MATTSON CONSTRUCTION CO
- MINOT, ND 58701-5503
- mattson.co (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $6.2M
- Awards on record
- 9
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
MATTSON CONSTRUCTION CO has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About MATTSON CONSTRUCTION CO
- Headquarters
- MINOT, ND 58701-5503
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIKGJLDUL5QU79
- CAGE6K670
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $6.2M
- Awards on record
- 9
- Top funding agencies
- Department of the Air Force
Awards
FA452825F0053
Completed: Period of performance ended Nov 13, 2026PROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER…
Department of Defense · Department of the Air Force
- Obligated
- $802.9K
- Period of performance
- Oct 7, 2025 – Nov 13, 2026
FA452826F0020
Completed: Period of performance ended Aug 29, 2026THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR THE B1119 ROOF.
Department of Defense · Department of the Air Force
- Obligated
- $1.5M
- Period of performance
- May 1, 2026 – Aug 29, 2026
FA452825F0059
Completed: Period of performance ended Aug 24, 2026THE EXISTING J-01 MMP ANTENNA CONDUIT AT MINOT AFB REQUIRES REPAIR TO MAINTAIN OPERATIONAL READINESS BY CLEANING, DEBURRING, AND LINING…
Department of Defense · Department of the Air Force
- Obligated
- $173.8K
- Period of performance
- Aug 29, 2025 – Aug 24, 2026
FA452825F0048
Completed: Period of performance ended Jul 31, 2026RENOVATE AREAS OF B546 TO COMPLY WITH NC3 REQUIREMENTS TO INCLUDE THE REMOVAL AND INSTALLATION OF PASS-THROUGH WINDOWS IN KCCC, AN ARMS…
Department of Defense · Department of the Air Force
- Obligated
- $245.4K
- Period of performance
- Oct 1, 2025 – Jul 31, 2026
FA452825F0012
Completed: Period of performance ended Dec 15, 2025PRECISION MEASUREMENT EQUIPMENT LABORATORY SIDING INSTALLATION
Department of Defense · Department of the Air Force
- Obligated
- $461.8K
- Period of performance
- Mar 24, 2025 – Dec 15, 2025
FA452824F0076
Completed: Period of performance ended Nov 24, 2025PROJECT INCLUDES GRADING, GRAVEL, AND STONE WORK AT LF SITES L-4, L-7, L-8, L-9, L-10, L-11, M-2, AND M-3 WITH THE OPTION OF ADDITIONAL…
Department of Defense · Department of the Air Force
- Obligated
- $853.7K
- Period of performance
- Nov 4, 2024 – Nov 24, 2025
FA452825F0002
Completed: Period of performance ended Nov 19, 2025RENOVATION OF DETACHMENT 22 BUILDING 770, MINOT AFB, ND. THE GENERAL RENOVATION PROJECT INCLUDES, BUT IS NOT LIMITED TO, CLASSROOM SPACES,…
Department of Defense · Department of the Air Force
- Obligated
- $1.3M
- Period of performance
- Nov 11, 2024 – Nov 19, 2025
FA452825F0015
Completed: Period of performance ended Oct 20, 2025PROJECT INVOLVES DECOMMISSIONING AND INSTALLING NEW CATHODIC PROTECTION DEEP WELL ANODE BED SAT BOTH MISSILE ALERT FACILITY (MAF) AND…
Department of Defense · Department of the Air Force
- Obligated
- $749.6K
- Period of performance
- Mar 24, 2025 – Oct 20, 2025
FA452824F0064
Completed: Period of performance ended Apr 4, 2025RENOVATE 5 MXG CONFERENCE ROOM INCLUDING SIDE ROOMS, AND PROJECTOR ROOM 126 AND 124 IN BUILDING 768 IAW THE ATTACHED SOW AND DRAWINGS.
