BILLY W. JARRETT CONSTRUCTION COMPANY, INC.
Doing business as JARRETT CONSTRUCTION
- PRATTVILLE, AL 36067-3344
- jarrett-inc.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
- Veteran-Owned Small Business
- Service-Disabled Veteran-Owned Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $145.2M
- Awards on record
- 18
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
BILLY W. JARRETT CONSTRUCTION COMPANY, INC. has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About BILLY W. JARRETT CONSTRUCTION COMPANY, INC.
- Headquarters
- PRATTVILLE, AL 36067-3344
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIKMDWJNDKQ6H6
- CAGE1RAY4
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
- 36-month obligations
- $145.2M
- Awards on record
- 18
- Top funding agencies
- Department of Veterans Affairs · Department of the Army
Awards
36C25726C0058
Recompete 12–18 mo: Potential end Nov 29, 2027 (12 months away)EO 14398- IMPROVE ROADS AND ENTRANCES, CENTRAL TX HCS. PROJECT #674-20-109
Department of Veterans Affairs
- Obligated
- $17.7M
- Period of performance
- Jun 11, 2026 – Nov 29, 2027
36C26326C0055
Recompete 6–12 mo: Potential end Jul 15, 2027 (8 months away)636-26-305 CORRECT PARKING GARAGE SAFETY DEFICIENCIES - DESIGN/BUILD
Department of Veterans Affairs
- Obligated
- $3.7M
- Period of performance
- Aug 25, 2026 – Jul 15, 2027
36C24125C0060
Recompete 6–12 mo: Potential end May 24, 2027 (6 months away)CONSTRUCTION OF A NEW ELECTRICAL SUBSTATION.
Department of Veterans Affairs
- Obligated
- $15.3M
- Period of performance
- Aug 1, 2025 – May 24, 2027
W912HP25FA184
Recompete < 6 mo: Potential end May 5, 2027 (5 months away)THIS IS A DESIGN BUILD PROJECT FOR WHOLE CENTER REPAIRS AND RENOVATIONS. FURNISH ALL LABOR, MATERIAL, EQUIPMENT, INCIDENTALS, SUPERVISION…
Department of Defense · Department of the Army
- Obligated
- $2.6M
- Period of performance
- Sep 24, 2025 – May 5, 2027
36C77625C0007
Recompete < 6 mo: Potential end Jan 21, 2027 (2 months away)COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES, AND FURNISH LABOR AND MATERIALS…
Department of Veterans Affairs
- Obligated
- $22.1M
- Period of performance
- Jun 12, 2025 – Jan 21, 2027
36C77626N0110
Completed: Period of performance ended Jun 30, 2026VISN 1 CONSTRUCTION IDIQ MATOC
Department of Veterans Affairs
- Obligated
- $1K
- Period of performance
- Dec 16, 2025 – Jun 30, 2026
W912HP24F6029
Completed: Period of performance ended May 19, 2026CONSTRUCTION SERVICES DDRT LOT 29 STORAGE SHED
Department of Defense · Department of the Army
- Obligated
- $2.7M
- Period of performance
- Sep 30, 2024 – May 19, 2026
36C77623C0070
Completed: Period of performance ended Apr 3, 2026MINOR CONSTRUCTION PROJECT AT PROVIDENCE VAMC - MENTAL HEALTH
Department of Veterans Affairs
- Obligated
- $15.6M
- Period of performance
- Aug 11, 2023 – Apr 3, 2026
36C24125N0757
Completed: Period of performance ended Jan 31, 2026VISN 1 CONSTRUCTION MATOC FOR ALL HEALTHCARE FACILITIES WITHIN THE VISN 1 NEW ENGLAND HEALTHCARE SYSTEM-MOD TO ALIGN THE POP WITH THE NTP.
