CONTRACK WATTS INC
- MC LEAN, VA 22101-3897
- contrackwatts.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $371M
- Awards on record
- 14
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
CONTRACK WATTS INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About CONTRACK WATTS INC
- Headquarters
- MC LEAN, VA 22101-3897
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIHW9NZYJARNA3
- CAGE0SS74
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $371M
- Awards on record
- 14
- Top funding agencies
- Department of the Navy · Department of the Army · Department of the Air Force
Awards
N4425525C1500
Recompete 18+ mo: Potential end Aug 2, 2030 (44 months away)MILCON P859 DBB CVN 78 AIRCRAFT CARRIER ELECTRICAL UPGRADE FOR VARIOUS SUBSTATION LOCATIONS WITHIN NAVAL BASE KITSAP-BREMERTON, WA
Department of Defense · Department of the Navy
- Obligated
- $183M
- Period of performance
- Sep 23, 2025 – Aug 2, 2030
N4425525F4136
Completed: Period of performance ended Oct 20, 2026RM16-2114 REPAIR DDG HOMEPORT PIERS & WHARF, NAVAL STATION (NS) EVERETT
Department of Defense · Department of the Navy
- Obligated
- $34.4M
- Period of performance
- Apr 2, 2025 – Oct 20, 2026
FA890325F0212
Completed: Period of performance ended Sep 29, 2026ATTEND MANDATORY VIRTUAL POST AWARD CONFERENCE ON 30 SEPTEMBER 2025 AT 1100 CDT. IN-PERSON KICK-OFF AWARD CONFERENCE TO BE SCHEDULED…
Department of Defense · Department of the Air Force
- Obligated
- $3K
- Period of performance
- Sep 30, 2025 – Sep 29, 2026
N4425523F4445
Completed: Period of performance ended Mar 25, 2026P907 TRANSIT PROTECTION SYSTEM (TPS) FUELING AND VESSEL, NBK BANGOR, SILVERDALE, WA
Department of Defense · Department of the Navy
- Obligated
- $29.7M
- Period of performance
- Sep 13, 2023 – Mar 25, 2026
W912ER22C0010
Completed: Period of performance ended Mar 5, 2026DESIGN BID BUILD CONTRACT FOR CONSTRUCTION AND UPGRADE OF CURRENT ELECTRICAL SYSTEM AT NAVAL SUPPORT ACTIVITY (NSA), MANAMA, BAHRAIN.
Department of Defense · Department of the Army
- Obligated
- $36.6M
- Period of performance
- Mar 24, 2022 – Mar 5, 2026
N4425524F4178
Completed: Period of performance ended Dec 9, 2025THE PROJECT IS HIGH PRIORITY EMERGENCY REPAIR WORK REQUIRED FOR TANG ROAD, NBK-BANGOR, SWFPAC. IT INCLUDES STRUCTURAL REPAIRS TO THE…
Department of Defense · Department of the Navy
- Obligated
- $33.3M
- Period of performance
- Apr 25, 2024 – Dec 9, 2025
W912ER21C0013
Completed: Period of performance ended Nov 7, 2025CONSTRUCT SHORE TO SHIP UTILITIES, AT NAVAL SUPPORT ACTIVITY (NSA) WATERFRONT, LOCATED AT MANAMA BAHRAIN
Department of Defense · Department of the Army
- Obligated
- $41.7M
- Period of performance
- Jun 30, 2021 – Nov 7, 2025
N4425523F4397
Completed: Period of performance ended Sep 4, 2024X5860989 MSR #14083792_1726887 -- SIOP - MHE STORAGE YARD SPILL P
Department of Defense · Department of the Navy
- Obligated
- $4.9M
- Period of performance
- Jul 28, 2023 – Sep 4, 2024
W5J9JE22F0030
Completed: Period of performance ended Apr 13, 2024ADMIN FACILITY
Department of Defense · Department of the Army
