RADIABEAM SYSTEMS, LLC
Doing business as RADIABEAM SYSTEMS LLC
- SANTA MONICA, CA 90404-4021
- radiabeam.com (company website, opens in a new tab)
- Partnership or Limited Liability Partnership
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $1.6M
- Awards on record
- 1
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
RADIABEAM SYSTEMS, LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About RADIABEAM SYSTEMS, LLC
- Headquarters
- SANTA MONICA, CA 90404-4021
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIGRKLZTXQZXE6
- CAGE6SKM2
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $1.6M
- Awards on record
- 1
- Top funding agencies
- Department of Energy
Awards
89233122CNA000267
Completed: Period of performance ended Oct 31, 2025SBIR PHASE III - NOVEL LOW-COST MEDICAL ACCELERATOR DESIGNS FOR USE IN CHALLENGING ENVIRONMENTS
Department of Energy
- Obligated
- $1.6M
- Period of performance
- Jul 1, 2022 – Oct 31, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
89233122CNA000267 SBIR PHASE III - NOVEL LOW-COST MEDICAL ACCELERATOR DESIGNS FOR USE IN CHALLENGING ENVIRONMENTS | Department of Energy | 541715 · R425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $1.6M | Jul 1, 2022 – Oct 31, 2025 | Completed: Period of performance ended Oct 31, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 53 awards
- Total awarded
- $26,585,263
- By phase
- SBIR Phase I: 30
- SBIR Phase II: 19
- STTR Phase I: 3
- STTR Phase II: 1
- By agency
- Department of Energy: 53
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2025: 2
- 2024: 2
- 2023: 1
- 2022: 6
- 2021: 2
- 2020: 8
- 2019: 6
- 2018: 5
- 2017: 6
- 2016: 7
- 2015: 4
- 2014: 3
- 2013: 1
Awards (most recent first)
Multi-beam accelerator system for mobile food irradiation applications
SBIR Phase I · Department of Energy · 2025 · $199,980
Sep 26, 2025 – Jun 25, 2026
Solicitation DE-FOA-0003504 (2025) · Topic C60-27a
Precision manufacturing of Faraday screens for long pulse neutral beam injectors
SBIR Phase I · Department of Energy · 2025 · $199,849
Feb 18, 2025 – Nov 17, 2025
Solicitation DE-FOA-0003417 (2025) · Topic C59-17a
High-Power RF Window for Pulsed RF Accelerating Cavities
SBIR Phase II · Department of Energy · 2024 · $1,149,672
Apr 4, 2024 – Apr 3, 2026
Solicitation DE-FOA-0003184 (2024) · Topic C51-14a
Improved Multi-dimensional Bunch Shape Monitor
SBIR Phase II · Department of Energy · 2024 · $1,149,903
Apr 1, 2024 – Mar 31, 2026
Solicitation DE-FOA-0003184 (2024) · Topic C49-10a
Hand-Portable Accelerator for Radioisotope Replacement in Field Radiography
SBIR Phase II · Department of Energy · 2023 · $1,149,541
Aug 28, 2023 – Aug 27, 2025
Solicitation year 2023 · Topic C54-02a
Superconducting Quarter-Wave Resonator for Quantum Information Systems
SBIR Phase II · Department of Energy · 2022 · $1,149,559
Aug 22, 2022 – Aug 21, 2024
Solicitation year 2022 · Topic C46-29a
Compact, Modular Linac System for Electron Beam and X-ray Irradiation
SBIR Phase II · Department of Energy · 2022 · $1,149,729
Aug 22, 2022 – Aug 21, 2024
Solicitation year 2022 · Topic C52-02a
Cold Plasma Cathode for High Resolution Condensed Matter Electron Spectroscopy
SBIR Phase I · Department of Energy · 2022 · $199,680
Jun 27, 2022 – Mar 26, 2023
Solicitation year 2022 · Topic C54-27a
Integrated offset monitor for a sub-THz structure wakefield accelerator
SBIR Phase I · Department of Energy · 2022 · $199,596
Jun 27, 2022 – Mar 26, 2023
Solicitation year 2022 · Topic C54-29b
Hand-portable accelerator for radioisotope replacement in field radiography
