TETRA TECH, INC.
Doing business as TETRA TECH
- BELLEVUE, WA 98004-5540
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $70.6M
- Awards on record
- 12
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
TETRA TECH, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About TETRA TECH, INC.
- Headquarters
- BELLEVUE, WA 98004-5540
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIGMW1WKSRWQW3
- CAGE6MLJ7
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $70.6M
- Awards on record
- 12
- Top funding agencies
- Department of the Army
Awards
W912P426FA003
Recompete 18+ mo: Potential end Nov 18, 2030 (48 months away)BIG JOHN SALVAGE - HOULT ROAD SUPERFUND SITE ADDITIONAL ARCHITECT- ENGINEER DESIGN SERVICES TO DESIGN NON-TIME CRITICAL REMOVAL ACTIONS IN…
Department of Defense · Department of the Army
- Obligated
- $1.4M
- Period of performance
- Nov 18, 2025 – Nov 18, 2030
W9127N25FA074
Recompete 18+ mo: Potential end Sep 29, 2030 (46 months away)MINIMUM GUARANTEE TASK ORDER FOR W9127N25DA006
Department of Defense · Department of the Army
- Obligated
- $5K
- Period of performance
- Sep 30, 2025 – Sep 29, 2030
W911XK26FA031
Recompete 18+ mo: Potential end Nov 13, 2029 (35 months away)NEW LOCK AT THE SOO ENGINEERING DURING CONSTRUCTION SUPPORT FOR HANDS FREE MOORING SYSTEM
Department of Defense · Department of the Army
- Obligated
- $661.9K
- Period of performance
- May 14, 2026 – Nov 13, 2029
W912EK23F0089
Recompete 18+ mo: Potential end Nov 6, 2029 (35 months away)LAGRANGE DAM - 1200' LOCK 35-100% DESIGN.
Department of Defense · Department of the Army
- Obligated
- $34.5M
- Period of performance
- Sep 26, 2023 – Nov 6, 2029
W912QR23F0316
Recompete 18+ mo: Potential end May 16, 2028 (18 months away)GUARANTEED AMOUNT
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- Aug 7, 2023 – May 16, 2028
W912P926FA132
Recompete 6–12 mo: Potential end Jul 16, 2027 (8 months away)LOCK 25 NESP ENGINEERING SERVICES
Department of Defense · Department of the Army
- Obligated
- $243.8K
- Period of performance
- Jun 17, 2026 – Jul 16, 2027
W912QR23F0411
Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AE SERVICES FOR WPAFB HVAC RENOVATION
Department of Defense · Department of the Army
- Obligated
- $930.2K
- Period of performance
- Sep 22, 2023 – Jun 30, 2027
W912P524F0007
Completed: Period of performance ended Oct 31, 2026KY LOCK APPROACH WALL DESIGN TASK ORDER
Department of Defense · Department of the Army
- Obligated
- $8.5M
- Period of performance
- Oct 26, 2023 – Oct 31, 2026
W912QR25FA159
Completed: Period of performance ended Sep 30, 2026ARMY RESERVE CENTER OF THE FUTURE CONCEPT DEVELOPMENT
Department of Defense · Department of the Army
- Obligated
- $1.2M
- Period of performance
- Sep 26, 2025 – Sep 30, 2026
W912P924F0036
Completed: Period of performance ended Jul 20, 2026LOCK AND DAM 25 NESP NO. 5
Department of Defense · Department of the Army
- Obligated
- $2.8M
- Period of performance
- Feb 7, 2024 – Jul 20, 2026
W9128F24F0079
Completed: Period of performance ended Feb 22, 2025SENTINEL PROGRAM ENVIRONMENTAL PERMITTING AND COMPLIANCE SUPPORT
Department of Defense · Department of the Army
- Obligated
- $20.1M
- Period of performance
- Feb 23, 2024 – Feb 22, 2025
W912P524F0014
Completed: Period of performance ended Nov 30, 2024OHIO RIVER LOW FLOW IES
Department of Defense · Department of the Army
- Obligated
- $332.4K
- Period of performance
- Nov 14, 2023 – Nov 30, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W912P426FA003 under W912QR23D0047 BIG JOHN SALVAGE - HOULT ROAD SUPERFUND SITE ADDITIONAL ARCHITECT- ENGINEER DESIGN SERVICES TO DESIGN NON-TIME CRITICAL REMOVAL ACTIONS IN… | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $1.4M | Nov 18, 2025 – Nov 18, 2030 | Recompete 18+ mo: Potential end Nov 18, 2030 (48 months away) |
W9127N25FA074 under W9127N25DA006 MINIMUM GUARANTEE TASK ORDER FOR W9127N25DA006 | Department of Defense · Department of the Army | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $5K | Sep 30, 2025 – Sep 29, 2030 | Recompete 18+ mo: Potential end Sep 29, 2030 (46 months away) |
