KRISHER ELECTRIC LLC
- HARRISON, ID 83833-5001
- teamcorepro.com (company website, opens in a new tab)
- Other
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Women-Owned Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $2.1M
- Awards on record
- 12
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
KRISHER ELECTRIC LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About KRISHER ELECTRIC LLC
- Headquarters
- HARRISON, ID 83833-5001
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIGJQUHH84TNM3
- CAGE52WR1
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $2.1M
- Awards on record
- 12
- Top funding agencies
- Federal Aviation Administration
Awards
697DCK25C00060
Recompete 18+ mo: Potential end Mar 31, 2030 (40 months away)THE CONTRACTOR MUST FURNISH ALL SUPERVISION, LABOR, EQUIPMENT, MATERIALS, SUPPLIES, AND TOOLS REQUIRED TO CONTROL VEGETATION BY PRUNING…
Department of Transportation · Federal Aviation Administration
- Obligated
- $269.8K
- Period of performance
- Feb 24, 2025 – Mar 31, 2030
6973GH26C00105
Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)REPLACE LHA'S FOUNDATIONS AT EWK VASI IN IN NEWTON, KS IN ACCORDANCE WITH THE SOW, SPECS AND DRAWINGS.
Department of Transportation · Federal Aviation Administration
- Obligated
- $148.8K
- Period of performance
- Jun 5, 2026 – Dec 31, 2027
6973GH25C00089
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)EXTERIOR BUILDING REFURBISHMENT AT THE OKMULGEE, OK OKM VOR-NEW SIDING & PAINT ON VOR IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
Department of Transportation · Federal Aviation Administration
- Obligated
- $81K
- Period of performance
- Mar 11, 2025 – Dec 31, 2026
6973GH20C00095
Completed: Period of performance ended Sep 14, 2026PROCUREMENT FOR HLG RTR TILT DOWN POLE IN WHEELING, WV.
Department of Transportation · Federal Aviation Administration
- Obligated
- $0
- Period of performance
- Sep 3, 2020 – Sep 14, 2026
6973GH26C00073
Completed: Period of performance ended Aug 17, 2026KEOKUK, IA REPLACE VASI FOUNDATIONS EOK VASI RW 14 JCN: 21004997
Department of Transportation · Federal Aviation Administration
- Obligated
- $179.1K
- Period of performance
- Mar 26, 2026 – Aug 17, 2026
6973GH26P00941
Completed: Period of performance ended Feb 27, 2026PAYING TEAM CORE PROFESSIONALS TO CANCEL THE CONTRACT PER THOMAS NGUYEN. DUE LACK OF FUNDING TO INSTALL THE SHELTERS AT PALMDALE, CA…
Department of Transportation · Federal Aviation Administration
- Obligated
- $27.8K
- Period of performance
- Feb 5, 2026 – Feb 27, 2026
6973GH25P03139
Completed: Period of performance ended Feb 12, 2026DQJ MALSR STA 2 FOUNDATION REPLACEMENT LOCATED IN MADISON, WI. IN ACCORDANCE WITH ALL DOCUMENTATION PROVIDED.
Department of Transportation · Federal Aviation Administration
- Obligated
- $96.2K
- Period of performance
- Aug 13, 2025 – Feb 12, 2026
6973GH25C00081
Completed: Period of performance ended Sep 27, 2025PEORIA, IL - REPLACEMENT OF VASI AND REIL FOUNDATIONS SITE IN PEORIA, IL IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.