Department of Defense · Department of the Air Force
- Obligated
- $91.7K
- Period of performance
- Aug 20, 2024 – Apr 4, 2025
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
FA452825F0053 under FA452820D0002 PROVIDE ALL PLANT, LABOR, EQUIPMENT, SUPERVISION, SERVICES, FUEL, AND MATERIALS NECESSARY TO REMOVE AND REPAIR THE EXISTING CENTER… | Department of Defense · Department of the Air Force | 236220 · Y1BFCONSTRUCTION OF MISSILE SYSTEM FACILITIES | $802.9K | Oct 7, 2025 – Nov 13, 2026 | Completed: Period of performance ended Nov 13, 2026 |
FA452826F0020 under FA452820D0002 THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR THE B1119 ROOF. | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $1.5M | May 1, 2026 – Aug 29, 2026 | Completed: Period of performance ended Aug 29, 2026 |
FA452825F0059 under FA452820D0002 THE EXISTING J-01 MMP ANTENNA CONDUIT AT MINOT AFB REQUIRES REPAIR TO MAINTAIN OPERATIONAL READINESS BY CLEANING, DEBURRING, AND LINING… | Department of Defense · Department of the Air Force | 236220 · Z1BFMAINTENANCE OF MISSILE SYSTEM FACILITIES | $173.8K | Aug 29, 2025 – Aug 24, 2026 | Completed: Period of performance ended Aug 24, 2026 |
FA452825F0048 under FA452820D0002 RENOVATE AREAS OF B546 TO COMPLY WITH NC3 REQUIREMENTS TO INCLUDE THE REMOVAL AND INSTALLATION OF PASS-THROUGH WINDOWS IN KCCC, AN ARMS… | Department of Defense · Department of the Air Force | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $245.4K | Oct 1, 2025 – Jul 31, 2026 | Completed: Period of performance ended Jul 31, 2026 |
FA452825F0012 under FA452820D0002 PRECISION MEASUREMENT EQUIPMENT LABORATORY SIDING INSTALLATION | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $461.8K | Mar 24, 2025 – Dec 15, 2025 | Completed: Period of performance ended Dec 15, 2025 |
FA452824F0076 under FA452820D0002 PROJECT INCLUDES GRADING, GRAVEL, AND STONE WORK AT LF SITES L-4, L-7, L-8, L-9, L-10, L-11, M-2, AND M-3 WITH THE OPTION OF ADDITIONAL… | Department of Defense · Department of the Air Force | 236220 · Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $853.7K | Nov 4, 2024 – Nov 24, 2025 | Completed: Period of performance ended Nov 24, 2025 |
FA452825F0002 under FA452820D0002 RENOVATION OF DETACHMENT 22 BUILDING 770, MINOT AFB, ND. THE GENERAL RENOVATION PROJECT INCLUDES, BUT IS NOT LIMITED TO, CLASSROOM SPACES,… | Department of Defense · Department of the Air Force | 236220 · Z2AZREPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $1.3M | Nov 11, 2024 – Nov 19, 2025 | Completed: Period of performance ended Nov 19, 2025 |
FA452825F0015 under FA452820D0002 PROJECT INVOLVES DECOMMISSIONING AND INSTALLING NEW CATHODIC PROTECTION DEEP WELL ANODE BED SAT BOTH MISSILE ALERT FACILITY (MAF) AND… | Department of Defense · Department of the Air Force | 236220 · Y1BFCONSTRUCTION OF MISSILE SYSTEM FACILITIES | $749.6K | Mar 24, 2025 – Oct 20, 2025 | Completed: Period of performance ended Oct 20, 2025 |
FA452824F0064 under FA452820D0002 RENOVATE 5 MXG CONFERENCE ROOM INCLUDING SIDE ROOMS, AND PROJECTOR ROOM 126 AND 124 IN BUILDING 768 IAW THE ATTACHED SOW AND DRAWINGS. | Department of Defense · Department of the Air Force | 236220 · Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | $91.7K | Aug 20, 2024 – Apr 4, 2025 | Completed: Period of performance ended Apr 4, 2025 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236210Industrial Building ConstructionPrimarySmall business under this code’s size standard
SAM.gov reports this entity as small under 1 of 1 NAICS code. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with MATTSON CONSTRUCTION CO?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
