ASPEN CONSTRUCTION COMPANY
Doing business as ASPEN CONSTRUCTION CO OF MINNESOTA
- HACKENSACK, MN 56452-2287
- aspen-construction.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- HUBZone
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $59.7M
- Awards on record
- 36
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
ASPEN CONSTRUCTION COMPANY has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About ASPEN CONSTRUCTION COMPANY
- Headquarters
- HACKENSACK, MN 56452-2287
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIKF2JBQMCZJL9
- CAGE1M0L4
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $59.7M
- Awards on record
- 36
- Top funding agencies
- Department of the Army · Department of the Air Force · Federal Highway Administration
25 most recent of 36 awards
693C7325F00120N
Recompete < 6 mo: Potential end May 4, 2027 (5 months away)VA ST CP GNRL BTH THE PROJECT CONSISTS OF NEW INTERSECTION THAT CONNECTS GENERAL BOOTH BOULEVARD TO HEADQUARTERS ROAD. THE WORK INCLUDES…
Department of Transportation · Federal Highway Administration
- Obligated
- $4.8M
- Period of performance
- Sep 17, 2025 – May 4, 2027
FA480026F0022
Completed: Period of performance ended Aug 24, 2026THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR MAINTAINING BASE PAVED AREAS AND OTHER…
Department of Defense · Department of the Air Force
- Obligated
- $553.1K
- Period of performance
- Feb 27, 2026 – Aug 24, 2026
FA480026F0026
Completed: Period of performance ended Jul 14, 2026THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR MAINTAINING BASE PAVED AREAS ON THE…
Department of Defense · Department of the Air Force
- Obligated
- $269.4K
- Period of performance
- Mar 16, 2026 – Jul 14, 2026
FA480024F0224
Completed: Period of performance ended Apr 16, 2026PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $130.7K
- Period of performance
- Sep 23, 2024 – Apr 16, 2026
FA480025F0142
Completed: Period of performance ended Apr 2, 2026RENOVATE MURPHY FIELD TRACK
Department of Defense · Department of the Air Force
- Obligated
- $519.5K
- Period of performance
- Aug 8, 2025 – Apr 2, 2026
FA480025F0184
Completed: Period of performance ended Feb 27, 2026BASE-WIDE SIGN REPLACEMENT
Department of Defense · Department of the Air Force
- Obligated
- $664.4K
- Period of performance
- Sep 30, 2025 – Feb 27, 2026
W9123720C0007
Completed: Period of performance ended Feb 13, 2026TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY
Department of Defense · Department of the Army
- Obligated
- $34M
- Period of performance
- Aug 3, 2020 – Feb 13, 2026
FA480026F0010
Completed: Period of performance ended Feb 6, 2026PROJECT SNOW REMOVAL SUPPORT
Department of Defense · Department of the Air Force
- Obligated
- $32.4K
- Period of performance
- Jan 23, 2026 – Feb 6, 2026
693C7324F00006N
Completed: Period of performance ended Jan 26, 2026PROJECT NP NACE 300(1), 301(1): THE PROJECT CONSISTS OF RECONSTRUCTION OF MARSHALL HALL ACCESS ROAD AND MARSHALL HALL LOOP ROAD. THE WORK…
Department of Transportation · Federal Highway Administration
- Obligated
- $1.4M
- Period of performance
- Nov 13, 2023 – Jan 26, 2026
FA480025F0156
Completed: Period of performance ended Nov 19, 2025STUDY RUNWAY REFLECTIVITY AND FRICTION TEST, 633 CES, F. 7025
Department of Defense · Department of the Air Force
- Obligated
- $58.8K
- Period of performance
- Aug 20, 2025 – Nov 19, 2025
FA480025F0022
Completed: Period of performance ended Nov 11, 2025PROJECT NUMBER: MUHJ 25-6001 THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR…
Department of Defense · Department of the Air Force
- Obligated
- $399.7K
- Period of performance
- Jan 27, 2025 – Nov 11, 2025
FA480025F0123
Completed: Period of performance ended Aug 28, 2025PAVING PROJECT TO REPAIR PAVEMENT FAILURE ON TAXIWAY ALPHA
Department of Defense · Department of the Air Force
- Obligated
- $91.7K
- Period of performance
- Jul 8, 2025 – Aug 28, 2025
FA480025F0116
Completed: Period of performance ended Aug 28, 2025REMOVE THE EXISTING JOINT SEALANT AND PERFORM ASSOCIATED CONCRETE REPAIRS ON THE AIRCRAFT WASHDOWN TAXIWAY (BIRD BATH) AT JBLE-LANGLEY.
