
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
OLSSON INDUSTRIAL ELECTRIC, INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Awards
140R2026C0001
Recompete 18+ mo: Potential end Apr 9, 2034 (88 months away)TRD GSU TRANSFORMER REPLACEMENTS
Department of the Interior · Bureau of Reclamation
W912DW25C0003
Recompete 12–18 mo: Potential end May 3, 2028 (17 months away)REPLACEMENT, DEMOLITION, INSTALLATION, AND/OR REFURBISHMENT OF ISOLATED PHASE BUS SECTIONS AT CHIEF JOSEPH DAM, BRIDGEPORT, WA.
Department of Defense · Department of the Army
W912DW24C0010
Recompete 6–12 mo: Potential end May 26, 2027 (6 months away)LIBBY DAM UNIT 6 INSTALLATION
Department of Defense · Department of the Army
W912EF21C0010
Recompete < 6 mo: Potential end Nov 19, 2026 (under a month away)MCNARY EXCITERS, GOVERNORS, AND POWERHOUSE CONTROLS UPGRADES
Department of Defense · Department of the Army
W9127N22C0007
Completed: Period of performance ended Sep 25, 2025FOSTER ELECTRICAL RELIABILITY UPGRADES
Department of Defense · Department of the Army
W912BV20C0002
Completed: Period of performance ended Sep 6, 2022MODERNIZATION OF THE ELECTRICAL INFRASTRUCTURE AT THE ROBERT S. KERR RESERVOIR POWERHOUSE.
Department of Defense · Department of the Army
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
140R2026C0001 TRD GSU TRANSFORMER REPLACEMENTS | Department of the Interior · Bureau of Reclamation | 237130 · Z2MDREPAIR OR ALTERATION OF EPG FACILITIES - HYDRO | $68.7M | May 1, 2026 – Apr 9, 2034 | Recompete 18+ mo: Potential end Apr 9, 2034 (88 months away) |
W912DW25C0003 |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
No SBIR/STTR awards on record
Source: SBIR.gov award records · sync date not recorded
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
REPLACEMENT, DEMOLITION, INSTALLATION, AND/OR REFURBISHMENT OF ISOLATED PHASE BUS SECTIONS AT CHIEF JOSEPH DAM, BRIDGEPORT, WA.
| Department of Defense · Department of the Army |
| 237990 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| $14.1M |
| Dec 10, 2024 – May 3, 2028 |
Recompete 12–18 mo: Potential end May 3, 2028 (17 months away)AI brief for award W912DW25C0003Bid team for the recompete of award W912DW25C0003 |
W912DW24C0010 LIBBY DAM UNIT 6 INSTALLATION | Department of Defense · Department of the Army | 237990 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $28.7M | Jun 10, 2024 – May 26, 2027 | Recompete 6–12 mo: Potential end May 26, 2027 (6 months away)AI brief for award W912DW24C0010Bid team for the recompete of award W912DW24C0010 |
W912EF21C0010 MCNARY EXCITERS, GOVERNORS, AND POWERHOUSE CONTROLS UPGRADES | Department of Defense · Department of the Army | 238210 · Z2KAREPAIR OR ALTERATION OF DAMS | $50.8M | Mar 9, 2021 – Nov 19, 2026 | Recompete < 6 mo: Potential end Nov 19, 2026 (under a month away)AI brief for award W912EF21C0010Bid team for the recompete of award W912EF21C0010 |
W9127N22C0007 FOSTER ELECTRICAL RELIABILITY UPGRADES | Department of Defense · Department of the Army | 238210 · Z2KAREPAIR OR ALTERATION OF DAMS | $7.6M | Mar 8, 2022 – Sep 25, 2025 | Completed: Period of performance ended Sep 25, 2025 |
W912BV20C0002 MODERNIZATION OF THE ELECTRICAL INFRASTRUCTURE AT THE ROBERT S. KERR RESERVOIR POWERHOUSE. | Department of Defense · Department of the Army | 335313 · N061INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $17.8M | Oct 28, 2019 – Sep 6, 2022 | Completed: Period of performance ended Sep 6, 2022 |
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026