MICHAEL BAKER INTERNATIONAL & HUITT-ZOLLARS JV
- DALLAS, TX 75234-6800
- Partnership or Limited Liability Partnership
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $44.3M
- Awards on record
- 14
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
MICHAEL BAKER INTERNATIONAL & HUITT-ZOLLARS JV has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About MICHAEL BAKER INTERNATIONAL & HUITT-ZOLLARS JV
- Headquarters
- DALLAS, TX 75234-6800
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIGKW8CA2K4SY8
- CAGE89VP4
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $44.3M
- Awards on record
- 14
- Top funding agencies
- Department of the Army
Awards
W9126G23F0082
Recompete 18+ mo: Potential end Oct 27, 2030 (47 months away)WEST SIDE CREEKS (SAN PEDRO, APACHE, MARTINEZ AND ALAZAN) AE (DESIGN)
Department of Defense · Department of the Army
- Obligated
- $13.4M
- Period of performance
- Feb 13, 2023 – Oct 27, 2030
W9126G24F0427
Recompete 18+ mo: Potential end Sep 29, 2029 (34 months away)MINIMUM GUARANTEE
Department of Defense · Department of the Army
- Obligated
- $2.5K
- Period of performance
- Sep 30, 2024 – Sep 29, 2029
W9123823F0007
Recompete 12–18 mo: Potential end Jan 31, 2028 (14 months away)PROJECT TITLE AND LOCATION: FY2024 F-35 T-7A EAST CAMPUS INFRASTRUCTURE, HILL AIR FORCE BASE, UTAH (100% DESIGN AND ADVERTISING PHASE…
Department of Defense · Department of the Army
- Obligated
- $5.6M
- Period of performance
- Dec 22, 2022 – Jan 31, 2028
W9123822F0017
Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)PROJECT TITLE AND LOCATION: F-35 COMPOSITE REPAIR AND TRAINING FACILITY, PHASE I, HILL AFB, UT (D-B RFP SUBMITTAL AND ADVERTISING SERVICES).
Department of Defense · Department of the Army
- Obligated
- $2.4M
- Period of performance
- Mar 18, 2022 – Aug 31, 2027
W9126G24F0026
Recompete < 6 mo: Potential end Jan 8, 2027 (1 month away)NET-ZERO UPH: PROVIDE COMPLETE CONSTRUCTION DOCUMENTS, INCLUDING PLANS, SPECIFICATIONS, DESIGN ANALYSIS AND CURRENT WORKING ESTIMATES FOR…
Department of Defense · Department of the Army
- Obligated
- $10.2M
- Period of performance
- Dec 15, 2023 – Jan 8, 2027
W9123822F0024
Completed: Period of performance ended Oct 31, 2026PROJECT TITLE AND LOCATION: T-7A DEPOT MAINTENANCE COMPLEX, PN KRSM183007, HILL AIR FORCE BASE, UT
Department of Defense · Department of the Army
- Obligated
- $3.8M
- Period of performance
- May 6, 2022 – Oct 31, 2026
W912BV23F0089
Completed: Period of performance ended Oct 17, 2026A-E DESIGN OF THE FY 26 CHILD DEVELOPMENT CENTER ON TINKER AFB, OK.
