
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
FITZGERALD'S GENERAL CONTRACTING has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Awards
1240BH23F0101
Recompete 18+ mo: Potential end Sep 21, 2028 (22 months away)ROAD CONSTRUCTION IDIQ MINIMUM GAURANTEE
Department of Agriculture · Forest Service
1240BH26F0056
Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)ASPHALT REPAIRS ON FOREST ROADS 8303, 23, 76, AND 90. TASK ORDER UNDER GIFFORD PINCHOT AND OLYMPIC NATIONAL FORESTS ROAD CONSTRUCTION IDIQS.
Department of Agriculture · Forest Service
1240BH26F0033
Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)2026 GPNF RECREATION SITE CLOSURE DEVICES
Department of Agriculture · Forest Service
1240BD26F0031
Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)RETREAT FIRE DR ROADS - THE REQUESTED WORK IS NECESSARY FOR DISASTER RELIEF RELATED MAINTENANCE ON NATIONAL FOREST SYSTEM ROADS WITHIN THE…
Department of Agriculture · Forest Service
1240BH26F0051
Recompete 6–12 mo: Potential end Jul 1, 2027 (7 months away)ROAD 2110 REALIGNMENT TASK ORDER UNDER GP/OLY ROAD CONSTRUCTION IDIQ
Department of Agriculture · Forest Service
1240BK26F0044
Recompete < 6 mo: Potential end Mar 5, 2027 (3 months away)TO REMOVE HAZARD TREES FROM FOREST ROADS 1800, 1800230, 6600, 6800, 8600, WHICH AN OPTIONAL ITEM FOR FOREST ROAD 1840.
Department of Agriculture · Forest Service
1240BH25F0056
Completed: Period of performance ended Oct 30, 2026WILLIAMS MINE SUPPRESSION REPAIR TO ROADS CULVERTS, AND BRIDGE.
Department of Agriculture · Forest Service
12363N26F4072
Completed: Period of performance ended Sep 30, 2026FSR 2355 CULVERT REPLACEMENT SUPPRESSION REPAIR TO - REPAIR CULVERT DAMAGED DURING BEAR GULCH FIRE SUPPRESSION ACTIVITIES
Department of Agriculture · Forest Service
1240BD24F0077
Completed: Period of performance ended Nov 14, 2024ROAD MAINTENANCE, SNAGGY-QUARTZ GIFFORD PINCHOT NATIONAL FOREST MOUNT ST. HELENS NATIONAL VOLCANIC MONUMENT AND DISTRICT
Department of Agriculture · Forest Service
12363N23F4196
Completed: Period of performance ended Oct 31, 2024SIGN INSTALLATIONS
Department of Agriculture · Forest Service
1240BH23F0067
Completed: Period of performance ended Jul 31, 2024MT ADAMS VEHICLE BRIDGE RAIL REPLACEMENT
Department of Agriculture · Forest Service
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
1240BH23F0101 under 1240BH23D0028 ROAD CONSTRUCTION IDIQ MINIMUM GAURANTEE | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $0 | Sep 21, 2023 – Sep 21, 2028 | Recompete 18+ mo: Potential end Sep 21, 2028 (22 months away) |
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
No SBIR/STTR awards on record
Source: SBIR.gov award records · sync date not recorded
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov reports this entity as small under 9 of 11 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
Self-represented in SAM.gov. WOSB and EDWOSB set-asides need SBA certification (13 CFR 127.300); SDVOSB and VOSB need SBA VetCert (13 CFR part 128). Confirm current certification before relying on it.
