HOLLADAY ENGINEERING COMPANY
Doing business as HECO ENGINEERS
- PAYETTE, ID 83661-2520
- hecoengineers.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- HUBZone
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $5.6M
- Awards on record
- 23
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
HOLLADAY ENGINEERING COMPANY has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About HOLLADAY ENGINEERING COMPANY
- Headquarters
- PAYETTE, ID 83661-2520
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIHMCMGJLPE5M3
- CAGE3DBX5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $5.6M
- Awards on record
- 23
- Top funding agencies
- National Park Service · Forest Service
Awards
140P2024F0220
Completed: Period of performance ended Mar 1, 2026AE DESIGN SERVICES FOR PREDESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, AND SUPPLEMENTAL SERVICES FOR THE…
Department of the Interior · National Park Service
- Obligated
- $2.5M
- Period of performance
- Jun 17, 2024 – Mar 1, 2026
140P2024F0022
Completed: Period of performance ended Dec 31, 2025SEKI 317446 TITLE III AE FOR WWTP AT BUCKEYE AND ASH MOUNTAIN
Department of the Interior · National Park Service
- Obligated
- $295.8K
- Period of performance
- Nov 1, 2023 – Dec 31, 2025
140P8525F0025
Completed: Period of performance ended Dec 30, 2025TITLE II SERVICES - REHABILITATE PW DUMP AND POTABLE WATER FILL STATIONS, LAKE MEAD NATIONAL RECREATION AREA, PMIS #229079 / 229080 / 229081
Department of the Interior · National Park Service
- Obligated
- $87.9K
- Period of performance
- Jun 3, 2025 – Dec 30, 2025
140P5325F0020
Completed: Period of performance ended Dec 30, 2025FOLLOW ON DESIGN BI LH BOARDWALK
Department of the Interior · National Park Service
- Obligated
- $22.7K
- Period of performance
- May 27, 2025 – Dec 30, 2025
140P8524F0077
Completed: Period of performance ended Oct 1, 2025TITLE III CONSTRUCTION MANAGEMENT SERVICES - REHABILITATE LONGMIRE WASTEWATER COLLECTION SYSTEM BY REPLACING THE LIFT STATION - PMIS…
Department of the Interior · National Park Service
- Obligated
- $38.9K
- Period of performance
- Jul 31, 2024 – Oct 1, 2025
140P2024F0252
Completed: Period of performance ended Aug 30, 2025GUIS 317374 - DS22-AE DESIGN CONTRACT PD
Department of the Interior · National Park Service
- Obligated
- $375.9K
- Period of performance
- Jun 26, 2024 – Aug 30, 2025
140P8524F0069
Completed: Period of performance ended Aug 4, 2025TITLE II DESIGN AND FINAL CONSTRUCTION DOCUMENTS SERVICES, REPLACE WASTEWATER SYSTEMS AT HAGMAIER RANCH, POINT REYES NATIONAL SEASHORE,…
Department of the Interior · National Park Service
- Obligated
- $221.7K
- Period of performance
- Jul 19, 2024 – Aug 4, 2025
140P8525F0015
Completed: Period of performance ended Jul 23, 2025TITLE I TOPOGRAPHIC SURVEY AND MAPPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON
Department of the Interior · National Park Service
- Obligated
- $72.3K
- Period of performance
- Apr 9, 2025 – Jul 23, 2025
140P5325F0001
Completed: Period of performance ended Jun 13, 2025PERFORM A&E FINAL DESIGN CUGA WRCG
Department of the Interior · National Park Service
- Obligated
- $42.1K
- Period of performance
- Jan 31, 2025 – Jun 13, 2025
140P5324F0075
Completed: Period of performance ended Apr 30, 2025CAHA - DESIGN HVAC FOR BUXTON DKQ, PKQ, AND BOOKSTORE
Department of the Interior · National Park Service
- Obligated
- $183.9K
- Period of performance
- Aug 19, 2024 – Apr 30, 2025
140P5224F0006
Completed: Period of performance ended Apr 29, 2025ENGINEERING SERVICES TO DESIGN THE MAIN FALLS EXISTING DOUBLE VAULT TOILET COMFORT STATION AT LITTLE RIVER CANYON FALLS PARKING LOT.
