DOWL, LLC
- BELLEVUE, WA 98007-6538
- dowl.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $5.6M
- Awards on record
- 23
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
DOWL, LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About DOWL, LLC
- Headquarters
- BELLEVUE, WA 98007-6538
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIG51EQ3EJ89A4
- CAGE3WYU1
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $5.6M
- Awards on record
- 23
- Top funding agencies
- Federal Highway Administration
Awards
69056726F00081N
Recompete 18+ mo: Potential end Feb 14, 2029 (27 months away)A/E ENGINEERING SUPPORT FOR OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS
Department of Transportation · Federal Highway Administration
- Obligated
- $20K
- Period of performance
- Jul 13, 2026 – Feb 14, 2029
69056725F00074N
Recompete 18+ mo: Potential end Aug 14, 2028 (21 months away)A/E DESIGN FOR WA ERFO NPS MORA 2022-2(2) MOUNT RAINIER ERFO REPAIRS PHASE 2
Department of Transportation · Federal Highway Administration
- Obligated
- $1.1M
- Period of performance
- Aug 20, 2025 – Aug 14, 2028
69056724F00023N
Recompete 12–18 mo: Potential end Mar 15, 2028 (16 months away)OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES 30% PRELIMINARY ENGINEERING FOR MT. HOOD DRAINAGE STRUCTURES
Department of Transportation · Federal Highway Administration
- Obligated
- $857.9K
- Period of performance
- Apr 17, 2024 – Mar 15, 2028
69056725F00064N
Recompete 12–18 mo: Potential end Jan 14, 2028 (14 months away)WA ERFO FS GIFPN603 2022-1(1) GIFFORD PINCHOT ERFO REPAIRS 2022 FINAL DESIGN
Department of Transportation · Federal Highway Administration
- Obligated
- $229K
- Period of performance
- Sep 10, 2025 – Jan 14, 2028
69056724F00064N
Recompete 12–18 mo: Potential end Dec 16, 2027 (13 months away)MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT PLANNING TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $628.3K
- Period of performance
- Sep 24, 2024 – Dec 16, 2027
69056726F00091N
Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)A/E NEPA FOR WA FLAP LEWIS 79908(1), NISQUALLY RIVER BRIDGE SCOUR PROTECTION
Department of Transportation · Federal Highway Administration
- Obligated
- $91.7K
- Period of performance
- Aug 21, 2026 – Jun 14, 2027
69056726F00028N
Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)COMPLETE THE DESIGN AND NEPA DOCUMENTATION FOR THE DENALI PARK PEDESTRIAN BRIDGE AND TRAIL PROJECT
Department of Transportation · Federal Highway Administration
- Obligated
- $477.3K
- Period of performance
- Oct 19, 2021 – Jun 14, 2027
69056726F00095N
Recompete 6–12 mo: Potential end May 15, 2027 (6 months away)A/E FOR WA NP OLYM 104(2), FINLEY CREEK BRIDGE REHABILITATION
Department of Transportation · Federal Highway Administration
- Obligated
- $32.1K
- Period of performance
- Aug 27, 2026 – May 15, 2027
69056726F00044N
Recompete < 6 mo: Potential end Apr 13, 2027 (4 months away)A/E DESIGN FOR MT BR MAO 307(2), CANYON FERRY DAM SPILLWAY BRIDGE REHABILITATION
Department of Transportation · Federal Highway Administration
- Obligated
- $135.6K
- Period of performance
- Mar 23, 2026 – Apr 13, 2027
69056725F00059N
Completed: Period of performance ended Apr 6, 2026OREGON FEDERAL LANDS ACCESS PROGRAM SCOPING
Department of Transportation · Federal Highway Administration
- Obligated
- $210.2K
- Period of performance
- Sep 9, 2025 – Apr 6, 2026
69056725F00090N
Completed: Period of performance ended Feb 14, 2026A/E GEOTECHNICAL SUBSURFACE INVESTIGATION AND PRELIMINARY ENGINEERING FOR WA PWRO 2010(1) BACKBONE RIDGE VIADUCT #1