- Obligated
- $7.4M
- Period of performance
- Sep 30, 2022 – Apr 13, 2024
W912ER21C0022
Completed: Period of performance ended Oct 3, 2023CONSTRUCT MODULAR HOUSING (1,520 CHUS) AT PRINCE SULTAN AIR BASE, KINGDOM OF SAUDI ARABIA
Department of Defense · Department of the Army
- Obligated
- $32.8M
- Period of performance
- Sep 9, 2021 – Oct 3, 2023
N4425517C8000
Completed: Period of performance ended May 16, 2022IGF::OT::IGF RM 15-1693 REPAIR DD2 UTILITY SYSTEMS
Department of Defense · Department of the Navy
- Obligated
- $34.5M
- Period of performance
- Sep 29, 2017 – May 16, 2022
W912ER11D0009-0012
Completed: Period of performance ended Sep 23, 2021IGF::OT::IGF CONSTRUCTION OF MEDICAL-DENTAL CLINIC REPLACEMENT, MANAMA, BAHRAIN
Department of Defense · Department of the Army
- Obligated
- $28.2M
- Period of performance
- Mar 17, 2016 – Sep 23, 2021
W912ER11D0009-0013
Completed: Period of performance ended Jun 25, 2020IGF::OT::IGF DESIGN AND CONSTRUCTION OF P-970 SHIP MAINTENANCE FACILITIES, MANAMA, BAHRAIN
Department of Defense · Department of the Army
- Obligated
- $38.4M
- Period of performance
- Jun 10, 2016 – Jun 25, 2020
W912ER11D0009-0011
Completed: Period of performance ended Jan 31, 2020IGF::OT::IGF P955 P-8A TENSION FABRIC HANGAR, ISA AIR BASE, BAHRAIN
Department of Defense · Department of the Army
- Obligated
- $21.9M
- Period of performance
- Sep 16, 2015 – Jan 31, 2020
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
N4425525C1500 MILCON P859 DBB CVN 78 AIRCRAFT CARRIER ELECTRICAL UPGRADE FOR VARIOUS SUBSTATION LOCATIONS WITHIN NAVAL BASE KITSAP-BREMERTON, WA | Department of Defense · Department of the Navy | 237130 · Y1NZCONSTRUCTION OF OTHER UTILITIES | $183M | Sep 23, 2025 – Aug 2, 2030 | Recompete 18+ mo: Potential end Aug 2, 2030 (44 months away) |
N4425525F4136 under N4425521D5003 RM16-2114 REPAIR DDG HOMEPORT PIERS & WHARF, NAVAL STATION (NS) EVERETT | Department of Defense · Department of the Navy | 237990 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $34.4M | Apr 2, 2025 – Oct 20, 2026 | Completed: Period of performance ended Oct 20, 2026 |
FA890325F0212 under FA890325D0083 ATTEND MANDATORY VIRTUAL POST AWARD CONFERENCE ON 30 SEPTEMBER 2025 AT 1100 CDT. IN-PERSON KICK-OFF AWARD CONFERENCE TO BE SCHEDULED… | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $3K | Sep 30, 2025 – Sep 29, 2026 | Completed: Period of performance ended Sep 29, 2026 |
N4425523F4445 under N4425521D5003 P907 TRANSIT PROTECTION SYSTEM (TPS) FUELING AND VESSEL, NBK BANGOR, SILVERDALE, WA | Department of Defense · Department of the Navy | 237990 · Y1ECCONSTRUCTION OF PRODUCTION BUILDINGS | $29.7M | Sep 13, 2023 – Mar 25, 2026 | Completed: Period of performance ended Mar 25, 2026 |
W912ER22C0010 DESIGN BID BUILD CONTRACT FOR CONSTRUCTION AND UPGRADE OF CURRENT ELECTRICAL SYSTEM AT NAVAL SUPPORT ACTIVITY (NSA), MANAMA, BAHRAIN. | Department of Defense · Department of the Army | 237130 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $36.6M | Mar 24, 2022 – Mar 5, 2026 | Completed: Period of performance ended Mar 5, 2026 |