Department of Defense · Department of the Army
- Obligated
- $4.1M
- Period of performance
- Jul 5, 2023 – Oct 17, 2026
W9123822F0023
Completed: Period of performance ended Aug 31, 2026PROJECT TITLE AND LOCATION: F-35 MAINTENANCE FACILITY, PHASE I, HILL AFB, UT
Department of Defense · Department of the Army
- Obligated
- $3.3M
- Period of performance
- Apr 19, 2022 – Aug 31, 2026
W9126G25FA095
Completed: Period of performance ended Dec 9, 2025ARMY COS WAREHOUSE TECHNOLOGY STUDY
Department of Defense · Department of the Army
- Obligated
- $108.4K
- Period of performance
- Sep 10, 2025 – Dec 9, 2025
W912PP22F0029
Completed: Period of performance ended Feb 28, 2025TASK ORDER W912PP22F0029 -BLDG 20602 AND WSMR PHETS RENOVATIONS AND UPGRADES AND BLDG 20451 SECURITY AND SCIF UPGRADES DEFENSE THREAT…
Department of Defense · Department of the Army
- Obligated
- $1.1M
- Period of performance
- Sep 28, 2022 – Feb 28, 2025
W912PP23F0034
Completed: Period of performance ended May 31, 2024INFRASTRUCTURE IMPROVEMENTS AT THE CHESTNUT TEST SITE ON KIRTLAND AIR FORCE BASE
Department of Defense · Department of the Army
- Obligated
- $344.6K
- Period of performance
- Sep 26, 2023 – May 31, 2024
W9126G23F0185
Completed: Period of performance ended May 4, 2024AE COS MIN GUARANTEE
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- May 5, 2023 – May 4, 2024
W912PP21F0029
Completed: Period of performance ended Feb 15, 2023TASK ORDER W912PP21F0029 - NEW SCIENCE & TECHNOLOGY ON-ORBIT RESEARCH MISSION OPERATIONS CENTER (STORM), KAFB
Department of Defense · Department of the Army
- Obligated
- $492.5K
- Period of performance
- Sep 21, 2021 – Feb 15, 2023
W50UW820F0012
Completed: Period of performance ended Sep 29, 2022HORIZONTAL AE SERVICES FOR LAREDO 7 (52 MILES) FOR THE DEVELOPMENT OF A - 15% DB RFP PACKAGE. THIS TO HAS A BASE CLIN WITH W/ 10 OPTIONS 0…
Department of Defense · Department of the Army
- Obligated
- $17.7M
- Period of performance
- Apr 24, 2020 – Sep 29, 2022
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W9126G23F0082 under W912BV19D0020 WEST SIDE CREEKS (SAN PEDRO, APACHE, MARTINEZ AND ALAZAN) AE (DESIGN) | Department of Defense · Department of the Army | 541330 · C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | $13.4M | Feb 13, 2023 – Oct 27, 2030 | Recompete 18+ mo: Potential end Oct 27, 2030 (47 months away) |
W9126G24F0427 under W9126G24D0024 MINIMUM GUARANTEE | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2.5K | Sep 30, 2024 – Sep 29, 2029 | Recompete 18+ mo: Potential end Sep 29, 2029 (34 months away) |
W9123823F0007 under W912PP21D0004 PROJECT TITLE AND LOCATION: FY2024 F-35 T-7A EAST CAMPUS INFRASTRUCTURE, HILL AIR FORCE BASE, UTAH (100% DESIGN AND ADVERTISING PHASE… | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $5.6M | Dec 22, 2022 – Jan 31, 2028 | Recompete 12–18 mo: Potential end Jan 31, 2028 (14 months away)AI brief for award W9123823F0007Bid team for the recompete of award W9123823F0007 |
W9123822F0017 under W912PP21D0004 PROJECT TITLE AND LOCATION: F-35 COMPOSITE REPAIR AND TRAINING FACILITY, PHASE I, HILL AFB, UT (D-B RFP SUBMITTAL AND ADVERTISING SERVICES). | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $2.4M | Mar 18, 2022 – Aug 31, 2027 | Recompete 6–12 mo: Potential end Aug 31, 2027 (9 months away)AI brief for award W9123822F0017Bid team for the recompete of award W9123822F0017 |
W9126G24F0026 under W9126G23D0019 NET-ZERO UPH: PROVIDE COMPLETE CONSTRUCTION DOCUMENTS, INCLUDING PLANS, SPECIFICATIONS, DESIGN ANALYSIS AND CURRENT WORKING ESTIMATES FOR… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $10.2M | Dec 15, 2023 – Jan 8, 2027 | Recompete < 6 mo: Potential end Jan 8, 2027 (1 month away)AI brief for award W9126G24F0026Bid team for the recompete of award W9126G24F0026 |
W9123822F0024 under W912PP21D0004 PROJECT TITLE AND LOCATION: T-7A DEPOT MAINTENANCE COMPLEX, PN KRSM183007, HILL AIR FORCE BASE, UT | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $3.8M | May 6, 2022 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
W912BV23F0089 under W912BV20D0029 A-E DESIGN OF THE FY 26 CHILD DEVELOPMENT CENTER ON TINKER AFB, OK. | Department of Defense · Department of the Army | 541330 · C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | $4.1M | Jul 5, 2023 – Oct 17, 2026 | Completed: Period of performance ended Oct 17, 2026 |