Department of Transportation · Federal Highway Administration
- Obligated
- $218.3K
- Period of performance
- Sep 8, 2025 – Feb 14, 2026
69056723F00035N
Completed: Period of performance ended Feb 14, 2026OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS INTERMEDIATE THROUGH FINAL DESIGN PHASES
Department of Transportation · Federal Highway Administration
- Obligated
- $275.4K
- Period of performance
- Mar 23, 2023 – Feb 14, 2026
69056724F00071N
Completed: Period of performance ended Nov 15, 2025WFL RESEARCH 2024(2), ANCSA 17B GUIDEBOOK DEVELOPMENT PLANNING TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $237.8K
- Period of performance
- Sep 19, 2024 – Nov 15, 2025
69056725F00075N
Completed: Period of performance ended Sep 29, 2025MASTERWORKS/EEBACS CONVERSION, DESIGN SUPPORT
Department of Transportation · Federal Highway Administration
- Obligated
- $0
- Period of performance
- Jul 22, 2025 – Sep 29, 2025
69056723F00052N
Completed: Period of performance ended May 31, 2025FLPP OR IP 2022(1), OREGON INTEGRATED PLANNING FLAP NEEDS ASSESSMENT PLANNING TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $125.2K
- Period of performance
- Jun 21, 2023 – May 31, 2025
69056723F00016N
Completed: Period of performance ended May 16, 2025AK FLAP DOT 1(2), TURNAGAIN PASS MASTER PLAN PLANNING SERVICES TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $448.7K
- Period of performance
- Feb 13, 2023 – May 16, 2025
69056722F00104N
Completed: Period of performance ended Apr 14, 2025ID BLM IFD 01000(1), CONANT BANK STABILIZATION ENVIRONMENTAL COMPLIANCE SERVICES TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $75.1K
- Period of performance
- Aug 24, 2022 – Apr 14, 2025
69056723F00083N
Completed: Period of performance ended Jun 10, 2024AK SEWARD 2019(1), LOWELL POINT ROAD PREPARATION OF SCOPING REPORT FOR SUBJECT PROJECT
Department of Transportation · Federal Highway Administration
- Obligated
- $154K
- Period of performance
- Sep 13, 2023 – Jun 10, 2024
69056722F000043
Completed: Period of performance ended May 13, 2024OR FS ERFO 2020(1)-14(1), WALLA WALLA SOUTH - UMATILLA REPAIRS 2020, PHASE 1 ENVIRONMENTAL AND BIOLOGICAL ASSESSMENT
Department of Transportation · Federal Highway Administration
- Obligated
- $164.6K
- Period of performance
- Mar 22, 2022 – May 13, 2024
69056723F00058N
Completed: Period of performance ended Apr 14, 2024ID FLAP KOOTEN 8450(1), YELLOWSTONE TRAIL ROAD, SEGMENT 1 INDEPENDENT EXPERT REVIEW AND EVALUATION OF THE GEOTECHNICAL DESIGN…
Department of Transportation · Federal Highway Administration
- Obligated
- $68.4K
- Period of performance
- Jun 9, 2023 – Apr 14, 2024
69056723F00069N
Completed: Period of performance ended Mar 16, 2024WA FLAP PACIFI 12800(2), 67TH PLACE PUBLIC ENHANCEMENT TO WILLAPA NWR INTERMEDIATE DESIGN PHASES
Department of Transportation · Federal Highway Administration
- Obligated
- $61.7K
- Period of performance
- Jun 23, 2023 – Mar 16, 2024
69056723F00057N
Completed: Period of performance ended Jan 14, 2024WA ERFO FS GIFPN603 2020-1(1), GIFFORD PINCHOT REPAIRS 2020, PHASE 1 ENVIRONMENTAL TASKS
Department of Transportation · Federal Highway Administration
- Obligated
- $44.3K
- Period of performance
- Jun 9, 2023 – Jan 14, 2024
69056722F00109N
Completed: Period of performance ended Sep 14, 2023ID FLAP IDAHO NF17(1), MT. IDAHO GRADE ROAD REHABILITATION ENVIRONMENTAL ASSESSMENT
Department of Transportation · Federal Highway Administration
- Obligated
- $23.4K
- Period of performance
- Aug 15, 2022 – Sep 14, 2023
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
