ADC ENGINEERING INC
- HANAHAN, SC 29410-2796
- adcengineering.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $22.1M
- Awards on record
- 28
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
ADC ENGINEERING INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About ADC ENGINEERING INC
- Headquarters
- HANAHAN, SC 29410-2796
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIJ8FFZNA58LC3
- CAGE07DT0
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $22.1M
- Awards on record
- 28
- Top funding agencies
- Department of the Air Force · Department of the Army · U.S. Coast Guard
25 most recent of 28 awards
W9133L24F6109
Recompete 18+ mo: Potential end Aug 20, 2029 (33 months away)MINIMUM GUARANTEE FOR HR2
Department of Defense · Department of the Army
- Obligated
- $2.5K
- Period of performance
- Aug 23, 2024 – Aug 20, 2029
W9128F23F0204
Recompete 18+ mo: Potential end Aug 23, 2028 (21 months away)MINIMUM GUARANTEE - $10M SB AE AFP
Department of Defense · Department of the Army
- Obligated
- $0
- Period of performance
- Aug 24, 2023 – Aug 23, 2028
FA441825F0123
Recompete 12–18 mo: Potential end Mar 22, 2028 (16 months away)PERFORMANCE OF TITLE II CONSTRUCTION INSPECTION SERVICES (CI) AND TITLE II QUALITY ASSURANCE SERVICES (QA) FOR DORM RENOVATION PROJECT AT…
Department of Defense · Department of the Air Force
- Obligated
- $451.1K
- Period of performance
- Sep 22, 2025 – Mar 22, 2028
FA441825F0087
Completed: Period of performance ended Sep 7, 2026A/E SERVICES TO PROVIDE FEASIBILITY STUDIES, COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, COST ESTIMATE, AND OTHER PROJECT DESIGN…
Department of Defense · Department of the Air Force
- Obligated
- $702.4K
- Period of performance
- Aug 14, 2025 – Sep 7, 2026
W9128F25FA107
Completed: Period of performance ended Aug 20, 2026USAR PAVER
Department of Defense · Department of the Army
- Obligated
- $957.1K
- Period of performance
- Aug 20, 2025 – Aug 20, 2026
FA441825F0060
Completed: Period of performance ended Jul 14, 2026DKFX 091009F -REPAIR IMC AREA F PAVEMENT, TITLE II SERVICES
Department of Defense · Department of the Air Force
- Obligated
- $282.4K
- Period of performance
- Jun 11, 2025 – Jul 14, 2026
70Z03626PCHAR0010
Completed: Period of performance ended Jun 30, 2026USCG BASE CHARLESTON RICE MILL BUILDING ENVELOPE
Department of Homeland Security · U.S. Coast Guard
- Obligated
- $22.8K
- Period of performance
- May 25, 2026 – Jun 30, 2026
FA890323F0006
Completed: Period of performance ended May 29, 2026TITLE II SERVICES FOR REPAIR RUNWAY 21R/03L, TRAVIS AIR FORCE BASE (TAFB), CALIFORNIA, PROJECT NO. XDAT181013
Department of Defense · Department of the Air Force
- Obligated
- $11M
- Period of performance
- Jan 18, 2023 – May 29, 2026
FA441825F0083
Completed: Period of performance ended Mar 31, 2026THE A/E SHALL FURNISH QUALIFIED PERSONNEL, MATERIALS, DRAWINGS, SPECIFICATIONS, AND COST ESTIMATES FOR PROJECT REPAIR IMC PAVEMENTS - AREA…
Department of Defense · Department of the Air Force
- Obligated
- $184.5K
- Period of performance
- Aug 5, 2025 – Mar 31, 2026
FA890324F0021
Completed: Period of performance ended Feb 27, 2026THE WORK WILL BE IAW THE SOW DATE 27 OCT 2023, POOL 1 AIRFIELD INFRASTRUCTURE TITLE 2 AE SVCS FOR DESIGN-BUILD CONS OF REPAIR 400 ACFT…
Department of Defense · Department of the Air Force
- Obligated
- $1.9M
- Period of performance
- May 23, 2024 – Feb 27, 2026
FA441824F0031
Completed: Period of performance ended Feb 13, 2026JBCS 1137655 - DESIGN - CONSTRUCT SHORT STAY SEWER SYSTEM (MONCKS CORNER, SC).