Department of Defense · Department of the Air Force
- Obligated
- $79K
- Period of performance
- Jun 17, 2025 – Aug 28, 2025
FA480025F0110
Completed: Period of performance ended Aug 8, 2025MAINTAIN STRIPE VFR AND ILS HOLD LINES, MULTI
Department of Defense · Department of the Air Force
- Obligated
- $88.7K
- Period of performance
- Jun 23, 2025 – Aug 8, 2025
W912QR23C0002
Completed: Period of performance ended Jul 25, 2025JOHNSON COUNTY PHASE II
Department of Defense · Department of the Army
- Obligated
- $12.1M
- Period of performance
- Nov 4, 2022 – Jul 25, 2025
FA480025F0009
Completed: Period of performance ended Jul 9, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $50.3K
- Period of performance
- Dec 3, 2024 – Jul 9, 2025
FA480024F0219
Completed: Period of performance ended Jun 24, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $16.2K
- Period of performance
- Sep 13, 2024 – Jun 24, 2025
FA480025F0083
Completed: Period of performance ended Jun 16, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $39.9K
- Period of performance
- May 2, 2025 – Jun 16, 2025
FA480024F0211
Completed: Period of performance ended May 19, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $221.7K
- Period of performance
- Sep 20, 2024 – May 19, 2025
W912PM24C0003
Completed: Period of performance ended May 8, 2025EROSION CONTROL MEASURES AT W. KERR SCOTT DAM AND RESERVOIR, WILKESBORO, NORTH CAROLINA.
Department of Defense · Department of the Army
- Obligated
- $1.1M
- Period of performance
- Jun 28, 2024 – May 8, 2025
FA480024F0269
Completed: Period of performance ended Apr 2, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $59.8K
- Period of performance
- Sep 30, 2024 – Apr 2, 2025
FA480025F0030
Completed: Period of performance ended Mar 28, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $5.4K
- Period of performance
- Feb 13, 2025 – Mar 28, 2025
FA480024F0268
Completed: Period of performance ended Feb 15, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $69.2K
- Period of performance
- Sep 30, 2024 – Feb 15, 2025
FA480024F0175
Completed: Period of performance ended Jan 19, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $170.9K
- Period of performance
- Sep 6, 2024 – Jan 19, 2025
FA480024F0192
Completed: Period of performance ended Jan 19, 2025PAVING PROJECT
Department of Defense · Department of the Air Force
- Obligated
- $28.9K
- Period of performance
- Sep 6, 2024 – Jan 19, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
693C7325F00120N under 693C7320D000002 VA ST CP GNRL BTH THE PROJECT CONSISTS OF NEW INTERSECTION THAT CONNECTS GENERAL BOOTH BOULEVARD TO HEADQUARTERS ROAD. THE WORK INCLUDES… | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $4.8M | Sep 17, 2025 – May 4, 2027 | Recompete < 6 mo: Potential end May 4, 2027 (5 months away)AI brief for award 693C7325F00120NBid team for the recompete of award 693C7325F00120N |
FA480026F0022 under FA480021D0001 THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR MAINTAINING BASE PAVED AREAS AND OTHER… | Department of Defense · Department of the Air Force | 237310 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $553.1K | Feb 27, 2026 – Aug 24, 2026 | Completed: Period of performance ended Aug 24, 2026 |
FA480026F0026 under FA480021D0001 THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR MAINTAINING BASE PAVED AREAS ON THE… | Department of Defense · Department of the Air Force | 237310 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $269.4K | Mar 16, 2026 – Jul 14, 2026 | Completed: Period of performance ended Jul 14, 2026 |
FA480024F0224 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2NZREPAIR OR ALTERATION OF OTHER UTILITIES | $130.7K | Sep 23, 2024 – Apr 16, 2026 | Completed: Period of performance ended Apr 16, 2026 |
FA480025F0142 under FA480021D0001 RENOVATE MURPHY FIELD TRACK | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $519.5K | Aug 8, 2025 – Apr 2, 2026 | Completed: Period of performance ended Apr 2, 2026 |
FA480025F0184 under FA480021D0001 BASE-WIDE SIGN REPLACEMENT | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $664.4K | Sep 30, 2025 – Feb 27, 2026 | Completed: Period of performance ended Feb 27, 2026 |
W9123720C0007 TOWN OF MARTIN PHASE II REDEVELOPMENT SITE, MARTIN, KY | Department of Defense · Department of the Army | 237990 · Y1QACONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $34M | Aug 3, 2020 – Feb 13, 2026 | Completed: Period of performance ended Feb 13, 2026 |
FA480026F0010 under FA480021D0001 PROJECT SNOW REMOVAL SUPPORT | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $32.4K | Jan 23, 2026 – Feb 6, 2026 | Completed: Period of performance ended Feb 6, 2026 |
693C7324F00006N under 693C7320D000002 PROJECT NP NACE 300(1), 301(1): THE PROJECT CONSISTS OF RECONSTRUCTION OF MARSHALL HALL ACCESS ROAD AND MARSHALL HALL LOOP ROAD. THE WORK… | Department of Transportation · Federal Highway Administration | 237310 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $1.4M | Nov 13, 2023 – Jan 26, 2026 | Completed: Period of performance ended Jan 26, 2026 |
