Skip to main content
TeamingIndex
Unclaimed profileSeeded from SAM.gov and USAspending public records

ADVANCED ROTORCRAFT TECHNOLOGY, INC.

Doing business as ADVANCED TECHNOLOGY INC

UEIHL4HNWJKEP33CAGE9Y605NAICS541330
  • SAM active
  • No verified credentials yet
  • CMMCNot on file
  • SPRSNone
  • FCLVisible to paid members

Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works

36-mo obligations
$1.2M
Awards on record
10
Contract vehicles
0
Verified credentials
0

Compliance posture: unverified (SAM.gov baseline only)

ADVANCED ROTORCRAFT TECHNOLOGY, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0

Claim this profile

About ADVANCED ROTORCRAFT TECHNOLOGY, INC.

ADVANCED ROTORCRAFT TECHNOLOGY, INC. (DBA ADVANCED TECHNOLOGY INC) is a SAM.gov-registered entity based in FREMONT, CA 94538-6539. UEI HL4HNWJKEP33; CAGE 9Y605; primary NAICS 541330. Compliance posture not provided. Active SAM registration.
Headquarters
FREMONT, CA 94538-6539

Identifiers

UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.

  • UEIHL4HNWJKEP33
  • CAGE9Y605

Capabilities & differentiators

No capability narrative yet

The company has not published a capability narrative. Its SAM.gov registration, NAICS codes and award history are below.

Compliance posture

Every credential shows who vouches for it: verified by TeamingIndex, or self-attested by the contractor.

No compliance posture published yet

Compliance facts appear once the company claims this profile and publishes them.

Facility clearance

Facility clearance: visible to paid members

Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans

Prime awards from USAspending.gov (FPDS), synced nightly. Recompete windows use the potential end date (base plus all options).
36-month obligations
$1.2M
Awards on record
10
Top funding agencies
National Aeronautics and Space Administration · Federal Aviation Administration · Department of the Navy

Awards

  • 9531BM24P0058

    Recompete 6–12 mo: Potential end Sep 14, 2027 (10 months away)

    ROTORCRAFT ENGINEERING SIMULATION SOFTWARE MAINTENANCE AGREEMENTS

    National Transportation Safety Board

    Obligated
    $75.6K
    Period of performance
    Sep 15, 2024 – Sep 14, 2027
  • 692M1526P00036

    Recompete 6–12 mo: Potential end May 31, 2027 (6 months away)

    ADVANCED ROTORCRAFT TECHNOLOGY

    Department of Transportation · Federal Aviation Administration

    Obligated
    $22.5K
    Period of performance
    May 4, 2026 – May 31, 2027
  • N0016725P1114

    Completed: Period of performance ended Aug 14, 2026

    FLIGHTLAB SOFTWARE MAINTENANCE

    Department of Defense · Department of the Navy

    Obligated
    $13.1K
    Period of performance
    Aug 15, 2025 – Aug 14, 2026
  • N0016726P1020

    Completed: Period of performance ended Aug 1, 2026

    PROVIDE EXPERT MODELING, SIMULATION AND ANALYSIS SERVICES OF A PROPELLER-DRIVEN ROTOR (PDR) SYSTEM USING FLIGHTLAB SOFTWARE TO SUPPORT THE…

    Department of Defense · Department of the Navy

    Obligated
    $106K
    Period of performance
    Jan 8, 2026 – Aug 1, 2026
  • W913E525P0005

    Completed: Period of performance ended Apr 30, 2026

    VVPM SOFTWARE MAINTENANCE AGREEMENT U437P00

    Department of Defense · Department of the Army

    Obligated
    $17.4K
    Period of performance
    Feb 20, 2025 – Apr 30, 2026
  • 80NSSC25C0117

    Completed: Period of performance ended Mar 27, 2026

    SBIR 1 ADVANCED ROTORCRAFT TECHNOLOGY

    National Aeronautics and Space Administration

    Obligated
    $149.9K
    Period of performance
    Sep 29, 2025 – Mar 27, 2026
  • 692M1525P00070

    Completed: Period of performance ended Jan 31, 2026

    ANNUAL SOFTWARE MAINTENANCE RENEWAL FOR ADVANCED ROTORCRAFT TECHNOLOGY INC (ART) FLIGHTLAB DEVELOPMENT SYSTEM AND VISCOUS VORTEX PARTICLE…