Department of Defense · Department of the Air Force
- Obligated
- $175.2K
- Period of performance
- Feb 7, 2024 – Feb 13, 2026
FA441825F0067
Completed: Period of performance ended Dec 22, 2025THE A/E SHALL FURNISH THE PERSONNEL, SERVICES, EQUIPMENT, MATERIALS, FACILITIES, OR INCIDENTAL TO, THE PERFORMANCE OF WORK FOR TITLE II…
Department of Defense · Department of the Air Force
- Obligated
- $178.9K
- Period of performance
- Jun 25, 2025 – Dec 22, 2025
FA441824F0061
Completed: Period of performance ended Dec 5, 2025PROVIDE COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, CONSTRUCTION COST ESTIMATE, DESIGN SCHEDULE, AND OTHER SUPPORTING ANALYSES AND…
Department of Defense · Department of the Air Force
- Obligated
- $818.6K
- Period of performance
- May 21, 2024 – Dec 5, 2025
FA441824F0137
Completed: Period of performance ended Nov 18, 2025THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33…
Department of Defense · Department of the Air Force
- Obligated
- $936.5K
- Period of performance
- Sep 12, 2024 – Nov 18, 2025
FA441824F0084
Completed: Period of performance ended Sep 30, 2025THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT…
Department of Defense · Department of the Air Force
- Obligated
- $192.5K
- Period of performance
- Jul 8, 2024 – Sep 30, 2025
FA441824F0153
Completed: Period of performance ended May 23, 2025THE A/E SHALL PROVIDE COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, A COST ESTIMATE, AND OTHER PROJECT DESIGN DOCUMENTS NECESSARY FOR…
Department of Defense · Department of the Air Force
- Obligated
- $139.3K
- Period of performance
- Sep 20, 2024 – May 23, 2025
FA441824F0050
Completed: Period of performance ended Apr 11, 2025THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT…
Department of Defense · Department of the Air Force
- Obligated
- $1.2M
- Period of performance
- May 10, 2024 – Apr 11, 2025
W9128F24F0280
Completed: Period of performance ended Mar 31, 2025ELECTRICAL CONDITION ASSMT, LIBBY AAF AZ
Department of Defense · Department of the Army
- Obligated
- $480.7K
- Period of performance
- Sep 27, 2024 – Mar 31, 2025
FA441824F0125
Completed: Period of performance ended Mar 22, 2025THE CONTRACTOR SHALL PROVIDE ARCHITECT-ENGINEER (A/E) SERVICES TO PROVIDE COMPLETE/DETAILED DRAWINGS, SPECS, COST ESTIMATE, AND OTHER…
Department of Defense · Department of the Air Force
- Obligated
- $214K
- Period of performance
- Sep 3, 2024 – Mar 22, 2025
FA441824F0056
Completed: Period of performance ended Dec 16, 2024THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT…
Department of Defense · Department of the Air Force
- Obligated
- $461.2K
- Period of performance
- May 9, 2024 – Dec 16, 2024
FA441824F0059
Completed: Period of performance ended Dec 13, 2024DKFX 1093395 - DESIGN REPAIR AIRCRAFT PARKING RAMP PHASE 3 TASK ORDER
Department of Defense · Department of the Air Force
- Obligated
- $90.6K
- Period of performance
- May 22, 2024 – Dec 13, 2024
FA441824F0019
Completed: Period of performance ended Oct 30, 2024DKGV 1134570 - REPAIR DRY WELL LIFT STATIONS 66 & 310
Department of Defense · Department of the Air Force
- Obligated
- $198.3K
- Period of performance
- Nov 15, 2023 – Oct 30, 2024
FA441824F0038
Completed: Period of performance ended Oct 10, 2024REPAIR AIRFIELD PARKING RAMP - PHASE 2 (TITLE II SERVICES)
Department of Defense · Department of the Air Force
- Obligated
- $256.4K
- Period of performance
- Apr 23, 2024 – Oct 10, 2024
FA441823F0131
Completed: Period of performance ended Sep 20, 2024DESIGN REPAIR OF JOINT BASE CHARLESTON CHILD DEVELOPMENT CENTERS.
