JACOBS ENGINEERING GROUP INC.
- DENVER, CO 80237-2738
- jacobs.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $20.3M
- Awards on record
- 72
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
JACOBS ENGINEERING GROUP INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About JACOBS ENGINEERING GROUP INC.
- Headquarters
- DENVER, CO 80237-2738
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIH4G1TWPHKQ67
- CAGE4N5H7
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $20.3M
- Awards on record
- 72
- Top funding agencies
- Federal Highway Administration
25 most recent of 72 awards
6982AF27F00003N
Recompete 18+ mo: Potential end Dec 31, 2032 (73 months away)CA FLAP SCR T5(1A) MONTEREY BAY SANCTUARY SCENIC TRAIL MITIGATION ANNUAL REPORTING OF POST DESIGN SERVICES
Department of Transportation · Federal Highway Administration
- Obligated
- $150K
- Period of performance
- Oct 28, 2026 – Dec 31, 2032
6982AF26F00074N
Recompete 18+ mo: Potential end Dec 31, 2028 (25 months away)UT FLAP 2496(2) EPHRAIM CANYON ROAD PRELIMINARY DESIGN/FINAL DESIGN TO
Department of Transportation · Federal Highway Administration
- Obligated
- $654.2K
- Period of performance
- Jul 29, 2026 – Dec 31, 2028
6982AF24F00047N
Recompete 18+ mo: Potential end Dec 31, 2028 (25 months away)CA FLAP SCR T5(3) COTONI-COAST DAIRIES NM SH1 OVERPASS A/E DESIGN TASK ORDER THE COTONI-COAST DAIRIES NATIONAL MONUMENT OVERPASS BRIDGE,…
Department of Transportation · Federal Highway Administration
- Obligated
- $328.7K
- Period of performance
- Apr 18, 2024 – Dec 31, 2028
6982AF23F00070N
Recompete 18+ mo: Potential end Jul 28, 2028 (20 months away)CA FLAP NWK 10(1) THORNTON AVENUE BIKE IMPROVEMENTS 15% DESIGN TASK ORDER INCLUDING ENVIRONMENTAL FIELD STUDIES AND MAPPING
Department of Transportation · Federal Highway Administration
- Obligated
- $1.3M
- Period of performance
- Apr 20, 2023 – Jul 28, 2028
6982AF26F00029N
Recompete 18+ mo: Potential end Jul 1, 2028 (19 months away)CA FLAP SCR T5(1A) MONTEREY BAY SANCTUARY SCENIC TRAIL: POST DESIGN SERVICES
Department of Transportation · Federal Highway Administration
- Obligated
- $20K
- Period of performance
- Mar 9, 2026 – Jul 1, 2028
6982AF23F00024N
Recompete 12–18 mo: Potential end Apr 30, 2028 (17 months away)CA FLAP MAR 223(1) PIERCE POINT ROAD ENVIRONMENTAL SUPPORT (FIELD WORK, PLANT SURVEYS, MEMOS)
Department of Transportation · Federal Highway Administration
- Obligated
- $940.3K
- Period of performance
- Jan 25, 2023 – Apr 30, 2028
6982AF26F00073N
Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)WY BUILD US212(10) BEARTOOTH HIGHWAY 0-15% ROAD DESIGN
Department of Transportation · Federal Highway Administration
- Obligated
- $1.1M
- Period of performance
- Jul 24, 2026 – Dec 31, 2027
6982AF26F00038N
Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)NM FLAP RIDGE(1)RIDGE ROAD DESIGN TASK ORDER FOR SCOPING A ROAD CONSTRUCTION PROJECT.
Department of Transportation · Federal Highway Administration
- Obligated
- $77.1K
- Period of performance
- Apr 6, 2026 – Dec 31, 2027
6982AF26F00103N
Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)CO FW RKM 10(1) WILDLIFE DR. & VC PARKING DESIGN TO 0% - 100%
Department of Transportation · Federal Highway Administration
- Obligated
- $154.3K
- Period of performance
- Jun 16, 2022 – Dec 31, 2027
6982AF26F00036N
Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)THIS TASK ORDER IS FOR POST DESIGN ARCHITECTURE & ENGINEERING SERVICES FOR THE CA FLAP SR36(13) STATE ROUTE 36 HUMBOLDT COUNTY PROJECT
Department of Transportation · Federal Highway Administration
- Obligated
- $80K
- Period of performance
- Apr 23, 2026 – Oct 31, 2027
6982AF23F00011N
Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)CA FLAP MRN CR107(1) MUIR WOODS ROAD THE PURPOSE OF THIS TASK ORDER IS TO OBLIGATE FUNDS FOR AE TASK ORDER FOR DESIGN SERVICES.
