NLIGHT INC
- CAMAS, WA 98607-9406
- nlight.net (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $0
- Awards on record
- 0
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
NLIGHT INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About NLIGHT INC
- Headquarters
- CAMAS, WA 98607-9406
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEIL7A6MYHETLS6
- CAGE3EY27
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
No federal prime awards on record
Contract vehicles
No contract vehicles on file
Proven teaming graph
Primes it has worked under
- RADIANCE TECHNOLOGIES INC
UEI YXRLX5PDCWK4
$5.7M
Subcontractor to this prime · 2 sub-awards · latest Mar 6, 2024
- Department of the Army
- “LASER MRA SUPPORT”
- “MANTECH PROGRAM FOR HIGH EFFICIENCY LOW SWAP DIODE LASER PUMP FOR DIRECTED ENERGY APPLICATIONS”
- MAINSTREAM ENGINEERING CORP
UEI YR8FJBGXWRR1
$594.9K
Subcontractor to this prime · 1 sub-award · latest Jul 18, 2025
- Department of the Air Force
- “1. TASK 1 EPITAXY & DEVICE FABRICATION 2. TASK 2 PROVIDE DESIGN DATA FOR THE E36 MODULE AND ANCILLARY MECHANICAL COLDPLATES FOR THE NLA-N2 3. TASK 3 E36 MODULE FABRICATION & TEST 4. TASK 6 MANAGEMENT & REPORTING”
- THE AEROSPACE CORPORATION
UEI YA8LJBJCND19
$37.5K
Subcontractor to this prime · 1 sub-award · latest Jun 30, 2026
- Department of the Air Force
- “OPTICAL FIBERS”
- LOCKHEED MARTIN ACULIGHT CORPORATION
UEI WYAVK6MSRJ15
$13.6K
Subcontractor to this prime · 1 sub-award · latest Jan 23, 2024
- Department of the Navy
- “OPTIC PUMP DIODE E24I 975.5NM 400W.”
Subcontractors it has used
No reported sub-awards as a prime contractor.
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · as of Nov 9, 2026 · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 56 awards
- Total awarded
- $18,993,588
- By phase
- SBIR Phase I: 34
- SBIR Phase II: 16
- STTR Phase I: 3
- STTR Phase II: 3
- By agency
- Department of Defense: 43
- National Aeronautics and Space Administration: 11
- Department of Energy: 2
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2013: 7
- 2012: 7
- 2011: 4
- 2010: 6
- 2009: 8
- 2008: 7
- 2007: 6
- 2006: 7
- 2005: 1
- 2004: 3
Awards (most recent first)
Multi-kW Fiber Lasers Based on Novel Light Guide Combiners
SBIR Phase I · Department of Defense (Air Force) · 2013 · $149,963
Sep 25, 2013 – Jun 24, 2014
Solicitation 2013.1 (2013) · Topic AF131-011 · Research partner: Stub
High-Efficiency, High-Temperature Laser Diodes for Naval High-Energy Laser Applications
SBIR Phase II · Department of Defense (Navy) · 2013 · $149,426
Sep 19, 2013 – Sep 18, 2014
Solicitation 2012.1 (2012) · Topic N121-013 · Research partner: Stub
Coherent Detection Eye-Safe LIDAR Systems Based on Large Mode Area Fiber Amplifiers
SBIR Phase I · Department of Defense (Air Force) · 2013 · $149,876
Aug 20, 2013 – May 21, 2014
Solicitation 2013.1 (2013) · Topic AF131-150
High-Efficiency Resonantly Pumped 1550-nm Fiber-Based Laser Transmitter
SBIR Phase I · National Aeronautics and Space Administration · 2013 · $124,945
May 23, 2013 – Nov 23, 2013
Solicitation year 2012 · Topic H9.01 · Research partner: Stub
Compact, Rugged, Multiple Spectral Band Laser
SBIR Phase I · Department of Defense (Navy) · 2013 · $79,997
May 2, 2013 – Mar 7, 2014
Solicitation 2013.1 (2013) · Topic N131-083
Wavelength Stabilized Two Dimensional External Cavity Arrays for Pumping Alkali Vapor Laser Systems
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2013 · $99,932
Mar 1, 2013 – Aug 31, 2013
Solicitation 2012.2 (2012) · Topic MDA12-015 · Research partner: Stub
High Efficiency 808-nm VCSEL Arrays with Excellent Beam Quality
SBIR Phase I · Department of Defense (Navy) · 2013 · $79,938
Nov 2, 2012 – Apr 28, 2013
Solicitation 2012.2 (2012) · Topic N122-112 · Research partner: Stub
Ultra-Bright Diode Laser Emitters for Pumping High-Power Fiber Amplifiers
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2012 · $99,943
Started Nov 19, 2012
Solicitation 2012.2 (2012) · Topic SB122-006 · Research partner: Stub
Innovative Passivation to Increase the Power at Which Laser Diode Fails
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2012 · $149,836
Nov 1, 2012 – Aug 1, 2013
Solicitation 2012.2 (2012) · Topic SB122-005 · Research partner: Stub
10 kW Polarization Maintaining Fiber Laser Power Amplifiers
SBIR Phase II · Department of Defense (Missile Defense Agency) · 2012 · $999,710
Started Sep 28, 2012
Solicitation 2010.3 (2010) · Topic MDA10-008 · Research partner: Stub
High Efficiency kW-Class Semiconductor Laser Bars for Inertial Fusion Energy
