TECHNICAL DATA ANALYSIS, INC.
Doing business as TECHNICAL DATA ANALYSIS INC
- LEXINGTON PARK, MD 20653-2057
- tda-i.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $0
- Awards on record
- 0
- Contract vehicles
- 1On federal record
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
TECHNICAL DATA ANALYSIS, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About TECHNICAL DATA ANALYSIS, INC.
- Headquarters
- LEXINGTON PARK, MD 20653-2057
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIKCLCXA6CAD85
- CAGE1C7J0
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
No federal prime awards on record
Contract vehicles
From federal records
These seats come from federal records, the company’s own contract record on USAspending.gov or awarded labor rates in GSA CALC+, even though it has not listed them here.
- SeaPort-NxG (SeaPort Next Generation)
Contract N0017819D8659 · since Jan 2019
Last date to order on record: Jan 1, 2029
View record on USAspending.gov for contract N0017819D8659 (opens in a new tab)
Source: USAspending.gov IDV contract record · as of Nov 13, 2026
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 85 awards
- Total awarded
- $35,736,138
- By phase
- SBIR Phase I: 31
- SBIR Phase II: 28
- STTR Phase I: 16
- STTR Phase II: 10
- By agency
- Department of Defense: 84
- National Aeronautics and Space Administration: 1
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2024: 1
- 2023: 1
- 2022: 1
- 2021: 3
- 2020: 5
- 2019: 11
- 2018: 9
- 2017: 11
- 2016: 9
- 2015: 4
- 2014: 5
- 2013: 9
- 2012: 4
- 2011: 5
- 2010: 1
- 2009: 3
- 2008: 3
Awards (most recent first)
Novel Multiphysics Modeling of Electroplating Process for Metallic Aerospace Components
STTR Phase II · Department of Defense (Navy) · 2024 · $1,298,407
Dec 7, 2023 – Dec 19, 2025
Solicitation 22.A (2022) · Topic N22A-T003 · Research partner: University of Cincinnati
Predictive Model Based Control System for High-Speed Dynamic Airframe Testing
SBIR Phase II · Department of Defense (Navy) · 2023 · $899,880
Feb 9, 2023 – Feb 6, 2026
Solicitation 21.1 (2021) · Topic N211-014
Novel Multiphysics Modeling of Electroplating Process for Metallic Aerospace Components
STTR Phase I · Department of Defense (Navy) · 2022 · $239,918
Jul 7, 2022 – Sep 25, 2023
Solicitation 22.A (2022) · Topic N22A-T003 · Research partner: University of Cincinnati
Integrated Computational Materials Engineering (ICME) Modeling Tool for Optimum Gas Flow in Metal Additive Manufacturing Processes
STTR Phase I · Department of Defense (Navy) · 2021 · $139,922
Sep 27, 2021 – Apr 4, 2022
Solicitation 21.B (2021) · Topic N21B-T022 · Research partner: Carnegie Mellon University
Predictive Model Based Control System for High Speed Dynamic Airframe Testing
SBIR Phase I · Department of Defense (Navy) · 2021 · $239,937
Aug 4, 2021 – Jan 30, 2023
Solicitation 21.1 (2021) · Topic N211-014
Innovative Multi-scale/Multi-physics Model for Surface Finish Prediction and Optimization of Metal Additively Manufacture Parts
STTR Phase II · Department of Defense (Navy) · 2021 · $1,099,983
Jun 15, 2021 – Jun 28, 2024
Solicitation 19.B (2019) · Topic N19B-T034 · Research partner: University of Louisville
Machine Learning Tools to Optimize Metal Additive Manufacturing Process Parameters to Enhance Fatigue Performance of Aircraft Components
STTR Phase I · Department of Defense (Navy) · 2020 · $140,000
Apr 30, 2020 – Nov 2, 2020
Solicitation 20.A (2020) · Topic N20A-T002 · Research partner: Carnegie Mellon University
Systematic Fatigue Test Spectrum Editing Using Wavelet Transformations
STTR Phase II · Department of Defense (Navy) · 2020 · $999,920
Dec 30, 2019 – Jan 3, 2023
Solicitation 18.B (2018) · Topic N18B-T029 · Research partner: Arizona State University
Web-Based Application for Aircraft Component Fatigue Life Management
SBIR Phase II · Department of Defense (Navy) · 2020 · $999,946
Dec 17, 2019 – Nov 3, 2023
Solicitation 18.2 (2018) · Topic N182-100
Innovative Multi-scale/Multi-physics Model for Surface Finish Prediction and Optimization of Metal Additively Manufactured Parts