Department of Transportation · Federal Aviation Administration
- Obligated
- $133.2K
- Period of performance
- Mar 27, 2025 – Sep 27, 2025
697DCK19C00144
Completed: Period of performance ended Jun 30, 2025BASE YEAR FOR VEGETATION CONTROL SERVICES AT HONOLULU CONTROL FACILITY AND SOUTH KAUAI VORTAC (SOK VOR), SOUTH KAUAI NEXRAD (SOK…
Department of Transportation · Federal Aviation Administration
- Obligated
- $743.8K
- Period of performance
- May 23, 2019 – Jun 30, 2025
697DCK23C00245
Completed: Period of performance ended Mar 3, 2025CONSTRUCTION OF A HIGH POWER DISTANCE MEASURING EQUIPMENT (HPDME) AT THE PALOMAR-MCCLELLAN AIRPORT LOCATED IN CARLSBAD, CA
Department of Transportation · Federal Aviation Administration
- Obligated
- $232.6K
- Period of performance
- Jun 20, 2023 – Mar 3, 2025
6973GH23C00190
Completed: Period of performance ended Nov 15, 2024REPLACE THE EQUIPMENT SHELTER AT THE OUTER MARKER (OM) FACILITY IN SPRINGFIELD, IL IN ACCORDANCE WITH THE SPECIFICATIONS, THE SOW AND…
Department of Transportation · Federal Aviation Administration
- Obligated
- $142K
- Period of performance
- Sep 25, 2023 – Nov 15, 2024
697DCK20C00039
Completed: Period of performance ended Mar 17, 2022BASE PLUS 4 YEARS FOR TREE TRIMMING SERVICE AT FAA HONOLULU CONTROL FACILITY. THE COCONUT AND SHOWER TREES SHALL BE DONE TWICE A YEAR. ALL…
Department of Transportation · Federal Aviation Administration
- Obligated
- $59.3K
- Period of performance
- Dec 9, 2019 – Mar 17, 2022
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
697DCK25C00060 THE CONTRACTOR MUST FURNISH ALL SUPERVISION, LABOR, EQUIPMENT, MATERIALS, SUPPLIES, AND TOOLS REQUIRED TO CONTROL VEGETATION BY PRUNING… | Department of Transportation · Federal Aviation Administration | 561730 · S208HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING | $269.8K | Feb 24, 2025 – Mar 31, 2030 | Recompete 18+ mo: Potential end Mar 31, 2030 (40 months away) |
6973GH26C00105 REPLACE LHA'S FOUNDATIONS AT EWK VASI IN IN NEWTON, KS IN ACCORDANCE WITH THE SOW, SPECS AND DRAWINGS. | Department of Transportation · Federal Aviation Administration | 238110 · Z1BCMAINTENANCE OF RADAR AND NAVIGATIONAL FACILITIES | $148.8K | Jun 5, 2026 – Dec 31, 2027 | Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)AI brief for award 6973GH26C00105Bid team for the recompete of award 6973GH26C00105 |
6973GH25C00089 EXTERIOR BUILDING REFURBISHMENT AT THE OKMULGEE, OK OKM VOR-NEW SIDING & PAINT ON VOR IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. | Department of Transportation · Federal Aviation Administration | 238170 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $81K | Mar 11, 2025 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6973GH25C00089Bid team for the recompete of award 6973GH25C00089 |
6973GH20C00095 PROCUREMENT FOR HLG RTR TILT DOWN POLE IN WHEELING, WV. | Department of Transportation · Federal Aviation Administration | 238210 · Z1BCMAINTENANCE OF RADAR AND NAVIGATIONAL FACILITIES | $0 | Sep 3, 2020 – Sep 14, 2026 | Completed: Period of performance ended Sep 14, 2026 |
6973GH26C00073 KEOKUK, IA REPLACE VASI FOUNDATIONS EOK VASI RW 14 JCN: 21004997 | Department of Transportation · Federal Aviation Administration | 236220 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $179.1K | Mar 26, 2026 – Aug 17, 2026 | Completed: Period of performance ended Aug 17, 2026 |
6973GH26P00941 PAYING TEAM CORE PROFESSIONALS TO CANCEL THE CONTRACT PER THOMAS NGUYEN. DUE LACK OF FUNDING TO INSTALL THE SHELTERS AT PALMDALE, CA… | Department of Transportation · Federal Aviation Administration | 237130 · Y1HCCONSTRUCTION OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) ENVIRONMENTAL LABORATORIES | $27.8K | Feb 5, 2026 – Feb 27, 2026 | Completed: Period of performance ended Feb 27, 2026 |
6973GH25P03139 DQJ MALSR STA 2 FOUNDATION REPLACEMENT LOCATED IN MADISON, WI. IN ACCORDANCE WITH ALL DOCUMENTATION PROVIDED. | Department of Transportation · Federal Aviation Administration | 237130 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $96.2K | Aug 13, 2025 – Feb 12, 2026 | Completed: Period of performance ended Feb 12, 2026 |