Department of Transportation · Federal Highway Administration
- Obligated
- $1.5M
- Period of performance
- Dec 20, 2022 – Oct 31, 2027
69056727F00003N
Recompete 6–12 mo: Potential end Oct 15, 2027 (11 months away)A/E DESIGN FOR WY NP YELL 12(4), NORTHEAST ENTRANCE ROAD, PHASE 1
Department of Transportation · Federal Highway Administration
- Obligated
- $4.4M
- Period of performance
- Oct 23, 2026 – Oct 15, 2027
6982AF24F00106N
Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)CA FLAP SCR T5(1) MONTEREY BAY SANCTUARY SCENIC TRAIL PRELIMINARY/FINAL MITIGATION DESIGN
Department of Transportation · Federal Highway Administration
- Obligated
- $430.5K
- Period of performance
- Sep 19, 2024 – Jun 30, 2027
6982AF26F00052N
Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AZ IHS NAVAJO(1) IHS HEALTH IMPROVEMENTS - FULL DESIGN OF AZ SITES (SITES 1-10)
Department of Transportation · Federal Highway Administration
- Obligated
- $1M
- Period of performance
- May 12, 2026 – May 31, 2027
6982AF26F00057N
Recompete < 6 mo: Potential end Apr 1, 2027 (4 months away)NV FLAP CCRTC ASH(1) ASH CANYON ROAD AND TRAILHEAD: ENVIRONMENTAL CLEARANCE & PERMITTING
Department of Transportation · Federal Highway Administration
- Obligated
- $73.2K
- Period of performance
- May 21, 2026 – Apr 1, 2027
6982AF26F00010N
Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)CA FW SDB 300(1) SAN DIEGO BAY NWR ENTRANCE ROAD: SCOPING THE PURPOSE OF THIS TASK ORDER IS TO PERFORM SCOPING SERVICES AND DEVELOP THE…
Department of Transportation · Federal Highway Administration
- Obligated
- $560.3K
- Period of performance
- Nov 21, 2025 – Mar 31, 2027
6982AF23F00132N
Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)6982AF22D000003/6982AF23F00132N CA FLAP SR89(4) FANNY BRIDGE DESIGN SUPPORT SERVICES DURING CONSTRUCTION FOR THE BRIDGE AND ROUNDABOUT…
Department of Transportation · Federal Highway Administration
- Obligated
- $225K
- Period of performance
- Sep 6, 2023 – Mar 31, 2027
6982AF26F00095N
Recompete < 6 mo: Potential end Feb 28, 2027 (3 months away)NM FLAP SR475(1) HYDE PARK ROAD IMPROVEMENTS SCOPING AND PDP EFFORT
Department of Transportation · Federal Highway Administration
- Obligated
- $115.6K
- Period of performance
- Sep 2, 2026 – Feb 28, 2027
6982AF26F00065N
Recompete < 6 mo: Potential end Feb 28, 2027 (3 months away)CA FLAP MNO 01N04(1) SADDLEBACK LAKE ROAD: ENVIRONMENTAL SERVICES
Department of Transportation · Federal Highway Administration
- Obligated
- $255.9K
- Period of performance
- Jul 13, 2026 – Feb 28, 2027
6982AF24F00078N
Recompete < 6 mo: Potential end Feb 26, 2027 (3 months away)AZ FLAP SR88(1) APACHE TRAIL COMPLETE ENV. MITIGATION (COFFEE TABLE BOOK)
Department of Transportation · Federal Highway Administration
- Obligated
- $242.6K
- Period of performance
- Aug 7, 2024 – Feb 26, 2027
6982AF26F00037N
Recompete < 6 mo: Potential end Jan 31, 2027 (2 months away)CA FLAP CR109(1) SIR FRANCIS DRAKE BOULEVARD TASK ORDER IS FOR POST-CONSTRUCTION MONITORING AS REQUIRED UNDER 404/401 PERMITS
Department of Transportation · Federal Highway Administration
- Obligated
- $170.4K
- Period of performance
- Apr 3, 2026 – Jan 31, 2027
6982AF25F00070N
Recompete < 6 mo: Potential end Jan 15, 2027 (2 months away)NM IHS NAVAJO (1) HEALTH FACILITY IMPROVEMENTS - PRELIMINARY DESIGN/FINAL DESIGN
Department of Transportation · Federal Highway Administration
- Obligated
- $1.4M
- Period of performance
- Aug 25, 2025 – Jan 15, 2027
6982AF26F00006N
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)CA ERFO FS LSPDR 2023-1(1B) BLACK MOUNTAIN ROAD POST DESIGN SERVICES DURING CONSTRUCTION.
