ADVANCED TECHNOLOGIES, INC.
Doing business as ADVANCED TECHNOLOGIES INC
- NEWPORT NEWS, VA 23606-3078
- advancedtechnologiesinc.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $4.8M
- Awards on record
- 16
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
ADVANCED TECHNOLOGIES, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About ADVANCED TECHNOLOGIES, INC.
- Headquarters
- NEWPORT NEWS, VA 23606-3078
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIFV58GN6ZNRK1
- CAGE0KT86
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $4.8M
- Awards on record
- 16
- Top funding agencies
- National Aeronautics and Space Administration · Department of the Navy
Awards
80LARC26FW004
Completed: Period of performance ended Oct 19, 20261 COROTUB MOD ASSEMBLY AND 4 SPLICE PLATES WITH HARDWARE
National Aeronautics and Space Administration
- Obligated
- $100K
- Period of performance
- Sep 11, 2026 – Oct 19, 2026
80LARC26FW002
Completed: Period of performance ended Oct 7, 2026COROTUB MOLD ASSEMBLY & 4 SPLICE PLATES WITH HARDWARE
National Aeronautics and Space Administration
- Obligated
- $96.9K
- Period of performance
- Jul 29, 2026 – Oct 7, 2026
80LARC26FW003
Completed: Period of performance ended Oct 1, 20261 FOOTPAD AND 1 FOOTPAD TOP HAT
National Aeronautics and Space Administration
- Obligated
- $16.6K
- Period of performance
- Sep 8, 2026 – Oct 1, 2026
80LARC25FA035
Completed: Period of performance ended Jun 30, 2026DESIGN, ANALYSIS, AND FABRICATION OF MOUNTING HARDWARE TO TEST AN EXISTING 11.8% SCALE SEMISPAN TRANSONIC TRUSS BRACED WING MODEL (TTBW)…
National Aeronautics and Space Administration
- Obligated
- $60.9K
- Period of performance
- Jul 24, 2025 – Jun 30, 2026
80LARC25FA007
Completed: Period of performance ended Mar 31, 2026DESIGN OF A MODEL-SCALE COAXIAL ROTOR AEROELASTIC TESTBED (MSCRAT) WITH THE INCLUSION OF THREE OPTION PERIODS TO ALLOW FOR FABRICATION OF…
National Aeronautics and Space Administration
- Obligated
- $611.9K
- Period of performance
- Dec 10, 2024 – Mar 31, 2026
80LARC24FA047
Completed: Period of performance ended Oct 31, 2025DESIGN OF A MODEL-SCALE COAXIAL ROTOR AEROELASTIC TESTBED (MSCRAT) WITH THE INCLUSION OF THREE OPTION PERIODS TO ALLOW FOR FABRICATION OF…
National Aeronautics and Space Administration
- Obligated
- $590.9K
- Period of performance
- Sep 20, 2024 – Oct 31, 2025
80LARC25FW044
Completed: Period of performance ended Apr 30, 2025ELECTRICAL FLANGE PLATE WORK ORDER
National Aeronautics and Space Administration
- Obligated
- $14.1K
- Period of performance
- Apr 1, 2025 – Apr 30, 2025
80LARC23F0054
Completed: Period of performance ended Apr 15, 2025FABRICATION OF THE 2.7% SCALE FULL SPAN AND SEMI-SPAN HIGH LIFT COMMON RESEARCH MODEL FOR TESTING IN THE NASA LANGLEY NATIONAL TRANSONIC…
National Aeronautics and Space Administration
- Obligated
- $2.2M
- Period of performance
- Jul 27, 2023 – Apr 15, 2025
80LARC25FW041
Completed: Period of performance ended Feb 12, 2025FLOOR BASEPLATE QUOTE
National Aeronautics and Space Administration
- Obligated
- $14.1K
- Period of performance
- Jan 27, 2025 – Feb 12, 2025
80LARC24FA034
Completed: Period of performance ended Jan 31, 2025DESIGN AND FABRICATION WORK FOR SWASHPLATELESS PROTOTYPE ROTOR HUB FOR MODEL-SCALE ROTOR TESTING.
National Aeronautics and Space Administration
- Obligated
- $381.6K
- Period of performance
- Jul 2, 2024 – Jan 31, 2025
N0042124P0304
Completed: Period of performance ended Dec 31, 2024STATIC PIPE ASSEMBLLY
Department of Defense · Department of the Navy
- Obligated
- $66.6K
- Period of performance
- Jun 11, 2024 – Dec 31, 2024
80LARC23FA032
Completed: Period of performance ended May 24, 2024RELIANCE CONSOLIDATED MODELS VI MINIMUM GUARANTEE DELIVERY ORDER.