STTR Phase I · Department of Defense (Navy) · 2020 · $139,921
Oct 22, 2019 – Apr 23, 2020
Solicitation 19.B (2019) · Topic N19B-T034 · Research partner: University of Louisville
Tool for Analysis to Predict Strength and Durability of Curved and Tapered Composite Structures under Multiaxial Loading
SBIR Phase I · Department of Defense (Navy) · 2020 · $139,889
Oct 7, 2019 – Apr 9, 2020
Solicitation 19.2 (2019) · Topic N192-068
Predictor of Aircraft Structural Loads Due to Buffet
SBIR Phase I · Department of Defense (Navy) · 2019 · $139,909
Aug 20, 2019 – Feb 27, 2020
Solicitation 19.2 (2019) · Topic N192-058
P-8A IAT Fleet Metrics Functionality for Structural Life Management
SBIR Phase II · Department of Defense (Navy) · 2019 · $749,753
Aug 6, 2019 – Aug 5, 2021
Solicitation 08.1 (2008) · Topic N08-006
Rapid, Low Cost, High-quality Component Qualification Using Multi-scale, Multi-physics Analytical Toolset for the Optimization of Metal Additive Manuf
SBIR Phase II · Department of Defense (Navy) · 2019 · $499,971
Jun 18, 2019 – Nov 30, 2020
Solicitation 16.2 (2016) · Topic N162-083
Optimize Additive Manufacturing (AM) Post-Build Heat Treatment (HT) and Hot Iso-static Pressing (HIP) Processes for Fatigue Performance using an Integ
SBIR Phase II · Department of Defense (Navy) · 2019 · $299,959
May 2, 2019 – May 8, 2020
Solicitation 17.2 (2017) · Topic N172-106
Optimized Build Plate Design Tool for Metal Laser Powder Bed Additive Manufacturing
STTR Phase II · Department of Defense (Navy) · 2019 · $299,947
Apr 18, 2019 – Apr 16, 2020
Solicitation 17.B (2017) · Topic N17B-T033 · Research partner: The Board of Regents of the University of Wisconsin System
Prediction of Rotor Loads from Fuselage Sensors for Improved Structural Modeling and Fatigue Life Calculation
STTR Phase II · Department of Defense (Navy) · 2019 · $999,844
Mar 20, 2019 – Aug 22, 2022
Solicitation 17.A (2017) · Topic N17A-T009 · Research partner: University of Maryland
Combined Analytical and Experimental Approaches to Rotor and Dynamic Component Stress Predictions
SBIR Phase II · Department of Defense (Navy) · 2019 · $390,470
Feb 26, 2019 – Feb 18, 2022
Solicitation 08.1 (2008) · Topic N08-021
Modular Multi-Platform Rotor Hub Fatigue Test Rig
SBIR Phase II · Department of Defense (Navy) · 2019 · $499,968
Feb 6, 2019 – Jul 1, 2020
Solicitation 17.1 (2017) · Topic N171-016
Innovative Approach to Full Scale Fatigue Testing using Hybrid Methodologies
SBIR Phase II · Department of Defense (Navy) · 2019 · $499,987
Nov 1, 2018 – Nov 30, 2020
Solicitation 17.1 (2017) · Topic N171-027
Effect of Surface Finish and Post-Processing on the Fatigue Life of Additively Manufacturing Parts
SBIR Phase I · Department of Defense (Navy) · 2019 · $124,964
Oct 15, 2018 – Apr 18, 2019
Solicitation 18.2 (2018) · Topic N182-126
Efficient Prediction of Thermal Stresses and Distortion in Complex Optimized Missile Structures
SBIR Phase II · Department of Defense (Army) · 2019 · $999,727
Oct 11, 2018 – Mar 18, 2021
Solicitation 16.3 (2016) · Topic A16-104
Lattice Structure Optimization for Metallic and Composite Additive-Manufactured Missile Components
SBIR Phase I · Department of Defense (Navy) · 2018 · $124,990
Sep 12, 2018 – Mar 12, 2019
Solicitation 18.1 (2018) · Topic N181-094
Web-based Application for Aircraft Component Fatigue Life Management
SBIR Phase I · Department of Defense (Navy) · 2018 · $124,976
Sep 10, 2018 – Dec 24, 2019
Solicitation 18.2 (2018) · Topic N182-100
Systematic Fatigue Test Spectrum Editing Using Wavelet Transformations
STTR Phase I · Department of Defense (Navy) · 2018 · $124,916
Aug 31, 2018 – Dec 17, 2019
Solicitation 18.B (2018) · Topic N18B-T029 · Research partner: Arizona Board of Regents on behalf of Arizona State University
Showing the 25 most recent of 85 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541330Engineering ServicesPrimary
- 541690Other Scientific and Technical Consulting Services
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with TECHNICAL DATA ANALYSIS, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