Department of Transportation · Federal Highway Administration
- Obligated
- $10K
- Period of performance
- Nov 18, 2025 – Dec 31, 2026
6982AF25F00048N
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)THE PURPOSE OF THIS TASK ORDER IS FOR POST DESIGN SERVICES FOR CONSTRUCTION PROJECT CA ERFO NP YOSE 2023-2(1) JOHN MUIR TRAIL - ICE CUT.
Department of Transportation · Federal Highway Administration
- Obligated
- $25K
- Period of performance
- May 27, 2025 – Dec 31, 2026
6982AF25F00037N
Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)NM FTBL 2004(2) WILD RIVERS ROAD: POST DESIGN SERVICES THE PURPOSE OF THIS ACTION IS TO AWARD AN A&E TASK ORDER FOR POST DESIGN SERVICES.
Department of Transportation · Federal Highway Administration
- Obligated
- $35K
- Period of performance
- Apr 22, 2025 – Dec 31, 2026
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
6982AF27F00003N under 6982AF22D000003 CA FLAP SCR T5(1A) MONTEREY BAY SANCTUARY SCENIC TRAIL MITIGATION ANNUAL REPORTING OF POST DESIGN SERVICES | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $150K | Oct 28, 2026 – Dec 31, 2032 | Recompete 18+ mo: Potential end Dec 31, 2032 (73 months away) |
6982AF26F00074N under 6982AF22D000003 UT FLAP 2496(2) EPHRAIM CANYON ROAD PRELIMINARY DESIGN/FINAL DESIGN TO | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $654.2K | Jul 29, 2026 – Dec 31, 2028 | Recompete 18+ mo: Potential end Dec 31, 2028 (25 months away) |
6982AF24F00047N under 6982AF22D000003 CA FLAP SCR T5(3) COTONI-COAST DAIRIES NM SH1 OVERPASS A/E DESIGN TASK ORDER THE COTONI-COAST DAIRIES NATIONAL MONUMENT OVERPASS BRIDGE,… | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $328.7K | Apr 18, 2024 – Dec 31, 2028 | Recompete 18+ mo: Potential end Dec 31, 2028 (25 months away) |
6982AF23F00070N under 6982AF22D000003 CA FLAP NWK 10(1) THORNTON AVENUE BIKE IMPROVEMENTS 15% DESIGN TASK ORDER INCLUDING ENVIRONMENTAL FIELD STUDIES AND MAPPING | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.3M | Apr 20, 2023 – Jul 28, 2028 | Recompete 18+ mo: Potential end Jul 28, 2028 (20 months away) |
6982AF26F00029N under 6982AF22D000003 CA FLAP SCR T5(1A) MONTEREY BAY SANCTUARY SCENIC TRAIL: POST DESIGN SERVICES | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $20K | Mar 9, 2026 – Jul 1, 2028 | Recompete 18+ mo: Potential end Jul 1, 2028 (19 months away) |
6982AF23F00024N under 6982AF22D000003 CA FLAP MAR 223(1) PIERCE POINT ROAD ENVIRONMENTAL SUPPORT (FIELD WORK, PLANT SURVEYS, MEMOS) | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $940.3K | Jan 25, 2023 – Apr 30, 2028 | Recompete 12–18 mo: Potential end Apr 30, 2028 (17 months away)AI brief for award 6982AF23F00024NBid team for the recompete of award 6982AF23F00024N |
6982AF26F00073N under 6982AF22D000003 WY BUILD US212(10) BEARTOOTH HIGHWAY 0-15% ROAD DESIGN | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.1M | Jul 24, 2026 – Dec 31, 2027 | Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)AI brief for award 6982AF26F00073NBid team for the recompete of award 6982AF26F00073N |
6982AF26F00038N under 6982AF22D000003 NM FLAP RIDGE(1)RIDGE ROAD DESIGN TASK ORDER FOR SCOPING A ROAD CONSTRUCTION PROJECT. | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $77.1K | Apr 6, 2026 – Dec 31, 2027 | Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)AI brief for award 6982AF26F00038NBid team for the recompete of award 6982AF26F00038N |
