APPLIED MATERIAL SYSTEMS ENGINEERING, INC
- STREAMWOOD, IL 60107-1815
- amseng.net (company website, opens in a new tab)
- Other
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $4.1M
- Awards on record
- 3
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
APPLIED MATERIAL SYSTEMS ENGINEERING, INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About APPLIED MATERIAL SYSTEMS ENGINEERING, INC
- Headquarters
- STREAMWOOD, IL 60107-1815
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIHEW9FKHKU6F8
- CAGE3AVB3
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $4.1M
- Awards on record
- 3
- Top funding agencies
- National Aeronautics and Space Administration
Awards
80NSSC26C0097
Recompete 18+ mo: Potential end Sep 29, 2028 (22 months away)SBIR PHASE II - INNOVATIVE ADVANCES IN COATINGS FOR EXTREME ENVIRONMENTAL THERMAL RADIATORS AND COMPLEX SURFACES
National Aeronautics and Space Administration
- Obligated
- $1.3M
- Period of performance
- Sep 30, 2026 – Sep 29, 2028
80NSSC25C0141
Completed: Period of performance ended Mar 27, 2026SBIR I INNOVATIVE ADVANCES IN COATINGS FOR EXTREME ENVIRONMENTAL THERMAL RADIATORS AND COMPLEX SURFACES
National Aeronautics and Space Administration
- Obligated
- $150K
- Period of performance
- Sep 29, 2025 – Mar 27, 2026
80NSSC23CA210
Completed: Period of performance ended Sep 27, 2025FY23 PHASE II SEQUENTIAL - INTEGRATION OF DUST RESISTING SECONDARY EMISSION ENGINEERED PASSIVE THERMAL CONTROL MATERIAL SYSTEMS (TCMS)…
National Aeronautics and Space Administration
- Obligated
- $2.6M
- Period of performance
- Sep 28, 2023 – Sep 27, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
80NSSC26C0097 SBIR PHASE II - INNOVATIVE ADVANCES IN COATINGS FOR EXTREME ENVIRONMENTAL THERMAL RADIATORS AND COMPLEX SURFACES | National Aeronautics and Space Administration | 541713 · AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | $1.3M | Sep 30, 2026 – Sep 29, 2028 | Recompete 18+ mo: Potential end Sep 29, 2028 (22 months away) |
80NSSC25C0141 SBIR I INNOVATIVE ADVANCES IN COATINGS FOR EXTREME ENVIRONMENTAL THERMAL RADIATORS AND COMPLEX SURFACES | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $150K | Sep 29, 2025 – Mar 27, 2026 | Completed: Period of performance ended Mar 27, 2026 |
80NSSC23CA210 FY23 PHASE II SEQUENTIAL - INTEGRATION OF DUST RESISTING SECONDARY EMISSION ENGINEERED PASSIVE THERMAL CONTROL MATERIAL SYSTEMS (TCMS)… | National Aeronautics and Space Administration | 541715 · AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | $2.6M | Sep 28, 2023 – Sep 27, 2025 | Completed: Period of performance ended Sep 27, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 25 awards
- Total awarded
- $9,755,395
- By phase
- SBIR Phase I: 14
- SBIR Phase II: 7
- STTR Phase I: 3
- STTR Phase II: 1
- By agency
- National Aeronautics and Space Administration: 20
- Department of Defense: 4
- Department of Energy: 1
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2025: 1
- 2024: 1
- 2023: 1
- 2022: 1
- 2021: 1
- 2020: 1
- 2019: 1
- 2017: 1
- 2016: 3
- 2015: 1
- 2014: 1
- 2012: 1
- 2011: 3
- 2010: 1
- 2009: 1
- 2007: 1
- 2006: 2
- 2005: 2
- 2004: 1
Awards (most recent first)
Innovative Advances in Coatings for Extreme Environmental Thermal Radiators and Complex Surfaces
SBIR Phase I · National Aeronautics and Space Administration · 2025 · $150,000
Sep 2, 2025 – Mar 27, 2026
Solicitation SBIR 2025-I (2025) · Topic S16
Advanced Affordable Technologies For Nuclear Applications
SBIR Phase I · Department of Energy · 2024 · $200,000