SBIR Phase I · Department of Energy · 2022 · $199,539
Jun 27, 2022 – Mar 26, 2023
Solicitation year 2022 · Topic C54-02a
Microwave Thermionic Electron Gun for Synchrotron Light Sources
SBIR Phase II · Department of Energy · 2022 · $999,431
Apr 6, 2022 – Apr 5, 2024
Solicitation year 2021 · Topic C41-04b
Tunable Electronic Brachytherapy System
SBIR Phase I · Department of Energy · 2021 · $199,597
Jun 28, 2021 – Mar 27, 2022
Solicitation year 2021 · Topic 02c
Compact, Modular Linac System for Electron Beam and X-ray Irradiation
SBIR Phase I · Department of Energy · 2021 · $199,648
Jun 28, 2021 – Mar 27, 2022
Solicitation year 2021 · Topic 02a
High Gradient Accelerating Structure for Low Energy Protons
SBIR Phase II · Department of Energy · 2020 · $1,099,366
Aug 24, 2020 – Aug 23, 2022
Solicitation DE-FOA-0002156 (2020) · Topic 25a
Optimization of Additive Manufacturing Technique for 3D Superconducting Multi-Qubit Systems
SBIR Phase II · Department of Energy · 2020 · $1,099,588
Aug 24, 2020 – Aug 23, 2022
Solicitation DE-FOA-0002156 (2020) · Topic 32b
Safe, High-throughput, Self-contained Irradiator
SBIR Phase II · Department of Energy · 2020 · $1,099,518
Aug 24, 2020 – Aug 23, 2022
Solicitation DE-FOA-0002156 (2020) · Topic 04c
High volume Fabrication Technique for 3D Superconducting Multi-Qubit Systems
SBIR Phase I · Department of Energy · 2020 · $199,620
Jun 29, 2020 – Mar 28, 2021
Solicitation DEFOA0002146 (2020) · Topic 36b
Ultra-portable X-ray source for field radiography
SBIR Phase I · Department of Energy · 2020 · $199,842
Jun 29, 2020 – Mar 28, 2021
Solicitation DEFOA0002146 (2020) · Topic 02b
Ultrafast High Voltage Kicker System Hardware for Ion Clearing Gaps
SBIR Phase II · Department of Energy · 2020 · $999,371
Apr 6, 2020 – Apr 5, 2022
Solicitation DE-FOA-0002155 (2020) · Topic 30c
Development of Additive Manufacturing for Neutron Scattering Collimators
SBIR Phase II · Department of Energy · 2020 · $999,561
Apr 6, 2020 – Apr 5, 2022
Solicitation DE-FOA-0002155 (2020) · Topic 17a
High Efficiency Low-Beta Accelerating Section
SBIR Phase I · Department of Energy · 2020 · $199,626
Feb 18, 2020 – Nov 17, 2020
Solicitation DE-FOA-0002145 (2020) · Topic 33b
Optimization of Additive Manufacturing Technique for 3D Superconducting Multi-Qubit Systems
SBIR Phase I · Department of Energy · 2019 · $199,947
Jul 1, 2019 – Mar 31, 2020
Solicitation DE-FOA-0001941 (2019) · Topic 32b
Safe, high-throughput, self-contained irradiator
SBIR Phase I · Department of Energy · 2019 · $199,842
Jul 1, 2019 – Mar 31, 2020
Solicitation DE-FOA-0001941 (2019) · Topic 04c
Stand-Alone Cryomodule with Low-Loss Peripheral Components
SBIR Phase I · Department of Energy · 2019 · $149,806
Feb 19, 2019 – Nov 18, 2019
Solicitation DE-FOA-0001940 (2019) · Topic 30a
Ultrafast High Voltage Kicker System Hardware for Ion Clearing Gaps
SBIR Phase I · Department of Energy · 2019 · $149,787
Feb 19, 2019 – Nov 18, 2019
Solicitation DE-FOA-0001940 (2019) · Topic 30c
Showing the 25 most recent of 53 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 334419Other Electronic Component ManufacturingSmall business under this code’s size standard
- 334517Irradiation Apparatus ManufacturingSmall business under this code’s size standard
- 335999All Other Miscellaneous Electrical Equipment and Component ManufacturingSmall business under this code’s size standard
SAM.gov reports this entity as small under 3 of 4 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with RADIABEAM SYSTEMS, LLC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