W911XK26FA031 under W912QR23D0047 NEW LOCK AT THE SOO ENGINEERING DURING CONSTRUCTION SUPPORT FOR HANDS FREE MOORING SYSTEM | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $661.9K | May 14, 2026 – Nov 13, 2029 | Recompete 18+ mo: Potential end Nov 13, 2029 (35 months away) |
W912EK23F0089 under W912QR23D0047 LAGRANGE DAM - 1200' LOCK 35-100% DESIGN. | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $34.5M | Sep 26, 2023 – Nov 6, 2029 | Recompete 18+ mo: Potential end Nov 6, 2029 (35 months away) |
W912QR23F0316 under W912QR23D0047 GUARANTEED AMOUNT | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $0 | Aug 7, 2023 – May 16, 2028 | Recompete 18+ mo: Potential end May 16, 2028 (18 months away) |
W912P926FA132 under W912QR23D0047 LOCK 25 NESP ENGINEERING SERVICES | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $243.8K | Jun 17, 2026 – Jul 16, 2027 | Recompete 6–12 mo: Potential end Jul 16, 2027 (8 months away)AI brief for award W912P926FA132Bid team for the recompete of award W912P926FA132 |
W912QR23F0411 under W912QR23D0047 AE SERVICES FOR WPAFB HVAC RENOVATION | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $930.2K | Sep 22, 2023 – Jun 30, 2027 | Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AI brief for award W912QR23F0411Bid team for the recompete of award W912QR23F0411 |
W912P524F0007 under W912QR23D0047 KY LOCK APPROACH WALL DESIGN TASK ORDER | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $8.5M | Oct 26, 2023 – Oct 31, 2026 | Completed: Period of performance ended Oct 31, 2026 |
W912QR25FA159 under W912QR23D0047 ARMY RESERVE CENTER OF THE FUTURE CONCEPT DEVELOPMENT | Department of Defense · Department of the Army | 541330 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $1.2M | Sep 26, 2025 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
W912P924F0036 under W912QR23D0047 LOCK AND DAM 25 NESP NO. 5 | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2.8M | Feb 7, 2024 – Jul 20, 2026 | Completed: Period of performance ended Jul 20, 2026 |
W9128F24F0079 under W912QR23D0047 SENTINEL PROGRAM ENVIRONMENTAL PERMITTING AND COMPLIANCE SUPPORT | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $20.1M | Feb 23, 2024 – Feb 22, 2025 | Completed: Period of performance ended Feb 22, 2025 |
W912P524F0014 under W912QR23D0047 OHIO RIVER LOW FLOW IES | Department of Defense · Department of the Army | 541330 · B532SPECIAL STUDIES/ANALYSIS- SOIL | $332.4K | Nov 14, 2023 – Nov 30, 2024 | Completed: Period of performance ended Nov 30, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
No reported sub-awards as a subcontractor.
Subcontractors it has used
- STANLEY CONSULTANTS, INC
UEI PJ9GCM1WWYL9
$8.2M
Subcontracted by this company · 1 sub-award · latest Dec 12, 2023
- Department of the Army
- “STANLEY WILL PROVIDE DESIGN AND ENGINEERING SERVICES IN SUPPORT OF THE PREPARE DESIGN DOCUMENTS FOR LAGRANGE 1200-FOOT LOCK DESIGN 35% TO 100% DESIGN PROJECT. STANLEY IN COORDINATION WITH TETRA TECH WILL WORK ON: DESIGN PACKAGE 2 - SITE DEVELOPMENT AND UTILITIES DESIGN PACKAGE 3 - COFFERDAM AND FOUNDATION CONSTRUCTION (TT AND SCI) DESIGN PACKAGE 4 - LOCK WALLS AND SUPPORTING FACILITIES (TT AND SCI) DESIGN PACKAGE 5 - GUIDEWALL CONSTRUCTION (TT AND SCI) DESIGN PACKAGE 6 - APPROACH CHANEL SITE WORK. STANLEY WILL FOLLOW THE QC PROCEDURES AND REQUIREMENTS OF THE SCOPE OF WORK AND PROJECT QC PLAN DEVELOPED FOR THIS PROJECT. SCI WILL REPRESENT THE PROJECT ELEMENTS FOR THE FOLLOWING MEETINGS: 1) TASK ORDER KICK-OFF MEETING 2) COST AND SCHEDULE RISK ANALYSIS WORKSHOP 3) RECURRING TASK ORDER PROGRESS MEETINGS 4) RECURRING TASK DESIGN PACKAGE PROGRESS MEETINGS 5) DESIGN REVIEW MEETINGS 6) FACE-TO-FACE MEETINGS 7) SITE VISITS INCLUDING BUT NOT LIMITED TO THE FOLLOWING ROLES: HYDRAULIC ENGINEER, ENVIRONMENTAL ENGINEER, ARCHITECT AND FISHERIES BIOLOGIST.”
