GARCO CONSTRUCTION, INC.
- SPOKANE, WA 99202-4531
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $386.7M
- Awards on record
- 9
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
GARCO CONSTRUCTION, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About GARCO CONSTRUCTION, INC.
- Headquarters
- SPOKANE, WA 99202-4531
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIKHCKQ1ZWE6P4
- CAGE1HA49
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $386.7M
- Awards on record
- 9
- Top funding agencies
- Department of the Army · Department of the Navy · Bureau of Reclamation
Awards
W912DW24C0021
Recompete 6–12 mo: Potential end Sep 29, 2027 (10 months away)CONSTRUCT CONSOLIDATED TOTAL FORCE INTEGRATION (TFI) BASE OPERATIONS FACILITY, FAIRCHILD AIR FORCE BASE, SPOKANE, WA.
Department of Defense · Department of the Army
- Obligated
- $50.8M
- Period of performance
- Sep 30, 2024 – Sep 29, 2027
N4425524C6000
Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)MCON P2002 CONSTRUCTION OF TANK FARM IMPROVEMENTS, FLCPS MANCHESTER, MANCHESTER, WASHINGTON
Department of Defense · Department of the Navy
- Obligated
- $51.7M
- Period of performance
- Sep 6, 2024 – Jun 30, 2027
140R1023C0008
Recompete 6–12 mo: Potential end Jun 1, 2027 (6 months away)CLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON
Department of the Interior · Departmental Offices
- Obligated
- $61.2M
- Period of performance
- Sep 13, 2023 – Jun 1, 2027
W912QR24C0005
Completed: Period of performance ended May 9, 2026D/B/B YAKIMA EQUIPMENT CONCENTRATION SITE WAREHOUSE
Department of Defense · Department of the Army
- Obligated
- $20M
- Period of performance
- Feb 28, 2024 – May 9, 2026
140R1018C0025
Completed: Period of performance ended Mar 9, 2026IGF::OT::IGF CEFP INTAKE, GATE&HELIX PROJECT, YAKIMA RIVER BASIN ENHANCEMENT PROJECT, INTEGRATED YAKIMA PROJECT, WASHINGTON
Department of the Interior · Bureau of Reclamation
- Obligated
- $88.4M
- Period of performance
- Sep 19, 2018 – Mar 9, 2026
W912DW21C0007
Completed: Period of performance ended Jul 31, 2025FUEL HYDRANT REPAIR SERVICES, FAIRCHILD, WA
Department of Defense · Department of the Army
- Obligated
- $34.2M
- Period of performance
- Feb 25, 2021 – Jul 31, 2025
W912QR21C0019
Completed: Period of performance ended Apr 22, 2025WPAFB DLA FUEL HYDRANT SYSTEM REPLACEMENT - BASE AND ALL OPTIONS ARE ACCEPTED. AT THIS TIME, THE BASE AND OPTIONS 4 AND 5 BEING FUNDED.
Department of Defense · Department of the Army
- Obligated
- $20.6M
- Period of performance
- Apr 26, 2021 – Apr 22, 2025
N4425521C1006
Completed: Period of performance ended Jul 12, 2024CONSTRUCTION OF P856 MANCHESTER TANK FARM IMPROVEMENTS, MANCHESTER, WA
Department of Defense · Department of the Navy
- Obligated
- $56.7M
- Period of performance
- May 25, 2021 – Jul 12, 2024
W912DW23C0021
Completed: Period of performance ended May 7, 2024CJD PH PASSENGER AND FREIGHT ELEVATOR REPLACEMENT.
Department of Defense · Department of the Army
- Obligated
- $3.1M
- Period of performance
- Oct 1, 2023 – May 7, 2024
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
W912DW24C0021 CONSTRUCT CONSOLIDATED TOTAL FORCE INTEGRATION (TFI) BASE OPERATIONS FACILITY, FAIRCHILD AIR FORCE BASE, SPOKANE, WA. | Department of Defense · Department of the Army | 236220 · Y1AZCONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $50.8M | Sep 30, 2024 – Sep 29, 2027 | Recompete 6–12 mo: Potential end Sep 29, 2027 (10 months away)AI brief for award W912DW24C0021Bid team for the recompete of award W912DW24C0021 |
N4425524C6000 MCON P2002 CONSTRUCTION OF TANK FARM IMPROVEMENTS, FLCPS MANCHESTER, MANCHESTER, WASHINGTON | Department of Defense · Department of the Navy | 237120 · Y1NACONSTRUCTION OF FUEL SUPPLY FACILITIES | $51.7M | Sep 6, 2024 – Jun 30, 2027 | Recompete 6–12 mo: Potential end Jun 30, 2027 (7 months away)AI brief for award N4425524C6000Bid team for the recompete of award N4425524C6000 |
140R1023C0008 CLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON | Department of the Interior · Departmental Offices | 237990 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $61.2M | Sep 13, 2023 – Jun 1, 2027 | Recompete 6–12 mo: Potential end Jun 1, 2027 (6 months away)AI brief for award 140R1023C0008Bid team for the recompete of award 140R1023C0008 |
W912QR24C0005 D/B/B YAKIMA EQUIPMENT CONCENTRATION SITE WAREHOUSE | Department of Defense · Department of the Army | 236220 · M1JZOPERATION OF MISCELLANEOUS BUILDINGS | $20M | Feb 28, 2024 – May 9, 2026 | Completed: Period of performance ended May 9, 2026 |