Department of the Interior · National Park Service
- Obligated
- $88K
- Period of performance
- Apr 30, 2024 – Apr 29, 2025
140P8524F0083
Completed: Period of performance ended Apr 8, 2025TITLE III CONSTRUCTION MANAGEMENT SERVICES, CEDAR GROVE WASTEWATER TREATMENT PLANT PRIMARY, KINGS CANYON NATIONAL PARK
Department of the Interior · National Park Service
- Obligated
- $20.1K
- Period of performance
- Jul 9, 2024 – Apr 8, 2025
12046W19F0029
Completed: Period of performance ended Mar 31, 2025DESIGN CONTRACT FOR MULTNOMAH FALLS LODGE ELECTRICAL SYSTEM
Department of Agriculture · Forest Service
- Obligated
- $342K
- Period of performance
- May 30, 2019 – Mar 31, 2025
140P8522F0080
Completed: Period of performance ended Feb 15, 2025TITLE I AE SERVICES CONDITION ASSESSMENTS FOR FIRE & ELECTRICAL SYSTEMS AT HEADQUARTERS AND MAINTENANCE WAREHOUSE
Department of the Interior · National Park Service
- Obligated
- $73.3K
- Period of performance
- Aug 17, 2022 – Feb 15, 2025
140P5324F0022
Completed: Period of performance ended Jan 31, 2025GUCO - A&E DESIGN_BARRIER GATE SYSTEM
Department of the Interior · National Park Service
- Obligated
- $66.7K
- Period of performance
- Jul 2, 2024 – Jan 31, 2025
140P5324F0003
Completed: Period of performance ended Oct 15, 2024PERFORM A&E DESIGN CUGA WR CAMPGROUND
Department of the Interior · National Park Service
- Obligated
- $42.4K
- Period of performance
- Dec 18, 2023 – Oct 15, 2024
140P5323F0027
Completed: Period of performance ended Aug 30, 2024CARL - TITLE III FOR SERVICES FOR WATER SYSTEM
Department of the Interior · National Park Service
- Obligated
- $59.9K
- Period of performance
- May 17, 2023 – Aug 30, 2024
140P8524F0047
Completed: Period of performance ended Jul 22, 2024TITLE I SCOPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON
Department of the Interior · National Park Service
- Obligated
- $66.9K
- Period of performance
- Apr 18, 2024 – Jul 22, 2024
140P5123F0037
Completed: Period of performance ended Jun 28, 2024DESIGN OF HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS FOR FORT SUMTER, FORT SUMTER LIBERTY SQUARE, AND FORT MOULTRIE VISITOR CENTERS.
Department of the Interior · National Park Service
- Obligated
- $615.9K
- Period of performance
- Jun 23, 2023 – Jun 28, 2024
140P5123F0027
Completed: Period of performance ended May 31, 2024ENHANCE PICNIC AREA DESIGN
Department of the Interior · National Park Service
- Obligated
- $69.8K
- Period of performance
- Jun 1, 2023 – May 31, 2024
140P8522F0021
Completed: Period of performance ended Mar 29, 2024TITLE III AE SERVICES - REHABILITATE LOG CABIN RESORT LOSS
Department of the Interior · National Park Service
- Obligated
- $126.7K
- Period of performance
- Jun 14, 2022 – Mar 29, 2024
140P5323F0025
Completed: Period of performance ended Feb 15, 2024CUGA - A&E VISITOR CENTER MECHANICAL SYSTEM
Department of the Interior · National Park Service
- Obligated
- $147.7K
- Period of performance
- May 9, 2023 – Feb 15, 2024
140P8523F0055
Completed: Period of performance ended Jan 25, 2024AE TITLE I SERVICES FOR ERP RE-POWER AND REPAIR LCM-6 LANDING CRAFT (HERON) HEAVY TRANSPORT VESSEL, GRAND COULEE WA, PMIS # 184438 - LAKE…
Department of the Interior · National Park Service
- Obligated
- $75.3K
- Period of performance
- Aug 28, 2023 – Jan 25, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
140P2024F0220 under 140P2021D0011 AE DESIGN SERVICES FOR PREDESIGN, SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, AND SUPPLEMENTAL SERVICES FOR THE… | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $2.5M | Jun 17, 2024 – Mar 1, 2026 | Completed: Period of performance ended Mar 1, 2026 |