- CRAWFORD CONSULTING SERVICES, INC.
UEI EBD9AKJ8QXT9
$980.7K
Subcontracted by this company · 1 sub-award · latest Jan 22, 2024
- Department of the Army
- “CRAWFORD IS PRIMARILY RESPONSIBLE FOR DEVELOPING AND DOCUMENTING THE WORK ITEMS ASSOCIATED WITH THE CONSTRUCTION COST ESTIMATE AND CONSTRUCTION SCHEDULE. CRAWFORD WILL BE RESPONSBILE FOR 6.1) DECISION LOG; 6.2) QUALITY CONTROL PLAN; 6.3) SAFETY PLAN; 6.4) GENERAL DESIGN PACKAGE REQUIREMENTS; 6.7) SPECIFICATIONS; 6.8) COMPUTATIONS; 6.9) DESING DOCUMENTATION REPORT; 6.10) COST ESTIMATE AND SCHEDULE; 6.11) SCHEDULE AND PHASE DRAWINGS; 6.13) FINAL CONTRACT SUBMITTAL. MAJOR WORK ITEMS INCLUE 7.1) PRE-DESIGN SUBMITTALS; 7.1.2) SAFETY PLAN; 7.1.3) OPERATIONS SECURITY; 7.1.5) CODE, GUIDES, AND STANDARDS; 7.2) DESIGN PKG 1-HYDAULIC STEEL STRUCTURES AND OPERATION MACHINERY; 7.3) DESIGN PKG 2-SITE DEVELOPMENT AND UTILITIES; 7.4) DESIGN PKG 3-COFFERDAM AND FOUNDATION CONSTRUCTION; 7.5) DESIGN PKG 4-LOCK WALLS AND SUPPORTING FACILITIES; 7.6) DESIGN PKG 5-GUIDEWALL CONSTRUCTION; 7.7) DESIGN PKG 6-APPROACH CHANNEL SITE WORK.”
- STANLEY CONSULTANTS, INC.
UEI K9NLKXNE7J56
$673.9K
Subcontracted by this company · 1 sub-award · latest May 15, 2024
- Department of the Army
- “STANELY CONSULTANTS SCOPE OF WORK INCLUDES: 1) PREPARING DESIGN COMPUTATIONS FOR THE PROJECT ELEMENTS THEY ARE RESPONSIBLE FOR; 2) GENERAL GEOTECHNICAL SUPPORT FOR THE GEOTECHNICAL REPORT FOR SECTION 4.1.1.1; 3) DEVELOPING DRAWINGS FOR APRON DEMOLITION AND JET GROUTING/PERMEATION GROUTING, SPECIFICATION WRITING AND DDR UPDATES FOR SECTION 4.1.1.2; 4) PROVIDE GEOTECHNICAL SUPPORT TO FINALIZE DEMOLITION PLAN AND SEQUENCE (MONOLITHS 228 & 229, APRON, TIMBER PILES) AND TO FINALIZE CONSTRUCTION SEQUENCE AND LOCK OPERATION LIMITATIONS/STRUTTING SUPPORT GEOTECH/DEVELOP DETAILS FOR PERMEATION/JET GROUTING REQUIREMENTS, DEVELOP DEMOLITION AND PERMEATION/JET GROUTING DRAWINGS, WRITING SPECS, DETAILED MATERIAL QUANTITIES, AND DDR UPDATES. PROVIDE GENERAL GEOTECH SUPPORT AS PART OF SECTION 4.5 GEOTECHNICAL REPORT; 5) EVALUATE BULKHEAD SLOT AND SILL LOCATIONS AND WRITING A MEMO WITH RECOMMENDED LOCATION, SILL AND SEEPAGE CUTOFF WALL EVALUATION AND DESIGN, SILL DESIGN INCLUDING COMPUTATIONS, DWGS, SPECS DETAILED MATERIAL QUANTITIES AND DDR; 6) GENERAL GEOTECH SUPPORT FOR CONSTRUCTION SEQUENCE METHOD FOR RIVER WALL MONOLITHS AND INTERMEDIATE WALL MONOLITHS; 7) ATTEND INTERNAL BI-WEEKLY CONFERENCE CALLS AND BI-WEEKLY CONFERENCE CALLS WITH THE GOVERNMENT TO COORDINATE WORK AND PROVIDE UPDATES”
- ATHENA ENGINEERING & ENVIRONMENTAL, LLC
UEI WD7KMH37BQG7
$252.7K
Subcontracted by this company · 1 sub-award · latest Dec 31, 2024
- Department of the Army
