Sources sought · SAM.gov
66--IRA - High-Temperature Chamber Furnace
Department of Energy
Key facts
- Response deadline
- Due in 2 daysEastern Time. Late responses are usually not accepted.
- Set-aside
- Full & openAny responsible firm may compete as prime; small businesses can still team. Learn more about small-business set-asides
- NAICS
- 333994The industry code sets the size standard you must meet to compete as a small business. Learn more about NAICS size standards
- Product / service code (PSC)
- 6640 · LABORATORY EQUIPMENT AND SUPPLIESName from the Acquisition.gov PSC Manual (opens in a new tab) (April 2025 edition), checked Nov 12, 2026.
- Place of performance
- Not listed
- Notice type
- Sources sought
- Posted
- Archive date
- SAM.gov removes the notice from active search after this date.
- Solicitation number
- 89243327NEX000003
- SAM.gov notice ID
- 1c49db41c3ed48d8a2b515db088a9727
- Buying organization
- Department of Energy
- Department of Energy
- National Energy Technology Laboratory
Source: SAM.gov Contract OpportunitiesSynced First seen Nov 10, 2026Official notice (opens SAM.gov in a new tab)
See how this RFP fits your company
Claim your free UEI profile and TeamingIndex checks every notice against your SAM.gov NAICS codes, size, set-aside status and past performance, explains the fit, and emails you new matches.
This amendment is to address several requests for clarifications associated with our Technical Specifications.
Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system?
A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system.
Show the full descriptionHide the rest of the description
Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel?
A2: NETL is responsible for installing all necessary hardwire drops or disconnects.
Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output?
A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines.
Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions?
A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
Plain text from SAM.gov (formatting removed; at most 20,000 characters). The official notice and its attachments govern.