    Department of Transportation · Federal Aviation Administration

    Obligated
    $22.5K
    Period of performance
    Sep 3, 2025 – Jan 31, 2026
  • 692M1524P00012

    Completed: Period of performance ended Jan 4, 2025

    PROCUREMENT OF ART FLIGHT LAB DEVELOPMENT SYSTEM, VVPM ADD-ON & TRAINING IN SUPPORT OF COCKPIT SIMULATION FACILITY VERTICAL FLIGHT…

    Department of Transportation · Federal Aviation Administration

    Obligated
    $149.5K
    Period of performance
    Jan 4, 2024 – Jan 4, 2025
  • 80NSSC21C0610

    Completed: Period of performance ended Nov 30, 2024

    IMPROVED FIDELITY SIMULATION MODELS FOR VTOL CONCEPT VEHICLES

    National Aeronautics and Space Administration

    Obligated
    $612.4K
    Period of performance
    Aug 23, 2021 – Nov 30, 2024
  • N0016724P0259

    Completed: Period of performance ended Sep 30, 2024

    FLIGHTLAB MAINTENANCE SOFTWARE 1ST SYSTE

    Department of Defense · Department of the Navy

    Obligated
    $11.3K
    Period of performance
    Sep 16, 2024 – Sep 30, 2024

No contract vehicles on file

This company has not listed GWAC, IDIQ, GSA Schedule or OTA consortium holdings.
Who ADVANCED ROTORCRAFT TECHNOLOGY, INC. has actually worked with, from sub-awards that prime contractors report to the government. Use it to see which primes already trust this company.

Primes it has worked under

Subcontractors it has used

No reported sub-awards as a prime contractor.

Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.

Small Business Innovation Research and Technology Transfer awards: early-stage federal R&D money this company has won.

SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects

Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.

Awards on record
82 awards
Total awarded
$29,475,036
By phase
  • SBIR Phase I: 45
  • SBIR Phase II: 29
  • STTR Phase I: 4
  • STTR Phase II: 4
By agency
  • Department of Defense: 76
  • National Aeronautics and Space Administration: 3
  • Department of Energy: 2
  • National Science Foundation: 1
Active projects
0 projects
Projects whose contract end date is today or later.
Phase II ending within 12 months
0 projects
Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
By year
  • 2025: 1
  • 2023: 1
  • 2021: 3
  • 2020: 3
  • 2019: 3
  • 2017: 2
  • 2016: 4
  • 2015: 4
  • 2013: 1
  • 2012: 2
  • 2011: 4
  • 2010: 3
  • 2009: 5
  • 2008: 4
  • 2007: 5
  • 2006: 1
  • 2005: 4
  • 2004: 1
  • 2003: 3
  • 2002: 4
  • 2001: 1
  • 2000: 3
  • 1998: 3
  • 1996: 4
  • 1995: 1
  • 1994: 4
  • 1993: 1
  • 1992: 3
  • 1991: 1
  • 1990: 1
  • 1988: 1
  • 1986: 1

Awards (most recent first)

  • Automated Airfoil Table Generation for VTOL Aircraft

    SBIR Phase I · National Aeronautics and Space Administration · 2025 · $149,920

    Sep 4, 2025 – Mar 27, 2026

    Solicitation SBIR 2025-I (2025) · Topic A1

  • Applying the FLiCert Design and Certification Support Tool to OEM eVTOL Applications

    STTR Phase II · Department of Defense (Air Force) · 2023 · $749,950

    Sep 13, 2023 – Dec 13, 2024

    Solicitation X20.D (2020) · Topic AFX20D-TCSO1 · Research partner: University of Maryland

  • CFD-Augmented Comprehensive eVTOL Analysis and Certification Tool

    STTR Phase II · Department of Defense (Air Force) · 2021 · $749,985

    Aug 3, 2021 – Nov 6, 2022

    Solicitation X20.D (2020) · Topic AFX20D-TCSO1 · Research partner: University of Maryland, College Park

  • CFD-Augmented Comprehensive eVTOL Analysis and Certification Tool

    STTR Phase I · Department of Defense (Air Force) · 2021 · $149,997

    Nov 18, 2020 – May 15, 2021

    Solicitation X20.D (2020) · Topic AFX20D-TCSO1 · Research partner: University of Maryland

