023D0013 MINIMUM GUARANTEE TASK ORDER | Department of Defense · Department of the Navy | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $0 | Aug 30, 2023 – Aug 29, 2024 | Completed: Period of performance ended Aug 29, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
- C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
- C213ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION)
- C214ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING
- C219ARCHITECT AND ENGINEERING- GENERAL: OTHER
- C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING
- C221ARCHITECT AND ENGINEERING- GENERAL: PLUMBING SYSTEMS
- C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS
- C223ARCHITECT AND ENGINEERING- GENERAL: MECHANICAL SYSTEMS
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with RLF & CN JV?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