Department of Defense · Department of the Air Force
- Obligated
- $619K
- Period of performance
- Sep 28, 2023 – Sep 20, 2024
FA441823F0072
Completed: Period of performance ended Aug 29, 2024DKFX-1098513- TITLE II: REPAIR AF LIGHT VAULT CONTROL CABINET B90
Department of Defense · Department of the Air Force
- Obligated
- $230.1K
- Period of performance
- May 31, 2023 – Aug 29, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W9133L24F6109 under W9133L24D6109 MINIMUM GUARANTEE FOR HR2 | Department of Defense · Department of the Army | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $2.5K | Aug 23, 2024 – Aug 20, 2029 | Recompete 18+ mo: Potential end Aug 20, 2029 (33 months away) |
W9128F23F0204 under W9128F23D0021 MINIMUM GUARANTEE - $10M SB AE AFP | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $0 | Aug 24, 2023 – Aug 23, 2028 | Recompete 18+ mo: Potential end Aug 23, 2028 (21 months away) |
FA441825F0123 under FA441822D0006 PERFORMANCE OF TITLE II CONSTRUCTION INSPECTION SERVICES (CI) AND TITLE II QUALITY ASSURANCE SERVICES (QA) FOR DORM RENOVATION PROJECT AT… | Department of Defense · Department of the Air Force | 541330 · Z2FCREPAIR OR ALTERATION OF TROOP HOUSING FACILITIES | $451.1K | Sep 22, 2025 – Mar 22, 2028 | Recompete 12–18 mo: Potential end Mar 22, 2028 (16 months away)AI brief for award FA441825F0123Bid team for the recompete of award FA441825F0123 |
FA441825F0087 under FA441822D0006 A/E SERVICES TO PROVIDE FEASIBILITY STUDIES, COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, COST ESTIMATE, AND OTHER PROJECT DESIGN… | Department of Defense · Department of the Air Force | 541330 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $702.4K | Aug 14, 2025 – Sep 7, 2026 | Completed: Period of performance ended Sep 7, 2026 |
W9128F25FA107 under W9128F23D0021 USAR PAVER | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $957.1K | Aug 20, 2025 – Aug 20, 2026 | Completed: Period of performance ended Aug 20, 2026 |
FA441825F0060 under FA441822D0006 DKFX 091009F -REPAIR IMC AREA F PAVEMENT, TITLE II SERVICES | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $282.4K | Jun 11, 2025 – Jul 14, 2026 | Completed: Period of performance ended Jul 14, 2026 |
70Z03626PCHAR0010 USCG BASE CHARLESTON RICE MILL BUILDING ENVELOPE | Department of Homeland Security · U.S. Coast Guard | 541350 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $22.8K | May 25, 2026 – Jun 30, 2026 | Completed: Period of performance ended Jun 30, 2026 |
FA890323F0006 under FA890321D0018 TITLE II SERVICES FOR REPAIR RUNWAY 21R/03L, TRAVIS AIR FORCE BASE (TAFB), CALIFORNIA, PROJECT NO. XDAT181013 | Department of Defense · Department of the Air Force | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $11M | Jan 18, 2023 – May 29, 2026 | Completed: Period of performance ended May 29, 2026 |
FA441825F0083 under FA441822D0006 THE A/E SHALL FURNISH QUALIFIED PERSONNEL, MATERIALS, DRAWINGS, SPECIFICATIONS, AND COST ESTIMATES FOR PROJECT REPAIR IMC PAVEMENTS - AREA… | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $184.5K | Aug 5, 2025 – Mar 31, 2026 | Completed: Period of performance ended Mar 31, 2026 |
FA890324F0021 under FA890321D0018 THE WORK WILL BE IAW THE SOW DATE 27 OCT 2023, POOL 1 AIRFIELD INFRASTRUCTURE TITLE 2 AE SVCS FOR DESIGN-BUILD CONS OF REPAIR 400 ACFT… | Department of Defense · Department of the Air Force | 541330 · C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $1.9M | May 23, 2024 – Feb 27, 2026 | Completed: Period of performance ended Feb 27, 2026 |
FA441824F0031 under FA441822D0006 JBCS 1137655 - DESIGN - CONSTRUCT SHORT STAY SEWER SYSTEM (MONCKS CORNER, SC). | Department of Defense · Department of the Air Force | 541330 · Z2NDREPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES | $175.2K | Feb 7, 2024 – Feb 13, 2026 | Completed: Period of performance ended Feb 13, 2026 |
