APPLIED OPTIMIZATION, INC.
- FAIRBORN, OH 45324-6272
- appliedo.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $7M
- Awards on record
- 8
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
APPLIED OPTIMIZATION, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About APPLIED OPTIMIZATION, INC.
- Headquarters
- FAIRBORN, OH 45324-6272
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIJGPNAVA6MSJ9
- CAGE1HRG0
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $7M
- Awards on record
- 8
- Top funding agencies
- Department of the Air Force · Department of the Navy
Awards
N6833523C0121
Completed: Period of performance ended Nov 4, 2026RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
- Obligated
- $1.1M
- Period of performance
- May 3, 2023 – Nov 4, 2026
FA865125CB010
Completed: Period of performance ended Oct 10, 2026WIDE FIELD OF VIEW LENSING SPATIALLY VARIANT PHOTONIC CRYSTALS
Department of Defense · Department of the Air Force
- Obligated
- $1.8M
- Period of performance
- Oct 16, 2024 – Oct 10, 2026
FA945124CX005
Completed: Period of performance ended Apr 30, 2026SATELLITE AND DEBRIS DISCRIMINATION AND IDENTIFICATION
Department of Defense · Department of the Air Force
- Obligated
- $1.2M
- Period of performance
- Dec 21, 2023 – Apr 30, 2026
N6833525C0464
Completed: Period of performance ended Jan 20, 2026RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
- Obligated
- $140K
- Period of performance
- Jul 9, 2025 – Jan 20, 2026
N6833519C0366
Completed: Period of performance ended Sep 3, 2025RESEARCH AND DEVELOPMENT
Department of Defense · Department of the Navy
- Obligated
- $2M
- Period of performance
- Sep 4, 2019 – Sep 3, 2025
FA875024CB121
Completed: Period of performance ended Apr 21, 2025EVALUATING DATA STRATEGIES IN TRAINING AI SOLUTIONS FOR SPACE C2 TO DESIGN A DIGITAL TRAINING ENVIRONMENT FOR DATA-INFORMED COMPETITIVE…
Department of Defense · Department of the Air Force
- Obligated
- $180K
- Period of performance
- Aug 19, 2024 – Apr 21, 2025
N6833524C0424
Completed: Period of performance ended Dec 30, 2024STTR PHASE I UNDER TOPIC N24A-T003.
Department of Defense · Department of the Navy
- Obligated
- $140K
- Period of performance
- Jul 2, 2024 – Dec 30, 2024
FA865020C1145
Completed: Period of performance ended Sep 29, 2024ENGINEERING AND OPERATIONS FOR TURBULENCE AND AEROSOL RESEARCH (EOTAR)
Department of Defense · Department of the Air Force
- Obligated
- $409.8K
- Period of performance
- Sep 18, 2020 – Sep 29, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
N6833523C0121 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH | $1.1M | May 3, 2023 – Nov 4, 2026 | Completed: Period of performance ended Nov 4, 2026 |
FA865125CB010 WIDE FIELD OF VIEW LENSING SPATIALLY VARIANT PHOTONIC CRYSTALS | Department of Defense · Department of the Air Force | 541715 · AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH | $1.8M | Oct 16, 2024 – Oct 10, 2026 | Completed: Period of performance ended Oct 10, 2026 |
FA945124CX005 SATELLITE AND DEBRIS DISCRIMINATION AND IDENTIFICATION | Department of Defense · Department of the Air Force | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $1.2M | Dec 21, 2023 – Apr 30, 2026 | Completed: Period of performance ended Apr 30, 2026 |
N6833525C0464 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $140K | Jul 9, 2025 – Jan 20, 2026 | Completed: Period of performance ended Jan 20, 2026 |
N6833519C0366 RESEARCH AND DEVELOPMENT | Department of Defense · Department of the Navy | 541715 · AD92R&D- DEFENSE OTHER: OTHER (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT) | $2M | Sep 4, 2019 – Sep 3, 2025 | Completed: Period of performance ended Sep 3, 2025 |
FA875024CB121 EVALUATING DATA STRATEGIES IN TRAINING AI SOLUTIONS FOR SPACE C2 TO DESIGN A DIGITAL TRAINING ENVIRONMENT FOR DATA-INFORMED COMPETITIVE… | Department of Defense · Department of the Air Force | 541715 · AC12NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH | $180K | Aug 19, 2024 – Apr 21, 2025 | Completed: Period of performance ended Apr 21, 2025 |