National Aeronautics and Space Administration
- Obligated
- $49.8K
- Period of performance
- Mar 13, 2024 – May 24, 2024
80LARC23F0057
Completed: Period of performance ended May 10, 2024DESIGN, ANALYSIS, AND FABRICATION OF COMPOUND TEST HARDWARE. COVERS MULTIPLE ASPECTS WHICH INCLUDE REPAIRING THE LANGLEY ROTOR TEST STAND,…
National Aeronautics and Space Administration
- Obligated
- $588K
- Period of performance
- Aug 15, 2023 – May 10, 2024
80LARC19F0159
Completed: Period of performance ended Jul 30, 2021DESIGN, ANALYSIS,&FABRICATION OF C4 BLADE SET 2 DESIGN, ANALYSIS, FABRICATION AND CALIBRATION OF A HIGHLY INSTRUMENTED C4 ROTOR BLADE SET…
National Aeronautics and Space Administration
- Obligated
- $505.8K
- Period of performance
- Sep 20, 2019 – Jul 30, 2021
80LARC19F0072
Completed: Period of performance ended Sep 30, 2020THIS IS WORK IS FOR THE DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A VARIETY OF WINGED…
National Aeronautics and Space Administration
- Obligated
- $2.3M
- Period of performance
- May 31, 2019 – Sep 30, 2020
80LARC18F0161
Completed: Period of performance ended Apr 30, 2019WINGED COMPOUND ROTORCRAFT WIND TUNNEL TESTBED. DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A…
National Aeronautics and Space Administration
- Obligated
- $1.4M
- Period of performance
- Aug 7, 2018 – Apr 30, 2019
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
80LARC26FW004 under 80LARC21AA003 1 COROTUB MOD ASSEMBLY AND 4 SPLICE PLATES WITH HARDWARE | National Aeronautics and Space Administration | 332999 · J095MAINT/REPAIR/REBUILD OF EQUIPMENT- METAL BARS, SHEETS, AND SHAPES | $100K | Sep 11, 2026 – Oct 19, 2026 | Completed: Period of performance ended Oct 19, 2026 |
80LARC26FW002 under 80LARC21AA003 COROTUB MOLD ASSEMBLY & 4 SPLICE PLATES WITH HARDWARE | National Aeronautics and Space Administration | 332999 · J095MAINT/REPAIR/REBUILD OF EQUIPMENT- METAL BARS, SHEETS, AND SHAPES | $96.9K | Jul 29, 2026 – Oct 7, 2026 | Completed: Period of performance ended Oct 7, 2026 |
80LARC26FW003 under 80LARC26A0010 1 FOOTPAD AND 1 FOOTPAD TOP HAT | National Aeronautics and Space Administration | 332999 · J095MAINT/REPAIR/REBUILD OF EQUIPMENT- METAL BARS, SHEETS, AND SHAPES | $16.6K | Sep 8, 2026 – Oct 1, 2026 | Completed: Period of performance ended Oct 1, 2026 |
80LARC25FA035 under 80LARC23DA005 DESIGN, ANALYSIS, AND FABRICATION OF MOUNTING HARDWARE TO TEST AN EXISTING 11.8% SCALE SEMISPAN TRANSONIC TRUSS BRACED WING MODEL (TTBW)… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $60.9K | Jul 24, 2025 – Jun 30, 2026 | Completed: Period of performance ended Jun 30, 2026 |
80LARC25FA007 under 80LARC23DA005 DESIGN OF A MODEL-SCALE COAXIAL ROTOR AEROELASTIC TESTBED (MSCRAT) WITH THE INCLUSION OF THREE OPTION PERIODS TO ALLOW FOR FABRICATION OF… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $611.9K | Dec 10, 2024 – Mar 31, 2026 | Completed: Period of performance ended Mar 31, 2026 |
80LARC24FA047 under 80LARC23DA005 DESIGN OF A MODEL-SCALE COAXIAL ROTOR AEROELASTIC TESTBED (MSCRAT) WITH THE INCLUSION OF THREE OPTION PERIODS TO ALLOW FOR FABRICATION OF… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $590.9K | Sep 20, 2024 – Oct 31, 2025 | Completed: Period of performance ended Oct 31, 2025 |
80LARC25FW044 under 80LARC21AA003 ELECTRICAL FLANGE PLATE WORK ORDER | National Aeronautics and Space Administration | 332999 · J095MAINT/REPAIR/REBUILD OF EQUIPMENT- METAL BARS, SHEETS, AND SHAPES | $14.1K | Apr 1, 2025 – Apr 30, 2025 | Completed: Period of performance ended Apr 30, 2025 |
80LARC23F0054 under 80LARC18D0005 FABRICATION OF THE 2.7% SCALE FULL SPAN AND SEMI-SPAN HIGH LIFT COMMON RESEARCH MODEL FOR TESTING IN THE NASA LANGLEY NATIONAL TRANSONIC… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $2.2M | Jul 27, 2023 – Apr 15, 2025 | Completed: Period of performance ended Apr 15, 2025 |