6973GH25C00081 PEORIA, IL - REPLACEMENT OF VASI AND REIL FOUNDATIONS SITE IN PEORIA, IL IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS. | Department of Transportation · Federal Aviation Administration | 236220 · Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS | $133.2K | Mar 27, 2025 – Sep 27, 2025 | Completed: Period of performance ended Sep 27, 2025 |
697DCK19C00144 BASE YEAR FOR VEGETATION CONTROL SERVICES AT HONOLULU CONTROL FACILITY AND SOUTH KAUAI VORTAC (SOK VOR), SOUTH KAUAI NEXRAD (SOK… | Department of Transportation · Federal Aviation Administration | 561730 · S208HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING | $743.8K | May 23, 2019 – Jun 30, 2025 | Completed: Period of performance ended Jun 30, 2025 |
697DCK23C00245 CONSTRUCTION OF A HIGH POWER DISTANCE MEASURING EQUIPMENT (HPDME) AT THE PALOMAR-MCCLELLAN AIRPORT LOCATED IN CARLSBAD, CA | Department of Transportation · Federal Aviation Administration | 236220 · Y1BCCONSTRUCTION OF RADAR AND NAVIGATIONAL FACILITIES | $232.6K | Jun 20, 2023 – Mar 3, 2025 | Completed: Period of performance ended Mar 3, 2025 |
6973GH23C00190 REPLACE THE EQUIPMENT SHELTER AT THE OUTER MARKER (OM) FACILITY IN SPRINGFIELD, IL IN ACCORDANCE WITH THE SPECIFICATIONS, THE SOW AND… | Department of Transportation · Federal Aviation Administration | 236220 · Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | $142K | Sep 25, 2023 – Nov 15, 2024 | Completed: Period of performance ended Nov 15, 2024 |
697DCK20C00039 BASE PLUS 4 YEARS FOR TREE TRIMMING SERVICE AT FAA HONOLULU CONTROL FACILITY. THE COCONUT AND SHOWER TREES SHALL BE DONE TWICE A YEAR. ALL… | Department of Transportation · Federal Aviation Administration | 561730 · S208HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING | $59.3K | Dec 9, 2019 – Mar 17, 2022 | Completed: Period of performance ended Mar 17, 2022 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 238210Electrical Contractors and Other Wiring Installation ContractorsPrimarySmall business under this code’s size standard
- 221122Title not in the curated listSmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 236220Commercial and Institutional Building ConstructionSmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 237310Highway, Street, and Bridge ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure ContractorsSmall business under this code’s size standard
- 238120Structural Steel and Precast Concrete ContractorsSmall business under this code’s size standard
- 238130Title not in the curated listSmall business under this code’s size standard
- 238140Title not in the curated listSmall business under this code’s size standard
- 238160Roofing ContractorsSmall business under this code’s size standard
- 238170Title not in the curated listSmall business under this code’s size standard
- 238290Other Building Equipment ContractorsSmall business under this code’s size standard
- 238390Other Building Finishing ContractorsSmall business under this code’s size standard
- 238910Site Preparation ContractorsSmall business under this code’s size standard
- 238990All Other Specialty Trade Contractors
- 541350Building Inspection ServicesSmall business under this code’s size standard
- 561720Janitorial ServicesSmall business under this code’s size standard
- 561730Landscaping ServicesSmall business under this code’s size standard
- 812930Title not in the curated listSmall business under this code’s size standard
SAM.gov reports this entity as small under 19 of 21 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Self-represented in SAM.gov. WOSB and EDWOSB set-asides need SBA certification (13 CFR 127.300); SDVOSB and VOSB need SBA VetCert (13 CFR part 128). Confirm current certification before relying on it.
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with KRISHER ELECTRIC LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