N6833524C0424 STTR PHASE I UNDER TOPIC N24A-T003. | Department of Defense · Department of the Navy | 541715 · AC11NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH | $140K | Jul 2, 2024 – Dec 30, 2024 | Completed: Period of performance ended Dec 30, 2024 |
FA865020C1145 ENGINEERING AND OPERATIONS FOR TURBULENCE AND AEROSOL RESEARCH (EOTAR) | Department of Defense · Department of the Air Force | 541715 · AC62R&D- DEFENSE SYSTEM: ELECTRONICS/COMMUNICATION EQUIPMENT (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT) | $409.8K | Sep 18, 2020 – Sep 29, 2024 | Completed: Period of performance ended Sep 29, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 56 awards
- Total awarded
- $23,196,315
- By phase
- SBIR Phase I: 26
- SBIR Phase II: 15
- STTR Phase I: 11
- STTR Phase II: 4
- By agency
- Department of Defense: 51
- National Aeronautics and Space Administration: 5
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2025: 2
- 2024: 2
- 2023: 2
- 2022: 4
- 2021: 2
- 2020: 2
- 2019: 4
- 2018: 4
- 2017: 5
- 2016: 3
- 2015: 3
- 2014: 2
- 2013: 3
- 2012: 4
- 2011: 2
- 2010: 1
- 2009: 1
- 2008: 1
- 2007: 3
- 2006: 1
- 2004: 1
- 2003: 2
- 2002: 1
- 2001: 1
Awards (most recent first)
Material System Design Tool to Enable Functionally Graded Materials
STTR Phase I · Department of Defense (Navy) · 2025 · $140,000
Jul 9, 2025 – Jan 20, 2026
Solicitation 25.A (2025) · Topic N25A-T004 · Research partner: Pennsylvania State University
Wide Field of View Lensing Spatially Variant Photonic Crystals
SBIR Phase II · Department of Defense (Air Force) · 2025 · $1,799,999
Oct 16, 2024 – Oct 10, 2026
- Direct to Phase II
Solicitation 24.2 (2024) · Topic AF242-D014
Evaluating Data Strategies in Training AI Solutions for Space C2
SBIR Phase I · Department of Defense (Air Force) · 2024 · $179,999
Aug 19, 2024 – Apr 21, 2025
Solicitation 24.1 (2024) · Topic SF241-0024
High-Frequency 40 GB/s MWIR and LWIR Metamaterials-based Electro-Optical Modulators for Free-Space Optical Communications
STTR Phase I · Department of Defense (Navy) · 2024 · $139,997
Jul 2, 2024 – Dec 30, 2024
Solicitation 24.A (2024) · Topic N24A-T003 · Research partner: University of Dayton Research Institute
Integrated Computations Materials Engineering (ICME) Modeling Tool for Optimum Gas Flow in Metal Additive Manufacturing Processes
STTR Phase II · Department of Defense (Navy) · 2023 · $1,099,999
May 3, 2023 – May 4, 2026
Solicitation 21.B (2021) · Topic N21B-T022 · Research partner: The Pennsylvania State University, Applied Research Laboratory
Hyperspectral, Wide Field of View of Spatially Variant Photonic Crystals
SBIR Phase I · Department of Defense (Air Force) · 2023 · $150,000
Dec 15, 2022 – Sep 15, 2023
Solicitation 22.2 (2022) · Topic AF222-0001
Satellite and Debris Discrimination and Identification
SBIR Phase I · Department of Defense (Air Force) · 2022 · $149,999
Sep 27, 2022 – Jun 23, 2023
Solicitation 22.1 (2022) · Topic AF221-0008
Turbine Engine Efficiency Improvements by Additive Manufacturing
SBIR Phase I · Department of Defense (Navy) · 2022 · $140,000
Jun 6, 2022 – Dec 6, 2022
Solicitation 22.1 (2022) · Topic N221-074
Machine Independent, Feature-Specific AM Parameters for Laser Powder Bed Fusion Additive Manufacturing to Enable DOD Ownership of Data to Produce High Quality, As-Built Material for Complex Geometry Structural Parts
SBIR Phase II · Department of Defense (Air Force) · 2022 · $1,262,869
Feb 15, 2022 – May 12, 2023
- Direct to Phase II
Solicitation X21.1 (2021) · Topic AF211-DCSO2
Advanced Persistent-Surveillance Sky Camera
SBIR Phase I · Department of Defense (Navy) · 2022 · $139,999
Oct 20, 2021 – Apr 20, 2022
Solicitation 21.2 (2021) · Topic N212-138
Integrated Computational Materials Engineering (ICME) Modeling Tool for Optimum Gas Flow in Metal Additive Manufacturing Processes
STTR Phase I · Department of Defense (Navy) · 2021 · $239,996
Sep 27, 2021 – Dec 6, 2022