- “MOD ISSUED TO ADD ITR OF THE GEOTECHNICAL PROJECT ELEMENTS FOR THE GENERAL DESIGN PACKAGE, DRAWINGS, SPECIFICATIONS, COMPUTATIONS, AND DDR. PROVIDE ITR OF THE GEOTECHNICAL AND CONCRETE DESIGN REPORT. ADDING DESIGN PACKAGE 2 SITE DEVELOPMENT AND UTILITIES INCLUDING ITR OF THE GEOTECHNICAL ELEMENTS FOR THE 65% AND 100% DESIGN DELIVERABLES INCLUDING LAND CLEARING, DEMOLITION, GRADING, TEMPORARY CONSTRUCTION FACILITIES AND UTILITY INSTALLATION. ADD DESIGN PACKAGE 3 COFFERDAM AND FOUNDATION CONSTRUCTION INCLUDING ITR OF THE GEOTECHNICAL ELEMENTS. ITR AT 35%, 65% AND 100% DESIGN DELIVERABLES. DESIGN PACKAGE 3 INCLUDES CONSTRUCTION OF COFFERDAMS NECESSARY TO ALLOW CONSTRUCTION OF THE LOCK CHAMBER IN THE DRY, INCLUDING ACCESS RAMSP(S), DEWATERING SYSTEM, STABILIZATION FOR THE EXISTING LOCK, EXCAVATION OF THE NEW LOCK FOOTPRINT, AND THE CONSTRUCTION OF LOCK FOUNDATION. ADD DESIGN PACKAGE 4 LOCK WALLS AND SUPPORTING FACILITIES INCLUDING ITR OF THE GEOTECHNICAL ELEMENTS. ADD PERFORMING ITR OF THE GEOTECHNICAL ELEMENTS ASSOCIATED WITH DESIGN PACKAGE 4 NEW CENTRAL CONTROL STATION, STORAGE AREA OF EXISTING LOCK FLEET, DAM SAFETY INSTRUMENTATION, MECHANICAL COMPONENTS OF BUBBLER SYSTEM, AND ITR OF GEOTECHNICAL ELEMENTS OF THE GEOTECHNICAL AND CONCRETE DESIGN. ADD DESIGN PACKAGE 5 GUIDE WALL CONSTRUCTION INCLUDING ITR OF GEOTECH ELEMENTS, EXCAVATION, GUIDE WALL FOUNDATIONS AND MONOLITHS. ADD DESIGN PACKAGE 6 APPROACH CHANNEL SITE WORK INCLUDING ITR OF GEOTECHNICAL ELEMENTS INCLUDING EXCAVATION OF THE UPSTREAM AND DOWNSTREAM APPROACH CHANNELS.”
- POOLE FIRE PROTECTION, INC.
UEI DUHZCTQHSJ71
$233.3K
Subcontracted by this company · 1 sub-award · latest Mar 25, 2025
- Department of the Army
- “POOLE FIRE PROTECTION IS PRIMARILY RESPONSIBLE FOR PROVIDING FIRE PROTECTION DESIGN FOR THE PROJECT ELEMENTS THEY ARE RESPONSIBLE FOR.POOLE TO REPRESENT FIRE PROTECTION ENGINEER FOR DESIGN PACKAGE 4 IN THE FOLLOWING MEETINGS: RECURRING TASK ORDER PROGRESS MEETING (UP TO 60 VIRTUAL1-HR MEETINGS) AND RECURRING DESIGN PACKAGE PROGRESS MEETINGS (UP TO 60 VIRTUAL 1-HR MEETINGS) AND DESIGN REVIEW MEETINGS (UP TO 60 VIRTUAL 1-HR MEETINGS). POOLE WILL CONDUCT A COMPLETE NFPA AND UFC CODE ANALYSIS INCLUDING AN EVALUATION OF BUILDING USE TO DETERMINE IF FIRE SUPPRESSION IS REQUIRED AND IF STRUCTUAL OR FUNCTIONAL CHANGES CAN BE MADE TO THE BUILDINGS SO THAT FIRE SUPPRESSION IS NOT REQUIRED. ANALYSIS WILL BE DOCUMENTS AS PART OF THE DDR. POOLE IS RESPONSIBLE FOR THE FIRE PROTECTION DESIGN FOR THE TWO CONTROL STANDS, THE ADMINISTRATION BUILDING AND THE NEW MAINTENANCE BUILDING.”
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 541620Environmental Consulting Services
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- 541990All Other Professional, Scientific, and Technical Services
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with TETRA TECH, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