69056726F00081N under 69056722D000001 A/E ENGINEERING SUPPORT FOR OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $20K | Jul 13, 2026 – Feb 14, 2029 | Recompete 18+ mo: Potential end Feb 14, 2029 (27 months away) |
69056725F00074N under 69056722D000001 A/E DESIGN FOR WA ERFO NPS MORA 2022-2(2) MOUNT RAINIER ERFO REPAIRS PHASE 2 | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.1M | Aug 20, 2025 – Aug 14, 2028 | Recompete 18+ mo: Potential end Aug 14, 2028 (21 months away) |
69056724F00023N under 69056722D000001 OR FS MULTI 2023(2), MOUNT HOOD NF DRAINAGE STRUCTURES 30% PRELIMINARY ENGINEERING FOR MT. HOOD DRAINAGE STRUCTURES | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $857.9K | Apr 17, 2024 – Mar 15, 2028 | Recompete 12–18 mo: Potential end Mar 15, 2028 (16 months away)AI brief for award 69056724F00023NBid team for the recompete of award 69056724F00023N |
69056725F00064N under 69056722D000001 WA ERFO FS GIFPN603 2022-1(1) GIFFORD PINCHOT ERFO REPAIRS 2022 FINAL DESIGN | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $229K | Sep 10, 2025 – Jan 14, 2028 | Recompete 12–18 mo: Potential end Jan 14, 2028 (14 months away)AI brief for award 69056725F00064NBid team for the recompete of award 69056725F00064N |
69056724F00064N under 69056722D000001 MT DAR MALM 2025(2), ULM BRIDGE REPLACEMENT PLANNING TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $628.3K | Sep 24, 2024 – Dec 16, 2027 | Recompete 12–18 mo: Potential end Dec 16, 2027 (13 months away)AI brief for award 69056724F00064NBid team for the recompete of award 69056724F00064N |
69056726F00091N under 69056722D000001 A/E NEPA FOR WA FLAP LEWIS 79908(1), NISQUALLY RIVER BRIDGE SCOUR PROTECTION | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $91.7K | Aug 21, 2026 – Jun 14, 2027 | Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)AI brief for award 69056726F00091NBid team for the recompete of award 69056726F00091N |
69056726F00028N under 69056722D000001 COMPLETE THE DESIGN AND NEPA DOCUMENTATION FOR THE DENALI PARK PEDESTRIAN BRIDGE AND TRAIL PROJECT | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $477.3K | Oct 19, 2021 – Jun 14, 2027 | Recompete 6–12 mo: Potential end Jun 14, 2027 (7 months away)AI brief for award 69056726F00028NBid team for the recompete of award 69056726F00028N |
69056726F00095N under 69056722D000001 A/E FOR WA NP OLYM 104(2), FINLEY CREEK BRIDGE REHABILITATION | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $32.1K | Aug 27, 2026 – May 15, 2027 | Recompete 6–12 mo: Potential end May 15, 2027 (6 months away)AI brief for award 69056726F00095NBid team for the recompete of award 69056726F00095N |
69056726F00044N under 69056722D000001 A/E DESIGN FOR MT BR MAO 307(2), CANYON FERRY DAM SPILLWAY BRIDGE REHABILITATION | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $135.6K | Mar 23, 2026 – Apr 13, 2027 | Recompete < 6 mo: Potential end Apr 13, 2027 (4 months away)AI brief for award 69056726F00044NBid team for the recompete of award 69056726F00044N |
69056725F00059N under 69056722D000001 OREGON FEDERAL LANDS ACCESS PROGRAM SCOPING | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $210.2K | Sep 9, 2025 – Apr 6, 2026 | Completed: Period of performance ended Apr 6, 2026 |
69056725F00090N under 69056722D000001 A/E GEOTECHNICAL SUBSURFACE INVESTIGATION AND PRELIMINARY ENGINEERING FOR WA PWRO 2010(1) BACKBONE RIDGE VIADUCT #1 | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $218.3K | Sep 8, 2025 – Feb 14, 2026 | Completed: Period of performance ended Feb 14, 2026 |