Solicitation 21.B (2021) · Topic N21B-T022 · Research partner: The Pennsylvania State University, Applied Research Laboratory
Wire-Feed Additive Manufacturing Process Control Solution with Defect Detection, Identification and Correction
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,999
May 17, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic Z4
Tunable Bioinspired Spatially-varying Random Photonic Crystals
STTR Phase II · Department of Defense (Air Force) · 2020 · $750,000
Sep 9, 2020 – Dec 9, 2022
Solicitation 19.A (2019) · Topic AF19A-T017 · Research partner: UDRI
Tunable, Reconfigurable Metamaterials Using Liquid Crystal Medium
STTR Phase I · National Aeronautics and Space Administration · 2020 · $124,143
Aug 12, 2020 – Sep 30, 2021
Solicitation STTR_20_P1 (2020) · Topic T8 · Research partner: University of Dayton
Feed-Forward Controls for Laser Powder Bed Fusion Based Metal Additive Manufacturing
SBIR Phase II · Department of Defense (Navy) · 2019 · $2,000,000
Sep 4, 2019 – Sep 3, 2025
Solicitation 18.1 (2019) · Topic N181-085
Optimization of Sodium Guide Star Return using Polarization and/or Modulation Control
STTR Phase I · Department of Defense (Air Force) · 2019 · $150,000
Jun 30, 2019 – Jun 30, 2020
Solicitation 19.A (2019) · Topic AF19A-T008 · Research partner: Georgia State University
Rapid, Low Cost, High-quality Component Qualification Using Multi-scale, Multi-physics Analytical Toolset for the Optimization of Metal Additive Manuf
SBIR Phase II · Department of Defense (Navy) · 2019 · $1,000,000
Jun 18, 2019 – Nov 28, 2022
Solicitation 16.2 (2016) · Topic N162-083
Tunable bioinspired spatially-varying random photonic crystals
STTR Phase I · Department of Defense (Air Force) · 2019 · $150,000
May 30, 2019 – May 30, 2020
Solicitation 19.A (2019) · Topic AF19A-T017 · Research partner: University of Dayton
Extensible Modeling to Create Knowledgebase for AM Processing of Alloy GrCop-84
STTR Phase I · National Aeronautics and Space Administration · 2018 · $124,995
Jul 27, 2018 – Aug 26, 2019
Solicitation STTR_18_P1 (2018) · Topic T12 · Research partner: The University of Tennessee-Knoxville
Understanding Additive Manufacturing Solidification Profile Effects on Material Inhomogenieties, Defects, and Qualification
SBIR Phase II · Department of Defense (Navy) · 2018 · $1,000,000
Jul 3, 2018 – Oct 15, 2020
Solicitation 17.1 (2017) · Topic N171-090
SINGULAR OPTICS COMMUNICATIONS METHOD FOR DISADVANTAGED USERS
SBIR Phase I · Department of Defense (Air Force) · 2018 · $150,000
Jun 7, 2018 – Jun 7, 2019
Solicitation 2018.1 (2018) · Topic AF181-064
Feed-Forward Controls for Laser Powder Bed Fusion Based Metal Additive Manufacturing
SBIR Phase I · Department of Defense (Navy) · 2018 · $125,000
Apr 10, 2018 – Jul 25, 2019
Solicitation 18.1 (2018) · Topic N181-085
Additive Manufacturing Development of Naval Platform Heat Exchangers
SBIR Phase II · Department of Defense (Navy) · 2017 · $1,000,000
Sep 1, 2017 – May 29, 2020
Solicitation 16.1 (2016) · Topic N161-071
Understanding AM Solidification Profile Effects on Material Inhomogenieties, Defects, and Qualification
SBIR Phase I · Department of Defense (Navy) · 2017 · $224,999
Jun 1, 2017 – Dec 31, 2018
Solicitation 2017.1 (2017) · Topic N171-090
In Situ, Nondestructive Inspection During Additive Manufacturing of Metallic Parts
STTR Phase II · Department of Defense (Navy) · 2017 · $1,000,000
May 12, 2017 – Oct 31, 2019
Solicitation 15.A (2015) · Topic N15A-T008 · Research partner: The University of Tennessee Knoxville
Showing the 25 most recent of 56 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 541330Engineering Services
- 541511Custom Computer Programming ServicesSmall business under this code’s size standard
- 541690Other Scientific and Technical Consulting ServicesSmall business under this code’s size standard
SAM.gov reports this entity as small under 2 of 4 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with APPLIED OPTIMIZATION, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