140R1018C0025 IGF::OT::IGF CEFP INTAKE, GATE&HELIX PROJECT, YAKIMA RIVER BASIN ENHANCEMENT PROJECT, INTEGRATED YAKIMA PROJECT, WASHINGTON | Department of the Interior · Bureau of Reclamation | 237990 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $88.4M | Sep 19, 2018 – Mar 9, 2026 | Completed: Period of performance ended Mar 9, 2026 |
W912DW21C0007 FUEL HYDRANT REPAIR SERVICES, FAIRCHILD, WA | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $34.2M | Feb 25, 2021 – Jul 31, 2025 | Completed: Period of performance ended Jul 31, 2025 |
W912QR21C0019 WPAFB DLA FUEL HYDRANT SYSTEM REPLACEMENT - BASE AND ALL OPTIONS ARE ACCEPTED. AT THIS TIME, THE BASE AND OPTIONS 4 AND 5 BEING FUNDED. | Department of Defense · Department of the Army | 237120 · Z2NAREPAIR OR ALTERATION OF FUEL SUPPLY FACILITIES | $20.6M | Apr 26, 2021 – Apr 22, 2025 | Completed: Period of performance ended Apr 22, 2025 |
N4425521C1006 CONSTRUCTION OF P856 MANCHESTER TANK FARM IMPROVEMENTS, MANCHESTER, WA | Department of Defense · Department of the Navy | 237120 · C1GCARCHITECT AND ENGINEERING- CONSTRUCTION: FUEL STORAGE BUILDINGS | $56.7M | May 25, 2021 – Jul 12, 2024 | Completed: Period of performance ended Jul 12, 2024 |
W912DW23C0021 CJD PH PASSENGER AND FREIGHT ELEVATOR REPLACEMENT. | Department of Defense · Department of the Army | 333921 · Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $3.1M | Oct 1, 2023 – May 7, 2024 | Completed: Period of performance ended May 7, 2024 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- MISSION SUPPORT & TEST SERVICES LLC
UEI YSYZHPCG4XB3
$2.6M
Subcontractor to this prime · 1 sub-award · latest Sep 15, 2026
- Department of Energy
- “SEPT 2026 $946,500.00 MAY 2026 $1,700,00 BUILDING PROGRAM TILT-UP CONSTRUCTION AGREEMENT”
Subcontractors it has used
No reported sub-awards as a prime contractor.
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimary
- 236210Industrial Building Construction
- 237110Water and Sewer Line and Related Structures Construction
- 237120Oil and Gas Pipeline and Related Structures Construction
- 237310Highway, Street, and Bridge Construction
- 237990Other Heavy and Civil Engineering Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238120Structural Steel and Precast Concrete Contractors
- 238170Title not in the curated list
- 238190Other Foundation, Structure, and Building Exterior Contractors
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
- Y1AACONSTRUCTION OF OFFICE BUILDINGS
- Y1ABCONSTRUCTION OF CONFERENCE SPACE AND FACILITIES
- Y1AZCONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Y1BDCONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
- Y1BECONSTRUCTION OF AIRPORT TERMINALS
- Y1BFCONSTRUCTION OF MISSILE SYSTEM FACILITIES
- Y1BGCONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES
- Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES
- Y1CACONSTRUCTION OF SCHOOLS
- Y1CZCONSTRUCTION OF OTHER EDUCATIONAL BUILDINGS
- Y1EACONSTRUCTION OF AMMUNITION FACILITIES
- Y1EBCONSTRUCTION OF MAINTENANCE BUILDINGS
- Y1ECCONSTRUCTION OF PRODUCTION BUILDINGS
- Y1EECONSTRUCTION OF TANK AUTOMOTIVE FACILITIES
- Y1EZCONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
- Y1FACONSTRUCTION OF FAMILY HOUSING FACILITIES
- Y1FBCONSTRUCTION OF RECREATIONAL BUILDINGS
- Y1FCCONSTRUCTION OF TROOP HOUSING FACILITIES
- Y1FDCONSTRUCTION OF DINING FACILITIES
- Y1FECONSTRUCTION OF RELIGIOUS FACILITIES
- Y1FFCONSTRUCTION OF PENAL FACILITIES
- Y1GACONSTRUCTION OF AMMUNITION STORAGE BUILDINGS
- Y1GCCONSTRUCTION OF FUEL STORAGE BUILDINGS
- Y1GDCONSTRUCTION OF OPEN STORAGE FACILITIES
- Y1GZCONSTRUCTION OF OTHER WAREHOUSE BUILDINGS
- Y1JACONSTRUCTION OF MUSEUMS AND EXHIBITION BUILDINGS
- Y1JBCONSTRUCTION OF TESTING AND MEASUREMENT BUILDINGS
- Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS
- Y1KACONSTRUCTION OF DAMS
- Y1KBCONSTRUCTION OF CANALS
- Y1KFCONSTRUCTION OF DREDGING FACILITIES
- Y1KZCONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- Y1LACONSTRUCTION OF AIRPORT SERVICE ROADS
- Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Y1LZCONSTRUCTION OF PARKING FACILITIES
- Y1NACONSTRUCTION OF FUEL SUPPLY FACILITIES
- Y1NDCONSTRUCTION OF SEWAGE AND WASTE FACILITIES
- Y1NECONSTRUCTION OF WATER SUPPLY FACILITIES
- Y1PACONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with GARCO CONSTRUCTION, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