FA441825F0067 under FA441822D0006 THE A/E SHALL FURNISH THE PERSONNEL, SERVICES, EQUIPMENT, MATERIALS, FACILITIES, OR INCIDENTAL TO, THE PERFORMANCE OF WORK FOR TITLE II… | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $178.9K | Jun 25, 2025 – Dec 22, 2025 | Completed: Period of performance ended Dec 22, 2025 |
FA441824F0061 under FA441822D0006 PROVIDE COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, CONSTRUCTION COST ESTIMATE, DESIGN SCHEDULE, AND OTHER SUPPORTING ANALYSES AND… | Department of Defense · Department of the Air Force | 541330 · Z2FCREPAIR OR ALTERATION OF TROOP HOUSING FACILITIES | $818.6K | May 21, 2024 – Dec 5, 2025 | Completed: Period of performance ended Dec 5, 2025 |
FA441824F0137 under FA441822D0006 THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN THE REPAIR/REPLACEMENT METHOD FOR THE PAVEMENT SECTION BETWEEN RUNWAY 03-21 AND 15-33… | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $936.5K | Sep 12, 2024 – Nov 18, 2025 | Completed: Period of performance ended Nov 18, 2025 |
FA441824F0084 under FA441822D0006 THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT… | Department of Defense · Department of the Air Force | 541330 · Z2PZREPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES | $192.5K | Jul 8, 2024 – Sep 30, 2025 | Completed: Period of performance ended Sep 30, 2025 |
FA441824F0153 under FA441822D0006 THE A/E SHALL PROVIDE COMPLETE AND DETAILED DRAWINGS, SPECIFICATIONS, A COST ESTIMATE, AND OTHER PROJECT DESIGN DOCUMENTS NECESSARY FOR… | Department of Defense · Department of the Air Force | 541330 · Y1GDCONSTRUCTION OF OPEN STORAGE FACILITIES | $139.3K | Sep 20, 2024 – May 23, 2025 | Completed: Period of performance ended May 23, 2025 |
FA441824F0050 under FA441822D0006 THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT… | Department of Defense · Department of the Air Force | 541330 · C1EBARCHITECT AND ENGINEERING- CONSTRUCTION: MAINTENANCE BUILDINGS | $1.2M | May 10, 2024 – Apr 11, 2025 | Completed: Period of performance ended Apr 11, 2025 |
W9128F24F0280 under W9128F23D0021 ELECTRICAL CONDITION ASSMT, LIBBY AAF AZ | Department of Defense · Department of the Army | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $480.7K | Sep 27, 2024 – Mar 31, 2025 | Completed: Period of performance ended Mar 31, 2025 |
FA441824F0125 under FA441822D0006 THE CONTRACTOR SHALL PROVIDE ARCHITECT-ENGINEER (A/E) SERVICES TO PROVIDE COMPLETE/DETAILED DRAWINGS, SPECS, COST ESTIMATE, AND OTHER… | Department of Defense · Department of the Air Force | 541330 · Z2EBREPAIR OR ALTERATION OF MAINTENANCE BUILDINGS | $214K | Sep 3, 2024 – Mar 22, 2025 | Completed: Period of performance ended Mar 22, 2025 |
FA441824F0056 under FA441822D0006 THE A/E SHALL FURNISH QUALIFIED PERSONNEL TO DESIGN VARIOUS PROJECTS AT JOINT BASE CHARLESTON AND ITS OUTLYING PROPERTIES IN STRICT… | Department of Defense · Department of the Air Force | 541330 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $461.2K | May 9, 2024 – Dec 16, 2024 | Completed: Period of performance ended Dec 16, 2024 |
FA441824F0059 under FA441822D0006 DKFX 1093395 - DESIGN REPAIR AIRCRAFT PARKING RAMP PHASE 3 TASK ORDER | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $90.6K | May 22, 2024 – Dec 13, 2024 | Completed: Period of performance ended Dec 13, 2024 |
FA441824F0019 under FA441822D0006 DKGV 1134570 - REPAIR DRY WELL LIFT STATIONS 66 & 310 | Department of Defense · Department of the Air Force | 541330 · Z2NDREPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES | $198.3K | Nov 15, 2023 – Oct 30, 2024 | Completed: Period of performance ended Oct 30, 2024 |