N4425524F4178 under N4425521D5003 THE PROJECT IS HIGH PRIORITY EMERGENCY REPAIR WORK REQUIRED FOR TANG ROAD, NBK-BANGOR, SWFPAC. IT INCLUDES STRUCTURAL REPAIRS TO THE… | Department of Defense · Department of the Navy | 237990 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $33.3M | Apr 25, 2024 – Dec 9, 2025 | Completed: Period of performance ended Dec 9, 2025 |
W912ER21C0013 CONSTRUCT SHORE TO SHIP UTILITIES, AT NAVAL SUPPORT ACTIVITY (NSA) WATERFRONT, LOCATED AT MANAMA BAHRAIN | Department of Defense · Department of the Army | 236220 · Y1AACONSTRUCTION OF OFFICE BUILDINGS | $41.7M | Jun 30, 2021 – Nov 7, 2025 | Completed: Period of performance ended Nov 7, 2025 |
N4425523F4397 under N4425521D5003 X5860989 MSR #14083792_1726887 -- SIOP - MHE STORAGE YARD SPILL P | Department of Defense · Department of the Navy | 237990 · Z2EBREPAIR OR ALTERATION OF MAINTENANCE BUILDINGS | $4.9M | Jul 28, 2023 – Sep 4, 2024 | Completed: Period of performance ended Sep 4, 2024 |
W5J9JE22F0030 under W912ER18D0006 ADMIN FACILITY | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $7.4M | Sep 30, 2022 – Apr 13, 2024 | Completed: Period of performance ended Apr 13, 2024 |
W912ER21C0022 CONSTRUCT MODULAR HOUSING (1,520 CHUS) AT PRINCE SULTAN AIR BASE, KINGDOM OF SAUDI ARABIA | Department of Defense · Department of the Army | 236220 · Y1FCCONSTRUCTION OF TROOP HOUSING FACILITIES | $32.8M | Sep 9, 2021 – Oct 3, 2023 | Completed: Period of performance ended Oct 3, 2023 |
N4425517C8000 IGF::OT::IGF RM 15-1693 REPAIR DD2 UTILITY SYSTEMS | Department of Defense · Department of the Navy | 237130 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $34.5M | Sep 29, 2017 – May 16, 2022 | Completed: Period of performance ended May 16, 2022 |
W912ER11D0009-0012 under W912ER11D0009 IGF::OT::IGF CONSTRUCTION OF MEDICAL-DENTAL CLINIC REPLACEMENT, MANAMA, BAHRAIN | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $28.2M | Mar 17, 2016 – Sep 23, 2021 | Completed: Period of performance ended Sep 23, 2021 |
W912ER11D0009-0013 under W912ER11D0009 IGF::OT::IGF DESIGN AND CONSTRUCTION OF P-970 SHIP MAINTENANCE FACILITIES, MANAMA, BAHRAIN | Department of Defense · Department of the Army | 236220 · Y1EDCONSTRUCTION OF SHIP CONSTRUCTION AND REPAIR FACILITIES | $38.4M | Jun 10, 2016 – Jun 25, 2020 | Completed: Period of performance ended Jun 25, 2020 |
W912ER11D0009-0011 under W912ER11D0009 IGF::OT::IGF P955 P-8A TENSION FABRIC HANGAR, ISA AIR BASE, BAHRAIN | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $21.9M | Sep 16, 2015 – Jan 31, 2020 | Completed: Period of performance ended Jan 31, 2020 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimary
- 237130Power and Communication Line and Related Structures Construction
- 237310Highway, Street, and Bridge Construction
- 237990Other Heavy and Civil Engineering Construction
- 238990All Other Specialty Trade Contractors
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with CONTRACK WATTS INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