  • Advanced Comprehensive Analysis Tool for Emerging Vertical Lift Configurations

    SBIR Phase II · Department of Defense (Army) · 2021 · $549,994

    Oct 30, 2020 – Sep 22, 2022

    Solicitation 19.1 (2019) · Topic A19-001

  • Modeling and Control Methods for Future Vertical Lift Rotorcraft Fatigue Reduction

    SBIR Phase II · Department of Defense (Army) · 2020 · $1,083,646

    Jul 9, 2020 – Jan 24, 2023

    Solicitation 19.1 (2019) · Topic A19-020

  • Physics-Based Unified UAV Design and Analysis Tool

    SBIR Phase II · Department of Defense (Army) · 2020 · $545,871

    Jul 9, 2020 – Mar 14, 2022

    Solicitation 19.1 (2019) · Topic A19-019

  • Mixed-Precision Efficiency Improvements for Multi-Physics Flow Simulations

    SBIR Phase I · Department of Energy · 2020 · $200,000

    Feb 18, 2020 – Nov 17, 2020

    Solicitation DE-FOA-0002145 (2020) · Topic 07a

  • Advanced Comprehensive Analysis Tool for Emerging Vertical Lift Configurations

    SBIR Phase I · Department of Defense (Army) · 2019 · $107,932

    May 30, 2019 – Jul 15, 2020

    Solicitation 19.1 (2019) · Topic A19-001

  • Modeling and Control Methods for Future Vertical Lift Rotorcraft Fatigue Reduction

    SBIR Phase I · Department of Defense (Army) · 2019 · $162,494

    May 23, 2019 – Dec 16, 2020

    Solicitation 19.1 (2019) · Topic A19-020

  • Unified UAS Design Tool Toward Optimum Performance and Low Noise

    SBIR Phase I · Department of Defense (Army) · 2019 · $107,991

    May 23, 2019 – Feb 25, 2020

    Solicitation 19.1 (2019) · Topic A19-019

  • Advanced Aerodynamic Interference Solver with Coupled Viscous Vortex Particle Module/CFD/CSD in Support of Rotorcraft Design

    SBIR Phase II · Department of Defense (Army) · 2017 · $999,984

    Oct 19, 2017 – Oct 18, 2018

    Solicitation 2015.1 (2015) · Topic A15-027

  • Rotorcraft Elastic Fuselage Coupling with CFD

    SBIR Phase II · Department of Defense (Army) · 2017 · $999,997

    Apr 14, 2017 – Apr 14, 2019

    Solicitation 2015.0 (2015) · Topic A15-103

  • Combined Helios/RCAS GUI and Enhancements

    SBIR Phase II · Department of Defense (Army) · 2016 · $999,844

    Sep 26, 2016 – Sep 25, 2017

    Solicitation 2008.2 (2016) · Topic A08-017

  • Finite State Induced Inflow Model Extracted from Viscous Vortex Particle Method for Advanced Rotorcraft Configurations

    SBIR Phase II · Department of Defense (Army) · 2016 · $1,548,897

    Sep 21, 2016 – Feb 28, 2020

    Solicitation 15.2 (2015) · Topic A15-090

  • High Fidelity Rotorcraft Towing Modeling and Simulation with Towed Magnetic Anomaly Detection System

    STTR Phase II · Department of Defense (Navy) · 2016 · $999,954

    Jul 5, 2016 – Nov 20, 2018

    Solicitation 2015.0 (2015) · Topic N15A-T009 · Research partner: Georgia Institute of Technology

  • RCAS Elastic Fuselage Coupling with CFD

    SBIR Phase I · Department of Defense (Army) · 2016 · $149,998

    Apr 8, 2016 – May 26, 2017

    Solicitation 2015.3 (2016) · Topic A15-103

  • Finite State Inflow Model Augmented with Viscous Vortex Particle Method for Advanced Rotorcraft Configurations

    SBIR Phase I · Department of Defense (Army) · 2015 · $99,811

    Nov 20, 2015 – May 19, 2016

    Solicitation 2015.2 (2015) · Topic A152-090

  • Finite State Inflow Model Augmented with Viscous Vortex Particle Method for Advanced Rotorcraft Configurations

