CACTUS MATERIALS INC
- TEMPE, AZ 85282-3127
- cactusmaterials.com (company website, opens in a new tab)
- Corporate Entity (Not Tax Exempt)
- SAM active
- No verified credentials yet
- CMMCNot on file
- SPRSNone
- FCLVisible to paid members
- Small Business
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
- 36-mo obligations
- $0
- Awards on record
- 0
- Contract vehicles
- 0
- Verified credentials
- 0
Compliance posture: unverified (SAM.gov baseline only)
CACTUS MATERIALS INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
About CACTUS MATERIALS INC
- Headquarters
- TEMPE, AZ 85282-3127
Identifiers
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
- UEISX7VM5R549M7
- CAGE7RWA5
Capabilities & differentiators
No capability narrative yet
Compliance posture
No compliance posture published yet
Facility clearance
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
Past performance
No federal prime awards on record
Contract vehicles
No contract vehicles on file
Proven teaming graph
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR portfolio
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
- Awards on record
- 14 awards
- Total awarded
- $5,904,879
- By phase
- SBIR Phase I: 8
- SBIR Phase II: 3
- STTR Phase I: 2
- STTR Phase II: 1
- By agency
- Department of Energy: 9
- National Aeronautics and Space Administration: 5
- Active projects
- 0 projects
- Projects whose contract end date is today or later.
- Phase II ending within 12 months
- 0 projects
- Phase II projects ending within 12 months. Agencies may award Phase III work without a new competition only when it derives from, extends or completes these projects.
- By year
- 2023: 1
- 2022: 2
- 2021: 4
- 2020: 4
- 2019: 2
- 2018: 1
Awards (most recent first)
Radiation hardened Trench-Isolated Low-Gain Avalanche Diode (TI-LGAD)
SBIR Phase I · Department of Energy · 2023 · $199,999
Jul 10, 2023 – Jul 9, 2024
Solicitation DE-FOA-0002903 (2023) · Topic C56-37a
Radiation hardened double sided Low-Gain Avalanche Diode (LGAD) with small pixel readout for 5D tracking
SBIR Phase II · Department of Energy · 2022 · $1,149,993
Aug 22, 2022 – Aug 21, 2024
Solicitation year 2022 · Topic C48-30b
Novel heavy ion focal plane detectors
SBIR Phase I · Department of Energy · 2022 · $200,000
Feb 14, 2022 – Feb 13, 2023
Solicitation year 2021 · Topic C53-35b
Radiation hardened double sided Low-Gain Avalanche Diode (LGAD) with small pixel readout for 5D tracking
SBIR Phase I · Department of Energy · 2021 · $199,998
Jun 28, 2021 – Jun 27, 2022
Solicitation year 2021 · Topic 36a
Multi-stacked Aligned Wafer Bonding for Wide-bandwidth AR treated silicon optics
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,999
May 17, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic S1
A New Approach to Achieving High Granularity in Low-Gain Avalanche Detectors
SBIR Phase II · Department of Energy · 2021 · $1,149,993
May 3, 2021 – May 2, 2023
Solicitation year 2021 · Topic 34b
Controlling Silver Release from Antimicrobial Surface Coatings for Biofouling Control
STTR Phase II · National Aeronautics and Space Administration · 2021 · $754,999
Jan 15, 2021 – Jan 14, 2023
Solicitation STTR_19_P2 (2019) · Topic T6 · Research partner: Arizona State University
Radiation Hardened Engineered Substrates for Time and Space Resolution
SBIR Phase II · Department of Energy · 2020 · $1,149,993
Aug 24, 2020 – Aug 23, 2022
Solicitation DE-FOA-0002156 (2020) · Topic 30b
Long Term Uses of Potable Water Containing Silver Disinfectant in High Surface to Volume Ratio Metallic Surfaces
STTR Phase I · National Aeronautics and Space Administration · 2020 · $124,990
Aug 17, 2020 – Sep 30, 2021
Solicitation STTR_20_P1 (2020) · Topic T6 · Research partner: Arizona State University
3D integration of high-density CMOS circuits to high resistivity silicon detector layer
SBIR Phase I · Department of Energy · 2020 · $200,000
Jun 29, 2020 – Jun 28, 2021
Solicitation DEFOA0002146 (2020) · Topic 34d
A New Approach to Achieving High Granularity in Low-Gain Avalanche Detectors
SBIR Phase I · Department of Energy · 2020 · $200,000
Feb 18, 2020 – Feb 17, 2021
Solicitation DE-FOA-0002145 (2020) · Topic 34b
Controlling Silver Release from Antimicrobial Surface Coatings for Biofouling Control
STTR Phase I · National Aeronautics and Space Administration · 2019 · $124,995
Aug 19, 2019 – Sep 18, 2020
Solicitation STTR_19_P1 (2019) · Topic T6 · Research partner: Arizona State University
Radiation Hardened Engineered Substrates for Time and Space Resolution
SBIR Phase I · Department of Energy · 2019 · $199,986
Jul 1, 2019 – Mar 31, 2020
Solicitation DE-FOA-0001941 (2019) · Topic 30b
Wafer Level Hybrid Interconnect Aligned (Cu/Oxide) Bonding for 3D Integration of Heterogenous (Si/GaAs) Submillimeter-Wave Arrays
SBIR Phase I · National Aeronautics and Space Administration · 2018 · $124,934
Jul 27, 2018 – Feb 15, 2019
Solicitation SBIR_18_P1 (2018) · Topic S1
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
FedRAMP offerings
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace (opens in a new tab) · sync date not recorded
Exclusions & screening
SAM.gov exclusions
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
Consolidated Screening List
No confirmed match on the Consolidated Screening List (screened Nov 13, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 13, 2026
GSA CALC+ rate benchmark
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates (opens in a new tab) · sync date not recorded
NAICS, PSC & socio-economic status
NAICS codes
- 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)Primary
- 221310Title not in the curated listSmall business under this code’s size standard
- 334413Semiconductor and Related Device ManufacturingSmall business under this code’s size standard
SAM.gov reports this entity as small under 2 of 3 NAICS codes. Size is determined per code (SBA size standards).
Product & service codes (PSC)
No PSC codes reported.
Teaming preferences
This company has not published teaming preferences.
Business development contact
No BD contact published
Corporate hierarchy
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
Data sources & provenance
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Teaming
Ready to team with CACTUS MATERIALS INC?
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