FA480025F0156 under FA480021D0001 STUDY RUNWAY REFLECTIVITY AND FRICTION TEST, 633 CES, F. 7025 | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $58.8K | Aug 20, 2025 – Nov 19, 2025 | Completed: Period of performance ended Nov 19, 2025 |
FA480025F0022 under FA480021D0001 PROJECT NUMBER: MUHJ 25-6001 THE WORK UNDER THIS PROJECT CONSISTS OF PROVIDING ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY FOR… | Department of Defense · Department of the Air Force | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $399.7K | Jan 27, 2025 – Nov 11, 2025 | Completed: Period of performance ended Nov 11, 2025 |
FA480025F0123 under FA480021D0001 PAVING PROJECT TO REPAIR PAVEMENT FAILURE ON TAXIWAY ALPHA | Department of Defense · Department of the Air Force | 237310 · Z2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS | $91.7K | Jul 8, 2025 – Aug 28, 2025 | Completed: Period of performance ended Aug 28, 2025 |
FA480025F0116 under FA480021D0001 REMOVE THE EXISTING JOINT SEALANT AND PERFORM ASSOCIATED CONCRETE REPAIRS ON THE AIRCRAFT WASHDOWN TAXIWAY (BIRD BATH) AT JBLE-LANGLEY. | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $79K | Jun 17, 2025 – Aug 28, 2025 | Completed: Period of performance ended Aug 28, 2025 |
FA480025F0110 under FA480021D0001 MAINTAIN STRIPE VFR AND ILS HOLD LINES, MULTI | Department of Defense · Department of the Air Force | 237310 · Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS | $88.7K | Jun 23, 2025 – Aug 8, 2025 | Completed: Period of performance ended Aug 8, 2025 |
W912QR23C0002 JOHNSON COUNTY PHASE II | Department of Defense · Department of the Army | 237990 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $12.1M | Nov 4, 2022 – Jul 25, 2025 | Completed: Period of performance ended Jul 25, 2025 |
FA480025F0009 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $50.3K | Dec 3, 2024 – Jul 9, 2025 | Completed: Period of performance ended Jul 9, 2025 |
FA480024F0219 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z1BDMAINTENANCE OF AIRPORT RUNWAYS AND TAXIWAYS | $16.2K | Sep 13, 2024 – Jun 24, 2025 | Completed: Period of performance ended Jun 24, 2025 |
FA480025F0083 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $39.9K | May 2, 2025 – Jun 16, 2025 | Completed: Period of performance ended Jun 16, 2025 |
FA480024F0211 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2PAREPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING) | $221.7K | Sep 20, 2024 – May 19, 2025 | Completed: Period of performance ended May 19, 2025 |
W912PM24C0003 EROSION CONTROL MEASURES AT W. KERR SCOTT DAM AND RESERVOIR, WILKESBORO, NORTH CAROLINA. | Department of Defense · Department of the Army | 237990 · Y1QACONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) | $1.1M | Jun 28, 2024 – May 8, 2025 | Completed: Period of performance ended May 8, 2025 |
FA480024F0269 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $59.8K | Sep 30, 2024 – Apr 2, 2025 | Completed: Period of performance ended Apr 2, 2025 |
FA480025F0030 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $5.4K | Feb 13, 2025 – Mar 28, 2025 | Completed: Period of performance ended Mar 28, 2025 |
FA480024F0268 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $69.2K | Sep 30, 2024 – Feb 15, 2025 | Completed: Period of performance ended Feb 15, 2025 |
FA480024F0175 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Z2LZREPAIR OR ALTERATION OF PARKING FACILITIES | $170.9K | Sep 6, 2024 – Jan 19, 2025 | Completed: Period of performance ended Jan 19, 2025 |
FA480024F0192 under FA480021D0001 PAVING PROJECT | Department of Defense · Department of the Air Force | 237310 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $28.9K | Sep 6, 2024 – Jan 19, 2025 | Completed: Period of performance ended Jan 19, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 237310Highway, Street, and Bridge ConstructionPrimary
- 212321Title not in the curated list
- 213112Title not in the curated list
- 213113Title not in the curated list
- 221310Title not in the curated list
- 221320Title not in the curated list
- 236210Industrial Building Construction
- 236220Commercial and Institutional Building Construction
- 237110Water and Sewer Line and Related Structures Construction
- 237120Oil and Gas Pipeline and Related Structures Construction
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238140Title not in the curated list
- 238910Site Preparation Contractors
- 238990All Other Specialty Trade Contractors
- 321114Title not in the curated list
- 333120Title not in the curated list
- 532412Title not in the curated list
- 561730Landscaping Services
- 811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
SAM.gov does not report this entity as small under any listed NAICS code.
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with ASPEN CONSTRUCTION COMPANY?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