    SBIR Phase I · Department of Defense (Army) · 2015 · $99,995

    Nov 16, 2015 – May 15, 2016

    Solicitation 2015.2 (2015) · Topic A152-090

  • Advanced Aerodynamic Interaction Solver with Coupled Viscous Vortex Particle Module/CFD/CSD in Support of Rotorcraft Design

    SBIR Phase I · Department of Defense (Army) · 2015 · $100,000

    Sep 15, 2015 – Mar 14, 2016

    Solicitation 2015.1 (2015) · Topic A15-027

  • High Fidelity Rotorcraft Towing Modeling and Simulation with Towed Magnetic Anomaly Detection System

    STTR Phase I · Department of Defense (Navy) · 2015 · $149,994

    Jun 15, 2015 – Oct 3, 2016

    Solicitation 2015.0 (2015) · Topic N15A-T009 · Research partner: Georgia Institute of Technology

  • Next Generation Aircraft Simulation Technology

    SBIR Phase I · Department of Defense (Air Force) · 2013 · $149,998

    Jan 14, 2013 – Oct 13, 2013

    Solicitation 2012.1 (2012) · Topic AF121-226

  • High Fidelity Wind Turbine Analysis Tool Leveraging High Performance Computing (HPC)

    SBIR Phase I · Department of Energy · 2012 · $150,000

    Feb 20, 2012 – Nov 19, 2012

    Solicitation DE-FOA-0000577 (2012) · Topic 02 a · Research partner: Stub

  • Precision Autonomous Virtual Flight Control

    SBIR Phase II · Department of Defense (Army) · 2012 · $779,975

    Oct 17, 2011 – Feb 16, 2014

    Solicitation 2010.3 (2010) · Topic A10-174 · Research partner: Stub

  • Advanced Turboshaft Engine/Drivetrain Modeling Technique for Real Time Rotorcraft Simulation

    SBIR Phase II · Department of Defense (Army) · 2011 · $729,902

    Started Sep 22, 2011

    Solicitation 2009.3 (2009) · Topic A09-125 · Research partner: Stub

Showing the 25 most recent of 82 awards.

Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026

Cloud services this company lists on the FedRAMP Marketplace, the government's record of cloud authorizations.

No FedRAMP Marketplace listing

No FedRAMP Marketplace listing is linked to this company. Cloud providers appear here automatically once FedRAMP lists their offering.

Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded

Checks a prime runs before teaming: SAM.gov exclusions (debarment and suspension) and the government's Consolidated Screening List for export and sanctions lists.

SAM.gov exclusions

Not yet checked against SAM.gov exclusions.

Search exclusions on SAM.gov (opens in a new tab)

Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.

Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded

Consolidated Screening List

No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).

The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.

Hourly ceiling rates this company was awarded on GSA contracts, compared with the market for similar labor categories. Ceiling rates are the most an agency can be charged, not prices paid.

No GSA CALC+ rates on record

Companies with a GSA Multiple Award Schedule contract appear here after CALC+ publishes their awarded labor rates.

NAICS, PSC & socio-economic status

Industry codes and small-business programs reported in SAM.gov.

NAICS codes

  • 541330Engineering ServicesPrimary

SAM.gov does not report this entity as small under any listed NAICS code.

Socio-economic status

No socio-economic certifications reported in SAM.gov.

Product & service codes (PSC)

No PSC codes reported.

This company has not published teaming preferences.

SAM.gov teaming eligibility: Eligible to be proposed as a team member: active SAM.gov registration and no exclusion.

Business development contact

No BD contact published

Contact details appear once the company claims this profile.
Immediate parent and highest-level owner as reported in SAM.gov.

No parent entity reported in SAM.gov.

SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.

Data sources & provenance

Who stands behind each fact on this page, and how to correct it.
  • SAM.gov

    Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.

  • USAspending.gov

    Prime award history and obligations (FPDS), synced nightly.

  • The contractor

    Nothing yet: this profile has not been claimed by the company.

  • TeamingIndex verification

    Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.

Corrections

Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)

Machine-readable: capability.md schema.org JSON-LD embedded in this page.

Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.

Teaming

Ready to team with ADVANCED ROTORCRAFT TECHNOLOGY, INC.?

Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.