Jul 22, 2024 – Apr 21, 2025
Solicitation DE-FOA-0003202 (2024) · Topic C58-29bb
Integration of Dust Resisting Secondary Emission Engineered Passive Thermal Control Material Systems (TCMS) Coating on - Flight & Test Hardware and Its Performance Validation Testing Per NASA-STD-1008
SBIR Phase II · National Aeronautics and Space Administration · 2023 · $2,629,361
Sep 28, 2023 – Sep 27, 2025
Solicitation SEQ_23_P2S_C1 (2023) · Topic S3
Novel Coating Concepts for Lunar Regolith Dust Mitigation for Thermal Radiators and Extreme Environments
SBIR Phase I · National Aeronautics and Space Administration · 2022 · $150,000
Jul 22, 2022 – Jan 25, 2023
Solicitation SBIR_22_P1 (2022) · Topic S16
Advanced Survivable Thermal Control Material Systems for Aggressive Planetary Dusty Environments
SBIR Phase II · National Aeronautics and Space Administration · 2021 · $750,000
Jul 27, 2021 – Jul 26, 2023
Solicitation SBIR_20_P2 (2020) · Topic S3
Advanced Survivable Thermal Control Material Systems for Aggressive Planetary Dusty Environments
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $125,000
Aug 6, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic S3
Advanced Plasma Sprayed Conductive Thermal Control Material Systems (TCMS) - For Improved Performance
SBIR Phase I · National Aeronautics and Space Administration · 2019 · $124,999
Aug 19, 2019 – Feb 18, 2020
Solicitation SBIR_19_P1 (2019) · Topic S3
Encrypted Self-Targeting Energy Beams for Power Transmission Designed for Satellite and Space Habitat Applications
STTR Phase I · National Aeronautics and Space Administration · 2017 · $125,000
Jun 9, 2017 – Jun 8, 2018
Solicitation year 2017 · Topic T3.01 · Research partner: The Board of Trustees of the University of Illinois
Next Generation Thermal Management Materials: Boron Arsenide for Isotropic Diamond Like Thermal Conductivity - Affordable BAs Processing Innovations
SBIR Phase I · National Aeronautics and Space Administration · 2016 · $125,000
Jun 10, 2016 – Dec 9, 2016
Solicitation year 2016 · Topic S3.07
Innovative High Energy Density Storage in Nano Vacuum Tubes (NVTs) Designed for Small Leakage Curren
STTR Phase I · National Aeronautics and Space Administration · 2016 · $125,000
Jun 10, 2016 – Jun 9, 2017
Solicitation year 2016 · Topic T3.02 · Research partner: The Board of Trustees of the University of Illinois
Innovations for the Affordable Conductive Thermal Control Material Systems for Space Applications
SBIR Phase II · National Aeronautics and Space Administration · 2016 · $750,000
May 19, 2016 – May 18, 2018
Solicitation year 2015 · Topic S3.07
Innovations for the Affordable Conductive Thermal Control Material Systems for Space Applications
SBIR Phase I · National Aeronautics and Space Administration · 2015 · $125,000
Jun 17, 2015 – Dec 17, 2015
Solicitation year 2015 · Topic S3.07
Advanced Thermal Interface Material Systems for Space Applications
SBIR Phase I · National Aeronautics and Space Administration · 2014 · $125,000
Jun 20, 2014 – Dec 19, 2014
Solicitation year 2014 · Topic S3.07 · Research partner: Stub
The Conductive Thermal Control Material Systems for Space Applications
SBIR Phase II · National Aeronautics and Space Administration · 2012 · $750,000
May 1, 2012 – Oct 31, 2014
Solicitation year 2010 · Topic S3.02 · Research partner: Stub
Adaptive Thermal Control Material Systems and Coatings for Radiation Hardening of Spacecraft
SBIR Phase II · Department of Defense (Air Force) · 2011 · $750,000
Started Sep 21, 2011
Solicitation 2009.3 (2009) · Topic AF093-071 · Research partner: Stub