Department of Veterans Affairs
- Obligated
- $736.4K
- Period of performance
- Apr 9, 2025 – Jan 31, 2026
36C77624C0064
Completed: Period of performance ended Nov 10, 2025CONTRACTOR SHALL COMPLETELY PREPARE SITE AS NECESSARY FOR SITE IMPROVEMENTS OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING…
Department of Veterans Affairs
- Obligated
- $11.7M
- Period of performance
- Apr 1, 2024 – Nov 10, 2025
36C24125N0520
Completed: Period of performance ended Oct 18, 2025IDIQ TASK ORDER FOR DOOR ACCESSIBILITY UPGRADES AT BEDFORD VAMC, MA
Department of Veterans Affairs
- Obligated
- $175.8K
- Period of performance
- Mar 18, 2025 – Oct 18, 2025
36C24124N1255
Completed: Period of performance ended Sep 9, 2025VISN 1 CONSTRUCTION MATOC MINIMUM GUARANTEE
Department of Veterans Affairs
- Obligated
- $2K
- Period of performance
- Sep 10, 2024 – Sep 9, 2025
36C77623C0037
Completed: Period of performance ended Jul 18, 2025WEST HAVEN VAMC PARKING GARAGE CONSTRUCTION
Department of Veterans Affairs
- Obligated
- $16.7M
- Period of performance
- Mar 23, 2023 – Jul 18, 2025
36C25721C0079
Completed: Period of performance ended May 30, 2024DESIGN BUILD PARKING STRUCTURE
Department of Veterans Affairs
- Obligated
- $13.8M
- Period of performance
- Dec 8, 2021 – May 30, 2024
36C24820N0244
Completed: Period of performance ended Apr 30, 2024IGF: CT: IGF
Department of Veterans Affairs
- Obligated
- $7.6M
- Period of performance
- Dec 13, 2019 – Apr 30, 2024
36C24718N2122
Completed: Period of performance ended Mar 20, 2024EO14042 - MINIMUM ORDER GUARANTEE FOR VISN 7 MATOC
Department of Veterans Affairs
- Obligated
- $1K
- Period of performance
- Sep 20, 2018 – Mar 20, 2024
36C25520C0072
Completed: Period of performance ended Dec 15, 2023657-036 -NEW INPATIENT PARKING GARAGE UTILIZING DESIGN/BUILD SERVICES AT THE ST. LOUIS VA MEDICAL CENTER JOHN COCHRAN DIVISION
Department of Veterans Affairs
- Obligated
- $14.8M
- Period of performance
- Sep 15, 2020 – Dec 15, 2023
36E77620C0037
Completed: Period of performance ended Aug 31, 2022NEW MENTAL HEALTH BUILDING CONSTRUCTION AT THE PROVIDENCE VAMC
Department of Veterans Affairs
- Obligated
- $14.1M
- Period of performance
- May 11, 2020 – Aug 31, 2022
| Award | Agency | NAICS · PSC | Obligated | Period of performance | Recompete |
|---|---|---|---|---|---|
36C25726C0058 EO 14398- IMPROVE ROADS AND ENTRANCES, CENTRAL TX HCS. PROJECT #674-20-109 | Department of Veterans Affairs | 237310 · Z2LBREPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS | $17.7M | Jun 11, 2026 – Nov 29, 2027 | Recompete 12–18 mo: Potential end Nov 29, 2027 (12 months away)AI brief for award 36C25726C0058Bid team for the recompete of award 36C25726C0058 |
36C26326C0055 636-26-305 CORRECT PARKING GARAGE SAFETY DEFICIENCIES - DESIGN/BUILD | Department of Veterans Affairs | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $3.7M | Aug 25, 2026 – Jul 15, 2027 | Recompete 6–12 mo: Potential end Jul 15, 2027 (8 months away)AI brief for award 36C26326C0055Bid team for the recompete of award 36C26326C0055 |
36C24125C0060 CONSTRUCTION OF A NEW ELECTRICAL SUBSTATION. | Department of Veterans Affairs | 237130 · Y1NZCONSTRUCTION OF OTHER UTILITIES | $15.3M | Aug 1, 2025 – May 24, 2027 | Recompete 6–12 mo: Potential end May 24, 2027 (6 months away)AI brief for award 36C24125C0060Bid team for the recompete of award 36C24125C0060 |
W912HP25FA184 under W912HP23D4002 THIS IS A DESIGN BUILD PROJECT FOR WHOLE CENTER REPAIRS AND RENOVATIONS. FURNISH ALL LABOR, MATERIAL, EQUIPMENT, INCIDENTALS, SUPERVISION… | Department of Defense · Department of the Army | 236220 · Y1EBCONSTRUCTION OF MAINTENANCE BUILDINGS | $2.6M | Sep 24, 2025 – May 5, 2027 | Recompete < 6 mo: Potential end May 5, 2027 (5 months away)AI brief for award W912HP25FA184Bid team for the recompete of award W912HP25FA184 |
36C77625C0007 COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES, AND FURNISH LABOR AND MATERIALS… | Department of Veterans Affairs | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $22.1M | Jun 12, 2025 – Jan 21, 2027 | Recompete < 6 mo: Potential end Jan 21, 2027 (2 months away)AI brief for award 36C77625C0007Bid team for the recompete of award 36C77625C0007 |
36C77626N0110 under 36C77626D0001 VISN 1 CONSTRUCTION IDIQ MATOC | Department of Veterans Affairs | 236220 · Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1K | Dec 16, 2025 – Jun 30, 2026 | Completed: Period of performance ended Jun 30, 2026 |
W912HP24F6029 under W912HP23D4002 CONSTRUCTION SERVICES DDRT LOT 29 STORAGE SHED | Department of Defense · Department of the Army | 236220 · Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | $2.7M | Sep 30, 2024 – May 19, 2026 | Completed: Period of performance ended May 19, 2026 |
36C77623C0070 MINOR CONSTRUCTION PROJECT AT PROVIDENCE VAMC - MENTAL HEALTH | Department of Veterans Affairs | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $15.6M | Aug 11, 2023 – Apr 3, 2026 | Completed: Period of performance ended Apr 3, 2026 |