SBIR Phase II · Department of Energy · 2012 · $999,876
Aug 8, 2012 – Aug 7, 2014
Solicitation DE-FOA-0000676 (2012) · Topic 70 a · Research partner: Stub
Improved High-Power Performance in Fiber Laser Systems
SBIR Phase I · Department of Defense (Navy) · 2012 · $149,598
Jun 7, 2012 – Feb 2, 2014
Solicitation 2012.1 (2012) · Topic N121-068 · Research partner: Stub
High-Efficiency, High-Temperature Laser Diodes for Naval High-Energy Laser Applications
SBIR Phase I · Department of Defense (Navy) · 2012 · $149,907
Jun 4, 2012 – Sep 18, 2013
Solicitation 2012.1 (2012) · Topic N121-013 · Research partner: Stub
Development of line-narrowed diode pumps sources for DPAL systems
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2012 · $148,315
Started Mar 1, 2012
Solicitation 2011.2 (2011) · Topic MDA11-007 · Research partner: Stub
High Energy Laser Technology Innovations for BMDS Directed Energy, Tracking, and Illumination
SBIR Phase II · Department of Defense (Missile Defense Agency) · 2011 · $996,834
Started Oct 1, 2011
Solicitation 2009.3 (2009) · Topic MDA09-037 · Research partner: Stub
10 kW Polarization Maintaining Fiber Laser Power Amplifiers
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2011 · $99,918
Started Aug 15, 2011
Solicitation 2010.3 (2010) · Topic MDA10-008 · Research partner: Stub
High Efficiency kW-Class Semiconductor Laser Bars for Inertial Fusion Energy
SBIR Phase I · Department of Energy · 2011 · $149,935
Jun 17, 2011 – May 16, 2012
Solicitation DE-FOA-0000413 (2011) · Topic 70 a · Research partner: Stub
Wavelength-Stabilized, High-Brightness Diode Laser Pumps for High-Power Fiber Lasers
SBIR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2011 · $98,622
Started Mar 23, 2011
Solicitation 2010.3 (2010) · Topic SB103-005 · Research partner: Stub
Cryogenically-cooled eyesafe laser diode arrays for resonant pumping of Er-doped gain media
SBIR Phase II · Department of Defense (Army) · 2010 · $729,889
Sep 21, 2010 – Sep 15, 2012
Solicitation 2008.2 (2008) · Topic A08-061
Laser Diodes for Eye-Safe LADAR
SBIR Phase II · Department of Defense (Navy) · 2010 · $732,719
Jul 21, 2010 – Jan 20, 2012
Solicitation 2009.1 (2009) · Topic N091-070
High Energy Laser Technology Innovations for BMDS Directed Energy, Tracking, and Illumination
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2010 · $99,779
May 3, 2010 – Nov 2, 2010
Solicitation 2009.3 (2009) · Topic MDA09-037
High Power, Narrow Linewidth 2-micron Diode Laser Sources
SBIR Phase I · Department of Defense (Missile Defense Agency) · 2010 · $99,893
May 3, 2010 – Nov 2, 2010
Solicitation 2009.3 (2009) · Topic MDA09-040
Single-Frequency Semiconductor Lasers Operating at 1.5 and 2.0 microns
SBIR Phase II · National Aeronautics and Space Administration · 2010 · $599,709
Mar 5, 2010 – Dec 20, 2011
Solicitation year 2008 · Topic S1.01
Coherent High Power Diode Laser Array
SBIR Phase I · Department of Defense (Army) · 2010 · $69,818
Nov 1, 2009 – Apr 30, 2010
Solicitation 2009.2 (2009) · Topic A09-119
Eye-safe fiber-coupled laser pumps for high power
SBIR Phase I · Department of Defense (Army) · 2009 · $69,737
Dec 17, 2009 – Jun 30, 2010
Solicitation 2009.2 (2009) · Topic A09-047
Showing the 25 most recent of 56 awards.
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 334413Semiconductor and Related Device ManufacturingPrimarySmall business under this code’s size standard
- 333310Commercial and Service Industry Machinery ManufacturingSmall business under this code’s size standard
- 334418Printed Circuit Assembly (Electronic Assembly) Manufacturing
- 334419Other Electronic Component Manufacturing
- 334511Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument ManufacturingSmall business under this code’s size standard
- 334513Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
- 335921Fiber Optic Cable ManufacturingSmall business under this code’s size standard
- 335999All Other Miscellaneous Electrical Equipment and Component Manufacturing
- 336413Other Aircraft Parts and Auxiliary Equipment ManufacturingSmall business under this code’s size standard
- 336419Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment ManufacturingSmall business under this code’s size standard
- 339999All Other Miscellaneous Manufacturing
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
SAM.gov reports this entity as small under 6 of 12 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with NLIGHT INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
