
Search SAM.gov-registered contractors by mission sector, compliance posture and contract vehicle.
Search
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Open solicitations, teaming requests and recompetes, from SAM.gov and USAspending.
Try an example search
Real filters on live federal data. One click opens the results.
AI capture analysis, capability statement grading and plain-language guides.
Analyze
Teaming agreements and proposals, plus how TeamingIndex verifies, protects and connects your data.
Product
Claim your company, free
Verify your UEI with your work email and control how primes see you. Every badge shows who vouches for it and when.
Claim your profileSee TeamingIndex with real data before you sign up: a finished profile and working searches.
Sample pages
Live demo
Arclight Demo Aerospace & Defense, Inc.
UEI DEMOPRIMEC01 · CAGE 0DEMO · Prime Corporate
A fictional company, built to show every section filled in.
Popular
Registration and small-business types: SAM.gov, synced Nov 9, 2026. Compliance: self-attested by the company unless marked verified. The SPRS chip shows a range, never the exact score. How verification works
VECTOR ATOMIC INC has not claimed this profile. What you see comes from public SAM.gov and USAspending records; no one from the company has confirmed CMMC, SPRS or clearance details yet. Learn more about CMMC 2.0
UEI and CAGE come from SAM.gov. Other identifiers are listed by the company.
Teaming
Send an introduction and propose a mutual NDA. Their team is notified right away, and you can share the capability statement with your capture team.
No capability narrative yet
No compliance posture published yet
Facility clearance: visible to paid members
Clearance levels are shown only to paying members; TeamingIndex does not advertise clearances (NISPOM 32 CFR 117.9). Learn more about facility clearances · Compare plans
No federal prime awards on record
No contract vehicles on file
No sub-award reports yet
Source: USAspending.gov sub-award reports (FSRS) (opens in a new tab) · sync date not recorded · Prime contractors report first-tier subcontracts of $30,000 or more. Amounts are reported sub-award values.
SBIR/STTR awardee — Phase III-eligible for work derived from its SBIR/STTR projects
Agencies may award follow-on Phase III work without a new competition when it builds on this company’s earlier SBIR/STTR projects. Other work is competed as usual.
No FedRAMP Marketplace listing
Source: FedRAMP Marketplace · sync date not recorded
Not yet checked against SAM.gov exclusions.
Agencies generally may not award to excluded parties, and primes may not subcontract with them above the threshold in FAR 52.209-6 (except COTS items) without a compelling reason reported to the contracting officer (FAR 9.405, 9.405-2). Some exclusion types apply only to specific programs: read the record on SAM.gov.
No GSA CALC+ rates on record
Source: GSA CALC+ awarded ceiling rates · sync date not recorded
NAICS codes
SAM.gov does not report this entity as small under any listed NAICS code.
Socio-economic status
No socio-economic certifications reported in SAM.gov.
Product & service codes (PSC)
This company has not published teaming preferences.
No BD contact published
No parent entity reported in SAM.gov.
SBA counts affiliates when it determines whether a business is small (13 CFR 121.103), so a parent’s size can matter for set-aside work.
SAM.gov
Registration, CAGE, NAICS, socio-economic status, corporate hierarchy and exclusions. Last synced Nov 9, 2026.
USAspending.gov
Prime award history and obligations (FPDS), synced nightly.
The contractor
Nothing yet: this profile has not been claimed by the company.
TeamingIndex verification
Credentials marked Verified were checked by a TeamingIndex reviewer; everything else is self-attested.
Corrections
Corrections to SAM.gov data must be made in SAM.gov; TeamingIndex picks them up on the next nightly sync. Go to SAM.gov (opens in a new tab)
Machine-readable: capability.md schema.org JSON-LD embedded in this page.
Zero CUI: TeamingIndex stores verification metadata only, never System Security Plans, POA&Ms or DD Form 254s.
Awards (most recent first)
Iodine Clock with Acceleration- and Radiation-tolerance for Use in Space (ICARUS)
SBIR Phase II · Department of Defense (Air Force) · 2025 · $1,900,000
Sep 30, 2025 – Sep 30, 2027
Solicitation 24.3 (2024) · Topic SF243-D015
Gravimeter using Rubidium Atoms with Vibration-immunity for Maritime and Airborne Platforms (GRAVMAP)
SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2025 · $3,200,000
Sep 30, 2025 – Sep 30, 2027
Solicitation HR001121S0007.I (2021) · Topic HR001121S0007-01
Tunable, Integrated Comb for Timing and Communications (TIC TAC)
STTR Phase II · Department of Defense (Air Force) · 2025 · $1,899,996
Sep 28, 2025 – Sep 29, 2027
Solicitation 23.C (2023) · Topic AF23C-T002 · Research partner: Harvard University
Synthesis and Transmission of Absolutely Referenced Broadband Ultrastable Radiation for Synchronization and Timing (STARBURST)
STTR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2025 · $3,600,000
May 19, 2025 – May 18, 2028