Evaluation of Synthesis&Processing Routes for the High K- Boron Nitride Nano Tubes (BNNTS) for Thermal Management Applications
SBIR Phase I · National Aeronautics and Space Administration · 2011 · $100,000
Feb 18, 2011 – Sep 29, 2011
Solicitation year 2010 · Topic S3.05 · Research partner: Stub
The Conductive Thermal Control Material Systems for Space Applications
SBIR Phase I · National Aeronautics and Space Administration · 2011 · $100,000
Feb 18, 2011 – Sep 29, 2011
Solicitation year 2010 · Topic S3.02 · Research partner: Stub
Adaptive Thermal Control Coating for Radiation Hardening of Spacecraft
SBIR Phase I · Department of Defense (Air Force) · 2010 · $100,000
Mar 16, 2010 – Mar 16, 2011
Solicitation 2009.3 (2009) · Topic AF093-071
Advanced Durable Flexible Ultra Low Outgassing Thermal Control Coatings for NASA Science Missions
SBIR Phase I · National Aeronautics and Space Administration · 2009 · $100,000
Jan 22, 2009 – Jul 22, 2009
Solicitation year 2008 · Topic S3.02
Robust Engineered Thermal Control Material Systems for Crew Exploration Vehicle (CEV) and Prometheus Needs
SBIR Phase II · National Aeronautics and Space Administration · 2007 · $600,000
Dec 7, 2006 – Dec 7, 2008
Solicitation year 2005 · Topic X10.04
Multifunctional Protective Coatings for Spacecraft Surfaces
STTR Phase II · Department of Defense (Missile Defense Agency) · 2006 · $912,000
Sep 13, 2006 – Sep 13, 2008
Solicitation year 2005 · Topic MDA05-T019 · Research partner: UNIV. OF ILLINOIS-CHICAHGO(UIC
Robust Engineered Thermal Control Material Systems for Crew Exploration Vehicle (CEV) and Prometheus Needs
SBIR Phase I · National Aeronautics and Space Administration · 2006 · $69,997
Jan 26, 2006 – Jul 24, 2006
Solicitation year 2005 · Topic X10.04
Multifunctional Protective Coatings for Spacecraft Surfaces
STTR Phase I · Department of Defense (Missile Defense Agency) · 2005 · $100,000
Aug 18, 2005 – Feb 18, 2006
Solicitation year 2005 · Topic MDA05-T019 · Research partner: UNIV. OF ILLINOIS-CHICAGO(UIC)
Next Generation Advanced Binder Chemistries for High Performance, Environmentally DurableThermal Control Material Systems
SBIR Phase II · National Aeronautics and Space Administration · 2005 · $599,998
Nov 30, 2004 – Nov 30, 2006
Solicitation year 2003 · Topic S4.04
Next Generation Advanced Binder Chemistries for High Performance, Environmentally DurableThermal Control Material Systems
SBIR Phase I · National Aeronautics and Space Administration · 2004 · $69,040
Jan 16, 2004 – Jul 19, 2004
Solicitation year 2003 · Topic S4.04
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 325510Title not in the curated listSmall business under this code’s size standard
- 325520Title not in the curated listSmall business under this code’s size standard
- 326112Title not in the curated listSmall business under this code’s size standard
- 541611Administrative Management and General Management Consulting ServicesSmall business under this code’s size standard
- 541713Research and Development in NanotechnologySmall business under this code’s size standard
- 541714Research and Development in Biotechnology (except Nanobiotechnology)Small business under this code’s size standard
- 611430Professional and Management Development TrainingSmall business under this code’s size standard
SAM.gov reports this entity as small under 7 of 8 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with APPLIED MATERIAL SYSTEMS ENGINEERING, INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
