
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
ASTRA SPACE OPERATIONS, LLC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
No federal prime awards on record
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov reports this entity as small under 3 of 4 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Awards (most recent first)
Electric Pump Fed Propulsion for a Liquid Bipropellant Mars Ascent Vehicle
SBIR Phase I · National Aeronautics and Space Administration · 2016 · $124,586
Jun 10, 2016 – Dec 9, 2016
Solicitation year 2016 · Topic S4.03
Small-Scale, Methane-Fueled Reaction Control Engines for In-Space Propulsion
SBIR Phase I · National Aeronautics and Space Administration · 2015 · $124,909
Jun 17, 2015 – Dec 17, 2015
Solicitation year 2015 · Topic H2.01
High-Performance, Pump-Fed Propulsion for Mars Ascent Vehicle Applications
SBIR Phase I · National Aeronautics and Space Administration · 2015 · $124,746
Jun 17, 2015 – Dec 17, 2015
Solicitation year 2015 · Topic S4.03
On-Board Pressurization Systems for Sample Return Missions
SBIR Phase I · National Aeronautics and Space Administration · 2014 · $124,931
Jun 20, 2014 – Dec 19, 2014
Solicitation year 2014 · Topic S4.03 · Research partner: Stub
Low-Cost and High-Performance Propulsion for Small Satellite Applications
SBIR Phase I · National Aeronautics and Space Administration · 2014 · $124,552
Jun 20, 2014 – Dec 19, 2014
Solicitation year 2014 · Topic S3.02 · Research partner: Stub
A high performance, electric pump-fed LOX / RP propulsion system
SBIR Phase II · National Aeronautics and Space Administration · 2014 · $1,214,516
Apr 17, 2014 – Mar 31, 2016
Solicitation year 2012 · Topic E1.02 · Research partner: Stub
Regeneratively-Cooled, Pump-Fed Propulsion Technology for Nano / Micro Satellite Launch Vehicles
SBIR Phase I · National Aeronautics and Space Administration · 2013 · $199,477
May 23, 2013 – Nov 23, 2013
Solicitation year 2012 · Topic E1.02 · Research partner: Stub
A LOX-Cooled, Pump-Fed Rocket Engine for Sample Return Applications
SBIR Phase I · National Aeronautics and Space Administration · 2012 · $124,481
Feb 13, 2012 – Aug 13, 2012
Solicitation year 2011 · Topic S5.04 · Research partner: Stub
A High-Payload Fraction, Pump-Fed, 2-Stage Nano Launch Vehicle
SBIR Phase I · National Aeronautics and Space Administration · 2012 · $124,550
Feb 13, 2012 – Aug 13, 2012
Solicitation year 2011 · Topic O2.01 · Research partner: Stub
High-Performance, Pump-Fed Propulsion for Missile Defense Interceptors
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2012 · $99,873
Started Feb 1, 2012
Solicitation 2011.2 (2011) · Topic MDA11-025 · Research partner: Stub
Regeneratively-Cooled, Turbopump-Fed, Small-Scale Cryogenic Rocket Engines
SBIR Phase II · National Aeronautics and Space Administration · 2011 · $599,679
Jun 1, 2011 – May 31, 2013
Solicitation year 2009 · Topic X10.01 · Research partner: Stub
Low-Cost and Light-Weight Transpiration-Cooled Thrust Chambers
SBIR Phase I · National Aeronautics and Space Administration · 2011 · $99,437
Feb 18, 2011 – Sep 29, 2011
Solicitation year 2010 · Topic S3.04 · Research partner: Stub
High Performance Micro Rocket Stages for Tactical & Space Applications
SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2010 · $2,882,950
Aug 25, 2010 – Aug 31, 2012
Solicitation 2009.1 (2009) · Topic SB091-013
Regeneratively-Cooled, Turbopump-Fed, LOX/Methane Lunar Ascent Engines
SBIR Phase I · National Aeronautics and Space Administration · 2010 · $99,186
Jan 29, 2010 – Jul 29, 2010
Solicitation year 2009 · Topic X10.01
Small, Light-Weight Pump Technology for On-Board Pressurization of Propellants in a Mars Ascent Vehicle
SBIR Phase II · National Aeronautics and Space Administration · 2010 · $598,832
Dec 28, 2009 – Dec 27, 2011
Solicitation year 2008 · Topic S5.04
High Performance Micro Rocket Stages for Tactical & Space Applications
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2009 · $98,666
Aug 12, 2009 – Apr 10, 2010
Solicitation 2009.1 (2009) · Topic SB091-013
A High T/W, Low TSFC Propulsion System for PAV Applications
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2009 · $98,584
Jul 1, 2009 – Oct 26, 2010
Solicitation 2009.1 (2009) · Topic SB091-014
Small, Light-Weight Pump Technologies for Mars Ascent Vehicles
SBIR Phase I · National Aeronautics and Space Administration · 2009 · $99,729
Jan 22, 2009 – Jul 22, 2009
Solicitation year 2008 · Topic S5.04
Silicon-Based Chemical Micro-Thrusters for Nano and Pico Satellite Applications
STTR Phase I · Department of Defense (Air Force) · 2008 · $99,849
Oct 11, 2007 – Jul 11, 2008
Solicitation year 2007 · Topic AF07-T008 · Research partner: MIT
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 12, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 12, 2026