36C24125N0757 under 36C24124D0100 VISN 1 CONSTRUCTION MATOC FOR ALL HEALTHCARE FACILITIES WITHIN THE VISN 1 NEW ENGLAND HEALTHCARE SYSTEM-MOD TO ALIGN THE POP WITH THE NTP. | Department of Veterans Affairs | 236220 · Z1DAMAINTENANCE OF HOSPITALS AND INFIRMARIES | $736.4K | Apr 9, 2025 – Jan 31, 2026 | Completed: Period of performance ended Jan 31, 2026 |
36C77624C0064 CONTRACTOR SHALL COMPLETELY PREPARE SITE AS NECESSARY FOR SITE IMPROVEMENTS OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING… | Department of Veterans Affairs | 236220 · Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES | $11.7M | Apr 1, 2024 – Nov 10, 2025 | Completed: Period of performance ended Nov 10, 2025 |
36C24125N0520 under 36C24124D0100 IDIQ TASK ORDER FOR DOOR ACCESSIBILITY UPGRADES AT BEDFORD VAMC, MA | Department of Veterans Affairs | 236220 · Z1DAMAINTENANCE OF HOSPITALS AND INFIRMARIES | $175.8K | Mar 18, 2025 – Oct 18, 2025 | Completed: Period of performance ended Oct 18, 2025 |
36C24124N1255 under 36C24124D0100 VISN 1 CONSTRUCTION MATOC MINIMUM GUARANTEE | Department of Veterans Affairs | 236220 · Z2DAREPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $2K | Sep 10, 2024 – Sep 9, 2025 | Completed: Period of performance ended Sep 9, 2025 |
36C77623C0037 WEST HAVEN VAMC PARKING GARAGE CONSTRUCTION | Department of Veterans Affairs | 236220 · Y1DZCONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $16.7M | Mar 23, 2023 – Jul 18, 2025 | Completed: Period of performance ended Jul 18, 2025 |
36C25721C0079 DESIGN BUILD PARKING STRUCTURE | Department of Veterans Affairs | 236220 · Y1LZCONSTRUCTION OF PARKING FACILITIES | $13.8M | Dec 8, 2021 – May 30, 2024 | Completed: Period of performance ended May 30, 2024 |
36C24820N0244 under 36C24818D0097 IGF: CT: IGF | Department of Veterans Affairs | 236220 · Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES | $7.6M | Dec 13, 2019 – Apr 30, 2024 | Completed: Period of performance ended Apr 30, 2024 |
36C24718N2122 under 36C24718D0150 EO14042 - MINIMUM ORDER GUARANTEE FOR VISN 7 MATOC | Department of Veterans Affairs | 236220 · Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1K | Sep 20, 2018 – Mar 20, 2024 | Completed: Period of performance ended Mar 20, 2024 |
36C25520C0072 657-036 -NEW INPATIENT PARKING GARAGE UTILIZING DESIGN/BUILD SERVICES AT THE ST. LOUIS VA MEDICAL CENTER JOHN COCHRAN DIVISION | Department of Veterans Affairs | 236220 · Y1LZCONSTRUCTION OF PARKING FACILITIES | $14.8M | Sep 15, 2020 – Dec 15, 2023 | Completed: Period of performance ended Dec 15, 2023 |
36E77620C0037 NEW MENTAL HEALTH BUILDING CONSTRUCTION AT THE PROVIDENCE VAMC | Department of Veterans Affairs | 236220 · Y1DACONSTRUCTION OF HOSPITALS AND INFIRMARIES | $14.1M | May 11, 2020 – Aug 31, 2022 | Completed: Period of performance ended Aug 31, 2022 |
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
No SBIR/STTR awards on record
Source: SBIR.gov award records (opens in a new tab) · sync date not recorded
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
No active exclusion on record (checked Nov 14, 2026).
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · as of Nov 14, 2026
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 14, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 14, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 236220Commercial and Institutional Building ConstructionPrimarySmall business under this code’s size standard
- 236115Title not in the curated listSmall business under this code’s size standard
- 236116New Multifamily Housing Construction (except For-Sale Builders)Small business under this code’s size standard
- 236117Title not in the curated listSmall business under this code’s size standard
- 236118Residential RemodelersSmall business under this code’s size standard
- 236210Industrial Building ConstructionSmall business under this code’s size standard
- 237110Water and Sewer Line and Related Structures ConstructionSmall business under this code’s size standard
- 237120Oil and Gas Pipeline and Related Structures ConstructionSmall business under this code’s size standard
- 237130Power and Communication Line and Related Structures ConstructionSmall business under this code’s size standard
- 237210Title not in the curated listSmall business under this code’s size standard
- 237310Highway, Street, and Bridge ConstructionSmall business under this code’s size standard
- 237990Other Heavy and Civil Engineering Construction
- 561210Facilities Support ServicesSmall business under this code’s size standard
SAM.gov reports this entity as small under 12 of 13 NAICS codes. Size is determined per code (SBA size standards).
Socio-economic status
- Small Business
- Veteran-Owned Small Business· self-represented
- Service-Disabled Veteran-Owned Small Business· self-represented
Self-represented in SAM.gov. WOSB and EDWOSB set-asides need SBA certification (13 CFR 127.300); SDVOSB and VOSB need SBA VetCert (13 CFR part 128). Confirm current certification before relying on it.
Learn more about small business set-asidesProduct & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with BILLY W. JARRETT CONSTRUCTION COMPANY, INC.?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