Solicitation 24.D (2024) · Topic HR0011ST2024D-01 · Research partner: University of Colorado at Boulder
Miniature Iodine Nanosecond Timekeeper (MINT)
SBIR Phase II · Department of Defense (Missile Defense Agency) · 2025 · $1,999,999
Feb 12, 2025 – Feb 11, 2027
Solicitation 24.2 (2024) · Topic MDA242-D002
Tunable, Integrated Comb for Timing and Communications (TIC TAC)
STTR Phase I · Department of Defense (Air Force) · 2024 · $199,986
Sep 30, 2024 – Mar 31, 2025
Solicitation 23.C (2023) · Topic AF23C-T002 · Research partner: Harvard University
Synthesis and Transmission of Absolutely Referenced Broadband Ultrastable Radiation for Synchronization and Timing (STARBURST)
STTR Phase I · Department of Defense (Defense Advanced Research Projects Agency) · 2024 · $200,000
Jun 5, 2024 – Nov 5, 2024
Solicitation 24.D (2024) · Topic HR0011ST2024D-01 · Research partner: University of Colorado at Boulder
Pulsed Ultrastable Lasers for Synthetic Aperture Radar (PULSAR)
SBIR Phase II · Department of Defense (Navy) · 2024 · $1,000,000
Apr 9, 2024 – Oct 20, 2026
Solicitation 23.1 (2023) · Topic N231-014
Pulsed Ultrastable Lasers for Synthetic Aperture Radar (PULSAR)
SBIR Phase I · Department of Defense (Navy) · 2023 · $240,000
May 22, 2023 – Aug 12, 2024
Solicitation 23.1 (2023) · Topic N231-014
Circuit Integration for Robust Quantum Information Technology Scalability (CIRQuITS)
STTR Phase II · Department of Defense (Army) · 2022 · $1,199,999
Sep 30, 2022 – Sep 30, 2024
Solicitation 18.B (2018) · Topic A18B-T014 · Research partner: Stanford University
Compact, Optically Stabilized Molecular Iodine Clock (COSMIC)
SBIR Phase II · Department of Defense (Army) · 2021 · $702,298
Sep 10, 2021 – Feb 4, 2022
Solicitation 20.2 (2020) · Topic A20-D01
Product-Ready Iodine Clock Enabled by Low-Environmental Sensitivity Subsystems (PRICELESS)
SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2021 · $5,249,991
Aug 20, 2021 – Sep 29, 2025
Solicitation HR001121S0007.I (2021) · Topic HR001121S0007-01
Comb Using Photonically Integrated Devices (CUPID)
SBIR Phase II · National Aeronautics and Space Administration · 2021 · $749,966
Jul 29, 2021 – Jul 28, 2023
Solicitation SBIR_20_P2 (2020) · Topic S1
Miniature Iodine-Stabilized Oscillator (MISO)
SBIR Phase I · National Aeronautics and Space Administration · 2021 · $124,911
May 2, 2021 – Nov 19, 2021
Solicitation SBIR_21_P1 (2021) · Topic S1
Photonically-Integrated Rubidium Inertial Measurement Unit for Space (PRIMUS)
SBIR Phase II · Department of Defense (Air Force) · 2021 · $749,987
Apr 15, 2021 – Apr 15, 2023
Solicitation 18.2 (2018) · Topic AF182-072
Comb Using Photonically Integrated Devices (CUPID)
SBIR Phase I · National Aeronautics and Space Administration · 2020 · $117,261
Aug 30, 2020 – Mar 1, 2021
Solicitation SBIR_20_P1 (2020) · Topic S1
Photonically-Integrated Rubidium Atomic Navigator (PIRANa)
SBIR Phase I · Department of Defense (Navy) · 2020 · $139,940
Jun 1, 2020 – Nov 30, 2020
Solicitation 20.1 (2020) · Topic N201-082
Heterodyne Integrated Photonics Package for Optical Synchronization (HIPPOS)
SBIR Phase II · Department of Defense (Defense Advanced Research Projects Agency) · 2020 · $1,498,814
Feb 3, 2020 – Feb 2, 2022
Solicitation DARPA SBIR HR001119S0035-04 (2019) · Topic HR001119S0035-04
Versatile Iodine Platform Enabled Reference (VIPER)
SBIR Phase II · Department of Defense (Navy) · 2020 · $1,509,940
Dec 6, 2019 – Dec 14, 2022
Solicitation 18.1 (2018) · Topic N181-037
Circuit Integration for Robust Quantum Information Technology Scalability (CIRQuITS)
STTR Phase II · Department of Defense (Army) · 2020 · $999,998
Nov 25, 2019 – Nov 24, 2021
Solicitation 18.B (2018) · Topic A18B-T014 · Research partner: Stanford University
Circuit Integration for Robust Quantum Information Technology Scalability (CIRQuITS)
STTR Phase I · Department of Defense (Army) · 2019 · $149,993
Nov 29, 2018 – May 1, 2019
Solicitation 18.B (2018) · Topic A18B-T014 · Research partner: Stanford University
FLatpack Accelerometer-Gyroscope Sensor using Hybrid Integrated Photonics (FLAGSHIP)
SBIR Phase I · Department of Defense (Air Force) · 2018 · $150,000
Sep 18, 2018 – Sep 18, 2019
Solicitation 2018.1 (2018) · Topic AF181-006
Versatile Iodine Platform Enabled Reference (VIPER )
SBIR Phase I · Department of Defense (Navy) · 2018 · $124,999
Aug 1, 2018 – Sep 23, 2019
Solicitation 18.1 (2018) · Topic N181-037
Compact, Long-Lifetime Atom Source for Space (CLASS)
SBIR Phase I · National Aeronautics and Space Administration · 2018 · $124,893
Jul 27, 2018 – Feb 15, 2019
Solicitation SBIR_18_P1 (2018) · Topic S1
Source: SBIR.gov award data file (opens in a new tab) · as of Nov 12, 2026 · file published Nov 1, 2026
Source: SAM.gov Exclusions (opens in a new tab) · sync date not recorded
No confirmed match on the Consolidated Screening List (screened Nov 12, 2026).
The list combines Commerce, State and Treasury export-control and sanctions lists. A “no match” result is a name-and-address screen, not an export-compliance determination.
Source: ITA Consolidated Screening List (opens in a new tab) · as of Nov 12, 2026
PSC names from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.