140P2024F0022 under 140P2021D0011 SEKI 317446 TITLE III AE FOR WWTP AT BUCKEYE AND ASH MOUNTAIN | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $295.8K | Nov 1, 2023 – Dec 31, 2025 | Completed: Period of performance ended Dec 31, 2025 |
140P8525F0025 under 140P2021D0011 TITLE II SERVICES - REHABILITATE PW DUMP AND POTABLE WATER FILL STATIONS, LAKE MEAD NATIONAL RECREATION AREA, PMIS #229079 / 229080 / 229081 | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $87.9K | Jun 3, 2025 – Dec 30, 2025 | Completed: Period of performance ended Dec 30, 2025 |
140P5325F0020 under 140P2021D0011 FOLLOW ON DESIGN BI LH BOARDWALK | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $22.7K | May 27, 2025 – Dec 30, 2025 | Completed: Period of performance ended Dec 30, 2025 |
140P8524F0077 under 140P2021D0011 TITLE III CONSTRUCTION MANAGEMENT SERVICES - REHABILITATE LONGMIRE WASTEWATER COLLECTION SYSTEM BY REPLACING THE LIFT STATION - PMIS… | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $38.9K | Jul 31, 2024 – Oct 1, 2025 | Completed: Period of performance ended Oct 1, 2025 |
140P2024F0252 under 140P2021D0011 GUIS 317374 - DS22-AE DESIGN CONTRACT PD | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $375.9K | Jun 26, 2024 – Aug 30, 2025 | Completed: Period of performance ended Aug 30, 2025 |
140P8524F0069 under 140P2021D0011 TITLE II DESIGN AND FINAL CONSTRUCTION DOCUMENTS SERVICES, REPLACE WASTEWATER SYSTEMS AT HAGMAIER RANCH, POINT REYES NATIONAL SEASHORE,… | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $221.7K | Jul 19, 2024 – Aug 4, 2025 | Completed: Period of performance ended Aug 4, 2025 |
140P8525F0015 under 140P2021D0011 TITLE I TOPOGRAPHIC SURVEY AND MAPPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON | Department of the Interior · National Park Service | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $72.3K | Apr 9, 2025 – Jul 23, 2025 | Completed: Period of performance ended Jul 23, 2025 |
140P5325F0001 under 140P2021D0011 PERFORM A&E FINAL DESIGN CUGA WRCG | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $42.1K | Jan 31, 2025 – Jun 13, 2025 | Completed: Period of performance ended Jun 13, 2025 |
140P5324F0075 under 140P2021D0011 CAHA - DESIGN HVAC FOR BUXTON DKQ, PKQ, AND BOOKSTORE | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $183.9K | Aug 19, 2024 – Apr 30, 2025 | Completed: Period of performance ended Apr 30, 2025 |
140P5224F0006 under 140P2021D0011 ENGINEERING SERVICES TO DESIGN THE MAIN FALLS EXISTING DOUBLE VAULT TOILET COMFORT STATION AT LITTLE RIVER CANYON FALLS PARKING LOT. | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $88K | Apr 30, 2024 – Apr 29, 2025 | Completed: Period of performance ended Apr 29, 2025 |
140P8524F0083 under 140P2021D0011 TITLE III CONSTRUCTION MANAGEMENT SERVICES, CEDAR GROVE WASTEWATER TREATMENT PLANT PRIMARY, KINGS CANYON NATIONAL PARK | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $20.1K | Jul 9, 2024 – Apr 8, 2025 | Completed: Period of performance ended Apr 8, 2025 |
12046W19F0029 under 1205G219D0008 DESIGN CONTRACT FOR MULTNOMAH FALLS LODGE ELECTRICAL SYSTEM | Department of Agriculture · Forest Service | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $342K | May 30, 2019 – Mar 31, 2025 | Completed: Period of performance ended Mar 31, 2025 |
140P8522F0080 under 140P8519D0001 TITLE I AE SERVICES CONDITION ASSESSMENTS FOR FIRE & ELECTRICAL SYSTEMS AT HEADQUARTERS AND MAINTENANCE WAREHOUSE | Department of the Interior · National Park Service | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $73.3K | Aug 17, 2022 – Feb 15, 2025 | Completed: Period of performance ended Feb 15, 2025 |