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
1240BH26F0056 under 1240BH23D0028 ASPHALT REPAIRS ON FOREST ROADS 8303, 23, 76, AND 90. TASK ORDER UNDER GIFFORD PINCHOT AND OLYMPIC NATIONAL FORESTS ROAD CONSTRUCTION IDIQS. |
| Department of Agriculture · Forest Service |
| 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| $257.6K |
| Sep 21, 2026 – Oct 31, 2027 |
Recompete 6–12 mo: Potential end Oct 31, 2027 (11 months away)AI brief for award 1240BH26F0056Bid team for the recompete of award 1240BH26F0056 |
1240BH26F0033 under 1240BH23D0028 2026 GPNF RECREATION SITE CLOSURE DEVICES | Department of Agriculture · Forest Service | 237310 · Y1PACONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING) | $133.8K | Aug 5, 2026 – Sep 30, 2027 | Recompete 6–12 mo: Potential end Sep 30, 2027 (10 months away)AI brief for award 1240BH26F0033Bid team for the recompete of award 1240BH26F0033 |
1240BD26F0031 under 1240BD23A0019 RETREAT FIRE DR ROADS - THE REQUESTED WORK IS NECESSARY FOR DISASTER RELIEF RELATED MAINTENANCE ON NATIONAL FOREST SYSTEM ROADS WITHIN THE… | Department of Agriculture · Forest Service | 115310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $97.3K | Jun 15, 2026 – Jul 31, 2027 | Recompete 6–12 mo: Potential end Jul 31, 2027 (8 months away)AI brief for award 1240BD26F0031Bid team for the recompete of award 1240BD26F0031 |
1240BH26F0051 under 1240BH23D0028 ROAD 2110 REALIGNMENT TASK ORDER UNDER GP/OLY ROAD CONSTRUCTION IDIQ | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $49.6K | Sep 14, 2026 – Jul 1, 2027 | Recompete 6–12 mo: Potential end Jul 1, 2027 (7 months away)AI brief for award 1240BH26F0051Bid team for the recompete of award 1240BH26F0051 |
1240BK26F0044 under 1240BD23A0019 TO REMOVE HAZARD TREES FROM FOREST ROADS 1800, 1800230, 6600, 6800, 8600, WHICH AN OPTIONAL ITEM FOR FOREST ROAD 1840. | Department of Agriculture · Forest Service | 115310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $144.3K | Sep 30, 2026 – Mar 5, 2027 | Recompete < 6 mo: Potential end Mar 5, 2027 (3 months away)AI brief for award 1240BK26F0044Bid team for the recompete of award 1240BK26F0044 |
1240BH25F0056 under 1240BH23D0028 WILLIAMS MINE SUPPRESSION REPAIR TO ROADS CULVERTS, AND BRIDGE. | Department of Agriculture · Forest Service | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $104.8K | Oct 1, 2025 – Oct 30, 2026 | Completed: Period of performance ended Oct 30, 2026 |
12363N26F4072 under 1240BD23A0019 FSR 2355 CULVERT REPLACEMENT SUPPRESSION REPAIR TO - REPAIR CULVERT DAMAGED DURING BEAR GULCH FIRE SUPPRESSION ACTIVITIES | Department of Agriculture · Forest Service | 115310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $24.8K | Jul 15, 2026 – Sep 30, 2026 | Completed: Period of performance ended Sep 30, 2026 |
1240BD24F0077 under 1240BD23A0019 ROAD MAINTENANCE, SNAGGY-QUARTZ GIFFORD PINCHOT NATIONAL FOREST MOUNT ST. HELENS NATIONAL VOLCANIC MONUMENT AND DISTRICT | Department of Agriculture · Forest Service | 115310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $75.3K | Sep 1, 2024 – Nov 14, 2024 | Completed: Period of performance ended Nov 14, 2024 |
12363N23F4196 under 1205K318D0006 SIGN INSTALLATIONS | Department of Agriculture · Forest Service | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $247.8K | Jul 12, 2023 – Oct 31, 2024 | Completed: Period of performance ended Oct 31, 2024 |
1240BH23F0067 under 1204T020A0042 MT ADAMS VEHICLE BRIDGE RAIL REPLACEMENT | Department of Agriculture · Forest Service | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $108.9K | Jul 11, 2023 – Jul 31, 2024 | Completed: Period of performance ended Jul 31, 2024 |
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026