80LARC25FW041 under 80LARC21AA003 FLOOR BASEPLATE QUOTE | National Aeronautics and Space Administration | 332999 · J095MAINT/REPAIR/REBUILD OF EQUIPMENT- METAL BARS, SHEETS, AND SHAPES | $14.1K | Jan 27, 2025 – Feb 12, 2025 | Completed: Period of performance ended Feb 12, 2025 |
80LARC24FA034 under 80LARC23DA005 DESIGN AND FABRICATION WORK FOR SWASHPLATELESS PROTOTYPE ROTOR HUB FOR MODEL-SCALE ROTOR TESTING. | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $381.6K | Jul 2, 2024 – Jan 31, 2025 | Completed: Period of performance ended Jan 31, 2025 |
N0042124P0304 STATIC PIPE ASSEMBLLY | Department of Defense · Department of the Navy | 332510 · 6636ENVIRONMENTAL CHAMBERS AND RELATED EQUIPMENT | $66.6K | Jun 11, 2024 – Dec 31, 2024 | Completed: Period of performance ended Dec 31, 2024 |
80LARC23FA032 under 80LARC23DA005 RELIANCE CONSOLIDATED MODELS VI MINIMUM GUARANTEE DELIVERY ORDER. | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $49.8K | Mar 13, 2024 – May 24, 2024 | Completed: Period of performance ended May 24, 2024 |
80LARC23F0057 under 80LARC18D0005 DESIGN, ANALYSIS, AND FABRICATION OF COMPOUND TEST HARDWARE. COVERS MULTIPLE ASPECTS WHICH INCLUDE REPAIRING THE LANGLEY ROTOR TEST STAND,… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $588K | Aug 15, 2023 – May 10, 2024 | Completed: Period of performance ended May 10, 2024 |
80LARC19F0159 under 80LARC18D0005 DESIGN, ANALYSIS,&FABRICATION OF C4 BLADE SET 2 DESIGN, ANALYSIS, FABRICATION AND CALIBRATION OF A HIGHLY INSTRUMENTED C4 ROTOR BLADE SET… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $505.8K | Sep 20, 2019 – Jul 30, 2021 | Completed: Period of performance ended Jul 30, 2021 |
80LARC19F0072 under 80LARC18D0005 THIS IS WORK IS FOR THE DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A VARIETY OF WINGED… | National Aeronautics and Space Administration | 541715 · AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | $2.3M | May 31, 2019 – Sep 30, 2020 | Completed: Period of performance ended Sep 30, 2020 |
80LARC18F0161 under NNL13AA01B WINGED COMPOUND ROTORCRAFT WIND TUNNEL TESTBED. DETAILED DESIGN AND FABRICATION OF AN ADVANCED ROTORCRAFT TESTBED SUITABLE FOR TESTING A… | National Aeronautics and Space Administration | 541712 · AJ44R&D- GENERAL SCIENCE/TECHNOLOGY: ENGINEERING (ENGINEERING DEVELOPMENT) | $1.4M | Aug 7, 2018 – Apr 30, 2019 | Completed: Period of performance ended Apr 30, 2019 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC
UEI C1HBCJ9RMBV3
$853.5K
Subcontractor to this prime · 1 sub-award · latest Mar 8, 2024
- Department of the Navy
- “SUBCONTRACT FUNDING”
- THE BOEING COMPANY
UEI M8JLMEHJADQ5
$475.5K
Subcontractor to this prime · 1 sub-award · latest Jan 30, 2025
- Department of the Navy
- “AEROSPACE SUPPORT”
- BEYOND NEW HORIZONS, LLC
UEI KNZUXDQ8C9S4
$99K
Subcontractor to this prime · 1 sub-award · latest May 29, 2026
- Department of the Air Force
- “METAL FABRICATION - COMPLEX - PROVIDE ALL MATERIAL & LABOR TO FABRICATE (QTY. 1) TUBE END PER DRAWING 17-1027, REV. C. VENDOR TO FABRICATE TUBE END FROM STAINLESS STEEL, 17-4H X H1075 CONDITION, PER ASTM A-564.”
Subcontractors it has used
No reported sub-awards as a prime contractor.
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 332710Machine ShopsSmall business under this code’s size standard
- 332721Precision Turned Product ManufacturingSmall business under this code’s size standard
- 332999All Other Miscellaneous Fabricated Metal Product ManufacturingSmall business under this code’s size standard
- 541330Engineering Services
SAM.gov reports this entity as small under 3 of 5 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with ADVANCED TECHNOLOGIES, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