W9123822F0023 under W912PP21D0004 PROJECT TITLE AND LOCATION: F-35 MAINTENANCE FACILITY, PHASE I, HILL AFB, UT | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $3.3M | Apr 19, 2022 – Aug 31, 2026 | Completed: Period of performance ended Aug 31, 2026 |
W9126G25FA095 under W9126G23D0019 ARMY COS WAREHOUSE TECHNOLOGY STUDY | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $108.4K | Sep 10, 2025 – Dec 9, 2025 | Completed: Period of performance ended Dec 9, 2025 |
W912PP22F0029 under W912PP21D0004 TASK ORDER W912PP22F0029 -BLDG 20602 AND WSMR PHETS RENOVATIONS AND UPGRADES AND BLDG 20451 SECURITY AND SCIF UPGRADES DEFENSE THREAT… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $1.1M | Sep 28, 2022 – Feb 28, 2025 | Completed: Period of performance ended Feb 28, 2025 |
W912PP23F0034 under W912PP21D0004 INFRASTRUCTURE IMPROVEMENTS AT THE CHESTNUT TEST SITE ON KIRTLAND AIR FORCE BASE | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $344.6K | Sep 26, 2023 – May 31, 2024 | Completed: Period of performance ended May 31, 2024 |
W9126G23F0185 under W9126G23D0019 AE COS MIN GUARANTEE | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $0 | May 5, 2023 – May 4, 2024 | Completed: Period of performance ended May 4, 2024 |
W912PP21F0029 under W912PP21D0004 TASK ORDER W912PP21F0029 - NEW SCIENCE & TECHNOLOGY ON-ORBIT RESEARCH MISSION OPERATIONS CENTER (STORM), KAFB | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $492.5K | Sep 21, 2021 – Feb 15, 2023 | Completed: Period of performance ended Feb 15, 2023 |
W50UW820F0012 under W912BV19D0020 HORIZONTAL AE SERVICES FOR LAREDO 7 (52 MILES) FOR THE DEVELOPMENT OF A - 15% DB RFP PACKAGE. THIS TO HAS A BASE CLIN WITH W/ 10 OPTIONS 0… | Department of Defense · Department of the Army | 541330 · C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | $17.7M | Apr 24, 2020 – Sep 29, 2022 | Completed: Period of performance ended Sep 29, 2022 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
- C1AZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS
- C1BAARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TOWERS
- C1BDARCHITECT AND ENGINEERING- CONSTRUCTION: AIRPORT RUNWAYS AND TAXIWAYS
- C1BEARCHITECT AND ENGINEERING- CONSTRUCTION: AIRPORT TERMINALS
- C1BZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES
- C1CAARCHITECT AND ENGINEERING- CONSTRUCTION: SCHOOLS
- C1CZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER EDUCATIONAL BUILDINGS
- C1EAARCHITECT AND ENGINEERING- CONSTRUCTION: AMMUNITION FACILITIES
- C1EBARCHITECT AND ENGINEERING- CONSTRUCTION: MAINTENANCE BUILDINGS
- C1ECARCHITECT AND ENGINEERING- CONSTRUCTION: PRODUCTION BUILDINGS
- C1EZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER INDUSTRIAL BUILDINGS
- C1FAARCHITECT AND ENGINEERING- CONSTRUCTION: FAMILY HOUSING FACILITIES
- C1FBARCHITECT AND ENGINEERING- CONSTRUCTION: RECREATIONAL BUILDINGS
- C1FCARCHITECT AND ENGINEERING- CONSTRUCTION: TROOP HOUSING FACILITIES
- C1FZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER RESIDENTIAL BUILDINGS
- C1GAARCHITECT AND ENGINEERING- CONSTRUCTION: AMMUNITION STORAGE BUILDINGS
- C1GDARCHITECT AND ENGINEERING- CONSTRUCTION: OPEN STORAGE FACILITIES
- C1GZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER WAREHOUSE BUILDINGS
- C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS
- C1KAARCHITECT AND ENGINEERING- CONSTRUCTION: DAMS
- C1KBARCHITECT AND ENGINEERING- CONSTRUCTION: CANALS
- C1KCARCHITECT AND ENGINEERING- CONSTRUCTION: MINE FIRE CONTROL FACILITIES
- C1LAARCHITECT AND ENGINEERING- CONSTRUCTION: AIRPORT SERVICE ROADS
- C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- C1LCARCHITECT AND ENGINEERING- CONSTRUCTION: TUNNELS AND SUBSURFACE STRUCTURES
- C1NDARCHITECT AND ENGINEERING- CONSTRUCTION: SEWAGE AND WASTE FACILITIES
- C1NEARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
- C1NZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER UTILITIES
- C1PAARCHITECT AND ENGINEERING- CONSTRUCTION: RECREATIONAL FACILITIES (NON-BUILDING)
- C1PDARCHITECT AND ENGINEERING- CONSTRUCTION: WASTE TREATMENT AND STORAGE FACILITIES
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with MICHAEL BAKER INTERNATIONAL & HUITT-ZOLLARS JV?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