69056723F00035N under 69056722D000001 OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS INTERMEDIATE THROUGH FINAL DESIGN PHASES | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $275.4K | Mar 23, 2023 – Feb 14, 2026 | Completed: Period of performance ended Feb 14, 2026 |
69056724F00071N under 69056722D000001 WFL RESEARCH 2024(2), ANCSA 17B GUIDEBOOK DEVELOPMENT PLANNING TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $237.8K | Sep 19, 2024 – Nov 15, 2025 | Completed: Period of performance ended Nov 15, 2025 |
69056725F00075N under 69056722D000001 MASTERWORKS/EEBACS CONVERSION, DESIGN SUPPORT | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $0 | Jul 22, 2025 – Sep 29, 2025 | Completed: Period of performance ended Sep 29, 2025 |
69056723F00052N under 69056722D000001 FLPP OR IP 2022(1), OREGON INTEGRATED PLANNING FLAP NEEDS ASSESSMENT PLANNING TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $125.2K | Jun 21, 2023 – May 31, 2025 | Completed: Period of performance ended May 31, 2025 |
69056723F00016N under 69056722D000001 AK FLAP DOT 1(2), TURNAGAIN PASS MASTER PLAN PLANNING SERVICES TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $448.7K | Feb 13, 2023 – May 16, 2025 | Completed: Period of performance ended May 16, 2025 |
69056722F00104N under 69056722D000001 ID BLM IFD 01000(1), CONANT BANK STABILIZATION ENVIRONMENTAL COMPLIANCE SERVICES TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $75.1K | Aug 24, 2022 – Apr 14, 2025 | Completed: Period of performance ended Apr 14, 2025 |
69056723F00083N under 69056722D000001 AK SEWARD 2019(1), LOWELL POINT ROAD PREPARATION OF SCOPING REPORT FOR SUBJECT PROJECT | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $154K | Sep 13, 2023 – Jun 10, 2024 | Completed: Period of performance ended Jun 10, 2024 |
69056722F000043 under 69056722D000001 OR FS ERFO 2020(1)-14(1), WALLA WALLA SOUTH - UMATILLA REPAIRS 2020, PHASE 1 ENVIRONMENTAL AND BIOLOGICAL ASSESSMENT | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $164.6K | Mar 22, 2022 – May 13, 2024 | Completed: Period of performance ended May 13, 2024 |
69056723F00058N under 69056722D000001 ID FLAP KOOTEN 8450(1), YELLOWSTONE TRAIL ROAD, SEGMENT 1 INDEPENDENT EXPERT REVIEW AND EVALUATION OF THE GEOTECHNICAL DESIGN… | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $68.4K | Jun 9, 2023 – Apr 14, 2024 | Completed: Period of performance ended Apr 14, 2024 |
69056723F00069N under 69056722D000001 WA FLAP PACIFI 12800(2), 67TH PLACE PUBLIC ENHANCEMENT TO WILLAPA NWR INTERMEDIATE DESIGN PHASES | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $61.7K | Jun 23, 2023 – Mar 16, 2024 | Completed: Period of performance ended Mar 16, 2024 |
69056723F00057N under 69056722D000001 WA ERFO FS GIFPN603 2020-1(1), GIFFORD PINCHOT REPAIRS 2020, PHASE 1 ENVIRONMENTAL TASKS | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $44.3K | Jun 9, 2023 – Jan 14, 2024 | Completed: Period of performance ended Jan 14, 2024 |
69056722F00109N under 69056722D000001 ID FLAP IDAHO NF17(1), MT. IDAHO GRADE ROAD REHABILITATION ENVIRONMENTAL ASSESSMENT | Department of Transportation · Federal Highway Administration | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $23.4K | Aug 15, 2022 – Sep 14, 2023 | Completed: Period of performance ended Sep 14, 2023 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 541320Landscape Architectural Services
- 541360Geophysical Surveying and Mapping Services
- 541370Surveying and Mapping (except Geophysical) Services
- 541620Environmental Consulting Services
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with DOWL, LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