6982AF26F00103N under 6982AF22D000003 CO FW RKM 10(1) WILDLIFE DR. & VC PARKING DESIGN TO 0% - 100% | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $154.3K | Jun 16, 2022 – Dec 31, 2027 | Recompete 12–18 mo: Potential end Dec 31, 2027 (13 months away)AI brief for award 6982AF26F00103NBid team for the recompete of award 6982AF26F00103N |
6982AF26F00036N under 6982AF22D000003 THIS TASK ORDER IS FOR POST DESIGN ARCHITECTURE & ENGINEERING SERVICES FOR THE CA FLAP SR36(13) STATE ROUTE 36 HUMBOLDT COUNTY PROJECT | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $80K | Apr 23, 2026 – Oct 31, 2027 | Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)AI brief for award 6982AF26F00036NBid team for the recompete of award 6982AF26F00036N |
6982AF23F00011N under 6982AF22D000003 CA FLAP MRN CR107(1) MUIR WOODS ROAD THE PURPOSE OF THIS TASK ORDER IS TO OBLIGATE FUNDS FOR AE TASK ORDER FOR DESIGN SERVICES. | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.5M | Dec 20, 2022 – Oct 31, 2027 | Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)AI brief for award 6982AF23F00011NBid team for the recompete of award 6982AF23F00011N |
69056727F00003N under 6982AF22D000003 A/E DESIGN FOR WY NP YELL 12(4), NORTHEAST ENTRANCE ROAD, PHASE 1 | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $4.4M | Oct 23, 2026 – Oct 15, 2027 | Recompete 6–12 mo: Potential end Oct 15, 2027 (11 months away)AI brief for award 69056727F00003NBid team for the recompete of award 69056727F00003N |
6982AF24F00106N under 6982AF22D000003 CA FLAP SCR T5(1) MONTEREY BAY SANCTUARY SCENIC TRAIL PRELIMINARY/FINAL MITIGATION DESIGN | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $430.5K | Sep 19, 2024 – Jun 30, 2027 | Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AI brief for award 6982AF24F00106NBid team for the recompete of award 6982AF24F00106N |
6982AF26F00052N under 6982AF22D000003 AZ IHS NAVAJO(1) IHS HEALTH IMPROVEMENTS - FULL DESIGN OF AZ SITES (SITES 1-10) | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1M | May 12, 2026 – May 31, 2027 | Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)AI brief for award 6982AF26F00052NBid team for the recompete of award 6982AF26F00052N |
6982AF26F00057N under 6982AF22D000003 NV FLAP CCRTC ASH(1) ASH CANYON ROAD AND TRAILHEAD: ENVIRONMENTAL CLEARANCE & PERMITTING | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $73.2K | May 21, 2026 – Apr 1, 2027 | Recompete < 6 mo: Potential end Apr 1, 2027 (4 months away)AI brief for award 6982AF26F00057NBid team for the recompete of award 6982AF26F00057N |
6982AF26F00010N under 6982AF22D000003 CA FW SDB 300(1) SAN DIEGO BAY NWR ENTRANCE ROAD: SCOPING THE PURPOSE OF THIS TASK ORDER IS TO PERFORM SCOPING SERVICES AND DEVELOP THE… | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $560.3K | Nov 21, 2025 – Mar 31, 2027 | Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)AI brief for award 6982AF26F00010NBid team for the recompete of award 6982AF26F00010N |
6982AF23F00132N under 6982AF22D000003 6982AF22D000003/6982AF23F00132N CA FLAP SR89(4) FANNY BRIDGE DESIGN SUPPORT SERVICES DURING CONSTRUCTION FOR THE BRIDGE AND ROUNDABOUT… | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $225K | Sep 6, 2023 – Mar 31, 2027 | Recompete < 6 mo: Potential end Mar 31, 2027 (4 months away)AI brief for award 6982AF23F00132NBid team for the recompete of award 6982AF23F00132N |
6982AF26F00095N under 6982AF22D000003 NM FLAP SR475(1) HYDE PARK ROAD IMPROVEMENTS SCOPING AND PDP EFFORT | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $115.6K | Sep 2, 2026 – Feb 28, 2027 | Recompete < 6 mo: Potential end Feb 28, 2027 (3 months away)AI brief for award 6982AF26F00095NBid team for the recompete of award 6982AF26F00095N |