140P5324F0022 under 140P2021D0011 GUCO - A&E DESIGN_BARRIER GATE SYSTEM | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $66.7K | Jul 2, 2024 – Jan 31, 2025 | Completed: Period of performance ended Jan 31, 2025 |
140P5324F0003 under 140P2021D0011 PERFORM A&E DESIGN CUGA WR CAMPGROUND | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $42.4K | Dec 18, 2023 – Oct 15, 2024 | Completed: Period of performance ended Oct 15, 2024 |
140P5323F0027 under 140P2021D0011 CARL - TITLE III FOR SERVICES FOR WATER SYSTEM | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $59.9K | May 17, 2023 – Aug 30, 2024 | Completed: Period of performance ended Aug 30, 2024 |
140P8524F0047 under 140P2021D0011 TITLE I SCOPING SERVICES, REHABILITATE HEADQUARTERS WATER DISTRIBUTION SYSTEM, OLYMPIC NATIONAL PARK, WASHINGTON | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $66.9K | Apr 18, 2024 – Jul 22, 2024 | Completed: Period of performance ended Jul 22, 2024 |
140P5123F0037 under 140P2021D0011 DESIGN OF HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS FOR FORT SUMTER, FORT SUMTER LIBERTY SQUARE, AND FORT MOULTRIE VISITOR CENTERS. | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $615.9K | Jun 23, 2023 – Jun 28, 2024 | Completed: Period of performance ended Jun 28, 2024 |
140P5123F0027 under 140P2021D0011 ENHANCE PICNIC AREA DESIGN | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $69.8K | Jun 1, 2023 – May 31, 2024 | Completed: Period of performance ended May 31, 2024 |
140P8522F0021 under 140P8519D0001 TITLE III AE SERVICES - REHABILITATE LOG CABIN RESORT LOSS | Department of the Interior · National Park Service | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $126.7K | Jun 14, 2022 – Mar 29, 2024 | Completed: Period of performance ended Mar 29, 2024 |
140P5323F0025 under 140P2021D0011 CUGA - A&E VISITOR CENTER MECHANICAL SYSTEM | Department of the Interior · National Park Service | 541330 · C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $147.7K | May 9, 2023 – Feb 15, 2024 | Completed: Period of performance ended Feb 15, 2024 |
140P8523F0055 under 140P8519D0001 AE TITLE I SERVICES FOR ERP RE-POWER AND REPAIR LCM-6 LANDING CRAFT (HERON) HEAVY TRANSPORT VESSEL, GRAND COULEE WA, PMIS # 184438 - LAKE… | Department of the Interior · National Park Service | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $75.3K | Aug 28, 2023 – Jan 25, 2024 | Completed: Period of performance ended Jan 25, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- STANTEC CONSULTING SERVICES INC.
UEI HAKDPJ5Q18X5
$622.7K
Subcontractor to this prime · 2 sub-awards · latest Sep 10, 2026
- Departmental Offices
- National Park Service
- “ELECTRICAL AND I&C DESIGN IN SUPPORT OF NPS CONTRACT YELLOWSTONE MAMMOTH TO GARDINER SEWER LINE”
- “CHANGE ORDER #001 ADDS $243,501.40 IN FUNDING TO SCOPE, CONVENYANCE & DISPOSAL FOR MT. RANIER PARADISE WASTEWATER PROJECT, ASHFORD, WA”
Subcontractors it has used
No reported sub-awards as a prime contractor.
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 238210Electrical Contractors and Other Wiring Installation ContractorsSmall business under this code’s size standard
- 541310Architectural ServicesSmall business under this code’s size standard
- 541340Drafting ServicesSmall business under this code’s size standard
- 541620Environmental Consulting ServicesSmall business under this code’s size standard
SAM.gov reports this entity as small under 4 of 5 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with HOLLADAY ENGINEERING COMPANY?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