FA441824F0038 under FA441822D0006 REPAIR AIRFIELD PARKING RAMP - PHASE 2 (TITLE II SERVICES) | Department of Defense · Department of the Air Force | 541330 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $256.4K | Apr 23, 2024 – Oct 10, 2024 | Completed: Period of performance ended Oct 10, 2024 |
FA441823F0131 under FA441822D0006 DESIGN REPAIR OF JOINT BASE CHARLESTON CHILD DEVELOPMENT CENTERS. | Department of Defense · Department of the Air Force | 541330 · C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | $619K | Sep 28, 2023 – Sep 20, 2024 | Completed: Period of performance ended Sep 20, 2024 |
FA441823F0072 under FA441822D0006 DKFX-1098513- TITLE II: REPAIR AF LIGHT VAULT CONTROL CABINET B90 | Department of Defense · Department of the Air Force | 541330 · Z2BZREPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES | $230.1K | May 31, 2023 – Aug 29, 2024 | Completed: Period of performance ended Aug 29, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- HDR ENGINEERING, INC OF THE CAROLINAS
UEI KJEQC3DJWCJ5
$439.4K
Subcontractor to this prime · 1 sub-award · latest Apr 11, 2025
- Department of the Navy
- “NAVFAC P658 - FITNESS CENTER”
Subcontractors it has used
No reported sub-awards as a prime contractor.
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
- C1AAARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS
- C1ABARCHITECT AND ENGINEERING- CONSTRUCTION: CONFERENCE SPACE AND FACILITIES
- C1AZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS
- C1BAARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TOWERS
- C1BBARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TRAINING FACILITIES
- C1BCARCHITECT AND ENGINEERING- CONSTRUCTION: RADAR AND NAVIGATIONAL FACILITIES
- C1BEARCHITECT AND ENGINEERING- CONSTRUCTION: AIRPORT TERMINALS
- C1BFARCHITECT AND ENGINEERING- CONSTRUCTION: MISSILE SYSTEM FACILITIES
- C1BGARCHITECT AND ENGINEERING- CONSTRUCTION: ELECTRONIC AND COMMUNICATIONS FACILITIES
- C1BZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES
- C1CAARCHITECT AND ENGINEERING- CONSTRUCTION: SCHOOLS
- C1CZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER EDUCATIONAL BUILDINGS
- C1DAARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES
- C1DBARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS
- C1DZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS
- C1ECARCHITECT AND ENGINEERING- CONSTRUCTION: PRODUCTION BUILDINGS
- C1EDARCHITECT AND ENGINEERING- CONSTRUCTION: SHIP CONSTRUCTION AND REPAIR FACILITIES
- C1EEARCHITECT AND ENGINEERING- CONSTRUCTION: TANK AUTOMOTIVE FACILITIES
- C1EZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER INDUSTRIAL BUILDINGS
- C1HCARCHITECT AND ENGINEERING- CONSTRUCTION: GOVT-OWNED CTR-OPERATED (GOCO) ENVIRONMENTAL LABORATORIES
- C1HZARCHITECT AND ENGINEERING- CONSTRUCTION: GOVT-OWNED GOVT-OPERATED (GOGO) ENVIRONMENTAL LABORATORIES
- C1KCARCHITECT AND ENGINEERING- CONSTRUCTION: MINE FIRE CONTROL FACILITIES
- C1KFARCHITECT AND ENGINEERING- CONSTRUCTION: DREDGING FACILITIES
- C1KZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- C1LZARCHITECT AND ENGINEERING- CONSTRUCTION: PARKING FACILITIES
- C1NAARCHITECT AND ENGINEERING- CONSTRUCTION: FUEL SUPPLY FACILITIES
- C1NDARCHITECT AND ENGINEERING- CONSTRUCTION: SEWAGE AND WASTE FACILITIES
- C1NEARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
- C1PAARCHITECT AND ENGINEERING- CONSTRUCTION: RECREATIONAL FACILITIES (NON-BUILDING)
- C1PDARCHITECT AND ENGINEERING- CONSTRUCTION: WASTE TREATMENT AND STORAGE FACILITIES
- C1PZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER NON-BUILDING FACILITIES
- C219ARCHITECT AND ENGINEERING- GENERAL: OTHER
- C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with ADC ENGINEERING INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