6982AF26F00065N under 6982AF22D000003 CA FLAP MNO 01N04(1) SADDLEBACK LAKE ROAD: ENVIRONMENTAL SERVICES | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $255.9K | Jul 13, 2026 – Feb 28, 2027 | Recompete < 6 mo: Potential end Feb 28, 2027 (3 months away)AI brief for award 6982AF26F00065NBid team for the recompete of award 6982AF26F00065N |
6982AF24F00078N under 6982AF22D000003 AZ FLAP SR88(1) APACHE TRAIL COMPLETE ENV. MITIGATION (COFFEE TABLE BOOK) | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $242.6K | Aug 7, 2024 – Feb 26, 2027 | Recompete < 6 mo: Potential end Feb 26, 2027 (3 months away)AI brief for award 6982AF24F00078NBid team for the recompete of award 6982AF24F00078N |
6982AF26F00037N under 6982AF22D000003 CA FLAP CR109(1) SIR FRANCIS DRAKE BOULEVARD TASK ORDER IS FOR POST-CONSTRUCTION MONITORING AS REQUIRED UNDER 404/401 PERMITS | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $170.4K | Apr 3, 2026 – Jan 31, 2027 | Recompete < 6 mo: Potential end Jan 31, 2027 (2 months away)AI brief for award 6982AF26F00037NBid team for the recompete of award 6982AF26F00037N |
6982AF25F00070N under 6982AF22D000003 NM IHS NAVAJO (1) HEALTH FACILITY IMPROVEMENTS - PRELIMINARY DESIGN/FINAL DESIGN | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.4M | Aug 25, 2025 – Jan 15, 2027 | Recompete < 6 mo: Potential end Jan 15, 2027 (2 months away)AI brief for award 6982AF25F00070NBid team for the recompete of award 6982AF25F00070N |
6982AF26F00006N under 6982AF22D000003 CA ERFO FS LSPDR 2023-1(1B) BLACK MOUNTAIN ROAD POST DESIGN SERVICES DURING CONSTRUCTION. | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $10K | Nov 18, 2025 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6982AF26F00006NBid team for the recompete of award 6982AF26F00006N |
6982AF25F00048N under 6982AF22D000003 THE PURPOSE OF THIS TASK ORDER IS FOR POST DESIGN SERVICES FOR CONSTRUCTION PROJECT CA ERFO NP YOSE 2023-2(1) JOHN MUIR TRAIL - ICE CUT. | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $25K | May 27, 2025 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6982AF25F00048NBid team for the recompete of award 6982AF25F00048N |
6982AF25F00037N under 6982AF22D000003 NM FTBL 2004(2) WILD RIVERS ROAD: POST DESIGN SERVICES THE PURPOSE OF THIS ACTION IS TO AWARD AN A&E TASK ORDER FOR POST DESIGN SERVICES. | Department of Transportation · Federal Highway Administration | 541330 · C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $35K | Apr 22, 2025 – Dec 31, 2026 | Recompete < 6 mo: Potential end Dec 31, 2026 (1 month away)AI brief for award 6982AF25F00037NBid team for the recompete of award 6982AF25F00037N |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
No reported sub-awards as a subcontractor.
Subcontractors it has used
- YEH AND ASSOCIATES, INC
UEI VX6JJMAC6UT1
$431.7K
Subcontracted by this company · 3 sub-awards · latest Sep 24, 2026
- Federal Highway Administration
- “ENGINEERING SERVICES”
- SHANNON & WILSON INC
UEI R5JQK3BYDJ14
$0
Subcontracted by this company · 1 sub-award · latest Aug 10, 2026
- Federal Highway Administration
- “ENGINEERING SERVICES”
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 541310Architectural Services
- 541611Administrative Management and General Management Consulting Services
- 541618Other Management Consulting Services
- 541620Environmental Consulting Services
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with JACOBS ENGINEERING GROUP INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
